Shoulder maintenance material, VDOT 305SP20-0004

Low bidders on VDOT contracts carried a median of $50.00 per TON for this item, over the 24 months to 28 OCT 2026, across 5 low bids. Half of all 12 bids fell between $50.00 and $72.50.

Owner
Virginia DOT
Item
305SP20-0004
Unit
TON
Data through
28 OCT 2026

VDOT has bid this work under more than one code: 16243 on lettings from 22 JAN 2020 to 25 AUG 2021 (265 bids); 305SP20-0004 on lettings from 19 NOV 2025 to 26 AUG 2026 (12 bids). They are combined here into one trend.

$50.00Low bidder's median, per TON
$65.00Median of all bids, per TON
5Contracts in the window

By year of letting

Shoulder maintenance material, VDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20203328$39.5075$45.00
20216253$43.61139$50.00
202511$50.002$70.00
202644$45.0010$65.00

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Northern Virginia31$50.0091$70.00
Salem10$40.0030$47.75
Richmond9$30.0025$30.00
Fredericksburg7$30.5020$36.50
Staunton7$50.0017$50.00
Hampton Roads6$85.9415$62.73
Bristol8$41.8010$43.86
Lynchburg5$50.009$50.00
Culpeper3$32.289$32.28
Shoulder maintenance material, VDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Quantity (TON)Low bidsLow-bid median
1 to 121$40.00
1 to 122$44.30
1 to 121$40.00
1 to 1,00022$50.00
Shoulder maintenance material, VDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

BidderLines bidLowest on the line
Allan Myers Va, Inc.2717 (63%)
Eurovia Atlantic Coast LLC DBA Virginia Paving Company259 (36%)
Julius Branscome, Inc.87 (88%)
Arthur Construction Co., Inc.186 (33%)
Chemung Contracting Corporation76 (86%)
Branscome Inc.135 (38%)
Shoulder maintenance material, VDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
26 AUG 2026C0000129448N01Salem500$40.00$65.003Makco, IncorporatedVDOT
26 AUG 2026C0000129449N01Salem500$40.00$65.003Makco, IncorporatedVDOT
27 MAY 2026C0000126851N01Salem1,000$50.00$80.003Makco, IncorporatedVDOT
25 MAR 2026C0000128232N01Lynchburg1,000$50.00$50.001Makco, IncorporatedVDOT
19 NOV 2025C0000127226N01Staunton100$50.00$70.002Makco, IncorporatedVDOT
25 AUG 2021C0000000118723Northern Virginia1$1,022.08$50.003Allan Myers Va, Inc.VDOT
28 JUL 2021C0000118718N01Northern Virginia1$135.00$70.003Jireh Contracting, Inc.VDOT
28 JUL 2021CM521PMJ118796Hampton Roads1$210.29$85.003Branscome Inc.VDOT
26 MAY 2021CM21PMS116961BRichmond1$36.00$60.002Allan Myers Va, Inc.VDOT
28 APR 2021C0000118247N01Northern Virginia1$50.00$50.003Jireh Contracting, Inc.VDOT
28 APR 2021C0000118379N01Northern Virginia1$120.00$120.003Eurovia Atlantic Coast LLC DBA Virginia Paving CompanyVDOT
28 APR 2021CM221PM7118378Salem1n/a$45.501Adams Construction CompanyVDOT
28 APR 2021CM421PM2117929Richmond1$75.00$50.003Allan Myers Va, Inc.VDOT
28 APR 2021CM621PMK118382Fredericksburg1$65.00$100.003Eurovia Atlantic Coast LLC DBA Virginia Paving CompanyVDOT
24 MAR 2021C0000116989N01Northern Virginia1$295.00$360.002Eurovia Atlantic Coast LLC DBA Virginia Paving CompanyVDOT
Latest VDOT contracts carrying Shoulder maintenance material

Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.

How these prices were read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the VDOT letting of 28 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy