VDOT contract C0000127226N01 bid tabulation
On-call guardrail improvements. Let by Virginia DOT on November 19, 2025, Culpeper, Staunton. 2 bids received; low bid $864,455 by Makco, Incorporated.
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 59
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Makco, Incorporated | $864,455 | Low |
| 2 | L. S. Lee, Inc. | $1,023,114 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Makco, Incorporated | 2. L. S. Lee, Inc. |
|---|---|---|---|---|---|
| 0001-0010 | Borrow excavation (303SD20-0007) | CY | 8 | $100.00 | $175.00 |
| 0001-0020 | Temp. silt fence type A (303SD20-0034) | LF | 50 | $5.00 | $3.00 |
| 0001-0030 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 1,000 | $60.00 | $120.00 |
| 0001-0040 | Shoulder maintenance material (305SP20-0004) | TON | 100 | $50.00 | $90.00 |
| 0001-0050 | Machining shoulders (305SP20-0005) | LF | 3,700 | $5.00 | $7.00 |
| 0001-0060 | Manual shoulders restoration (305SP20-0006) | LF | 5 | $20.00 | $15.00 |
| 0001-0070 | Asphalt concrete TY. SM- 9.5A const (315SD20-0007) | TON | 20 | $300.00 | $2,300.00 |
| 0001-0080 | Erosion control riprap (414SD20-0053) | TON | 5 | $145.00 | $200.00 |
| 0001-0090 | NS saw cut H.C.C. items saw cut HCC items (502SX20-0010) | LF | 2 | $50.00 | $12.00 |
| 0001-0100 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 50 | $1,000.00 | $950.00 |
| 0001-0110 | Guardrail GR-MGS1 (505SD20-0011) | LF | 2,500 | $35.00 | $34.00 |
| 0001-0120 | Guardrail GR-MGS1A (505SD20-0012) | LF | 50 | $45.00 | $55.00 |
| 0001-0130 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 50 | $45.00 | $40.00 |
| 0001-0140 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 40 | $40.00 | $50.00 |
| 0001-0150 | Radial guardrail GR- MGS1A (505SD20-0015) | LF | 40 | $50.00 | $60.00 |
| 0001-0160 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 20 | $50.00 | $70.00 |
| 0001-0170 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 6 | $1,350.00 | $2,000.00 |
| 0001-0180 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 40 | $1,500.00 | $1,500.00 |
| 0001-0190 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 20 | $160.00 | $180.00 |
| 0001-0200 | Guardrail terminal GR-7 NCHRP 350 (505SD20-0028) | EACH | 2 | $3,000.00 | $4,200.00 |
| 0001-0210 | Guardrail terminal GR-11 (505SD20-0029) | EACH | 2 | $1,000.00 | $1,900.00 |
| 0001-0220 | Guardrail GR-2 (505SD20-0030) | LF | 100 | $35.00 | $33.00 |
| 0001-0230 | Guardrail GR-2 8' post (505SD20-0032) | LF | 40 | $45.00 | $54.00 |
| 0001-0240 | Guardrail GR-2A (505SD20-0033) | LF | 25 | $45.00 | $45.00 |
| 0001-0250 | Rad. guardrail GR-2 (505SD20-0034) | LF | 25 | $40.00 | $50.00 |
| 0001-0260 | Rad. guardrail GR-2A (505SD20-0035) | LF | 25 | $50.00 | $55.00 |
| 0001-0270 | Alt.breakaway cable term. GR-9 (505SD20-0038) | EACH | 3 | $4,500.00 | $4,200.00 |
| 0001-0280 | Guardrail GR-10 (505SD20-0040) | LF | 250 | $40.00 | $75.00 |
| 0001-0290 | Fixed object attach. GR- foa-1 TY. I (505SD20-0045) | EACH | 2 | $2,750.00 | $3,800.00 |
| 0001-0300 | Fixed object attach. GR- foa-1 TY. II (505SD20-0046) | EACH | 2 | $600.00 | $1,000.00 |
| 0001-0310 | Fixed object attach. GR- foa-3 TY. I (505SD20-0047) | EACH | 2 | $2,750.00 | $3,800.00 |
| 0001-0320 | Fixed object attach. GR- foa-3 TY.II (505SD20-0048) | EACH | 2 | $600.00 | $1,000.00 |
| 0001-0330 | Fixed object attach. GR- foa-4 TY. I (505SD20-0050) | EACH | 1 | $3,000.00 | $4,200.00 |
| 0001-0340 | Fixed object attach. GR- foa-4 TY. II (505SD20-0051) | EACH | 1 | $2,750.00 | $4,800.00 |
| 0001-0350 | Fixed object attach. GR- foa-4 TY. III (505SD20-0052) | EACH | 1 | $700.00 | $6,300.00 |
| 0001-0360 | Fixed object attach. GR- foa-2 TY. I (505SD20-0053) | EACH | 2 | $2,750.00 | $3,800.00 |
| 0001-0370 | Fixed object attach. GR- foa-2 TY. II (505SD20-0054) | EACH | 2 | $600.00 | $1,000.00 |
| 0001-0380 | Median barrier MB-3 (505SD20-0059) | LF | 25 | $50.00 | $65.00 |
| 0001-0390 | Remove existing guardrail (505SD20-0073) | LF | 4,500 | $10.00 | $10.00 |
| 0001-0400 | NS SP. des. GR.BR.attach BR-GR type I (run-on) (505SX20-0044) | EACH | 2 | $6,000.00 | $8,700.00 |
| 0001-0410 | NS SP. des. GR.BR.attach BR-GR type II (run-off) (505SX20-0044) | EACH | 2 | $800.00 | $8,700.00 |
| 0001-0420 | NS guardrail reset existing guardrail / adjust existing guardrail beam (505SX20-0057) | LF | 10 | $25.00 | $18.00 |
| 0001-0430 | NS guardrail GR-MGS-2 end term. site prep. 4' moderate (505SX20-0058) | EACH | 15 | $1,000.00 | $1,200.00 |
| 0001-0440 | NS guardrail GR-MGS-2 end term. site prep. 6' moderate (505SX20-0058) | EACH | 30 | $1,000.00 | $1,200.00 |
| 0001-0450 | NS guardrail guardrail post leave-out (505SX20-0058) | EACH | 230 | $75.00 | $125.00 |
| 0001-0460 | NS guardrail hand dig guardrail post hole (505SX20-0058) | EACH | 25 | $400.00 | $350.00 |
| 0001-0470 | NS guardrail median barrier GR-9 terminal (505SX20-0058) | EACH | 1 | $6,000.00 | $11,200 |
| 0001-0480 | NS guardrail terminal GR-MGS2 (TL-2) (505SX20-0058) | EACH | 3 | $4,500.00 | $3,800.00 |
| 0001-0490 | NS guardrail terminal GR-MGS2 (TL-3) (505SX20-0058) | EACH | 57 | $5,000.00 | $4,200.00 |
| 0001-0500 | NS guardrail terminal site prep. minor (505SX20-0058) | EACH | 2 | $1,000.00 | $1,200.00 |
| 0001-0510 | NS impact attenuator impact attenuation unit (505SX20-0070) | EACH | 1 | $32,500 | $48,000 |
| 0001-0520 | Truck mounted attenuator (512SD20-0023) | HR | 200 | $30.00 | $0.01 |
| 0001-0530 | Group 2 channelizing devices (512SD20-0024) | DAY | 700 | $1.00 | $0.01 |
| 0001-0540 | Port.changeable mess. sign (512SD20-0025) | HR | 25 | $5.00 | $35.00 |
| 0001-0550 | Electronic arrow board (512SD20-0026) | HR | 100 | $5.00 | $0.01 |
| 0001-0560 | Flagger service (512SD20-0027) | HR | 225 | $30.00 | $65.00 |
| 0001-0570 | Portable temporary rumble strip array (512SP20-0001) | DAY | 25 | $100.00 | $100.00 |
| 0001-0580 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 15 | $12.00 | $6.00 |
| 0001-0590 | Guardrail delineator (702SD20-0001) | EACH | 25 | $10.00 | $18.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.