Arthur Construction Co., Inc.: VDOT bid record

Arthur Construction Co., Inc. submitted 226 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 23 SEP 2026, and was the low bidder on 85 of them (38%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Virginia DOT
Low bid volume
$147,942,229
Latest bid
23 SEP 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

226Bids
85Low bids
38Win rate, percent
+9.0%Median gap to the low bid when not low, 141 bids

By year

YearBidsLow bidsWin rate
20023267%
200622100%
20073133%
20084125%
20093133%
20106467%
201115853%
201213862%
201317847%
2014201050%
201515747%
201618844%
201721733%
201814429%
201914536%
202012217%
20212215%
202511218%
202613431%
Arthur Construction Co., Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Northern Virginia1776939%
Staunton241042%
Fredericksburg9111%
Culpeper7114%
Richmond4125%
Salem22100%
Bristol2150%
Hampton Roads100%
Arthur Construction Co., Inc., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Flexible pave.planing 0"-2"515SD20-0013SY11668 (59%)$1.85$1.90
Flagger service512SD20-0027HR15160 (40%)$25.00$20.00
Agr. base mat. TY.I or II no. 21A or 21B305SP20-0003TON8852 (59%)$40.00$33.78
Truck mounted attenuator512SD20-0023HR7651 (67%)$20.00$20.00
Temp. PVMT MRKG TY. A, 4"512SD20-0046LF6751 (76%)$0.05$0.12
Type B class I PVMT line MRKG 24"704SD20-0010LF15746 (29%)$8.15$7.50
Group 2 channelizing devices512SD20-0024DAY9444 (47%)$1.00$1.00
Surf. preparation & restoration type II16502TON7242 (58%)$95.00$105.50
NS saw-cut asph conc full depth315SX20-0011LF6942 (61%)$3.00$5.00
Aggr. base matl. TY. I no. 21B308SD20-0012TON5241 (79%)$29.25$26.00
Electronic arrow board512SD20-0026HR8536 (42%)$5.00$5.00
Inlet protection type B303SD20-0031EACH7836 (46%)$200.00$250.00
Arthur Construction Co., Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Superior Paving Corporation5536 of 55
A & M Concrete Corp.4212 of 42
Fort Myer Construction Corporation409 of 40
Virginia Paving Co., Div. of the Lane Constr. Corp.3420 of 34
Finley Asphalt & Sealing, Inc.3216 of 32
Eurovia Atlantic Coast LLC DBA Virginia Paving Company2820 of 28
Julius Branscome, Inc.2420 of 24
Francis O. Day Co., Inc.209 of 20
Allan Myers Va, Inc.199 of 19
EUROVIA ATLANTIC COAST LLC dba VIRGINIA175 of 17
Arthur Construction Co., Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 SEP 2026C0000128748N01Northern VirginiaOn call ada curb ramp improvements2 of 3$586,701+8.0%
22 JUL 2026C0000128831P01Northern Virginia2027 plant mix - secondary1 of 5$3,519,551Low, 6.0% under the second
22 JUL 2026C0000128797P01Northern Virginia2027 plant mix - secondary1 of 5$2,784,551Low, 3.0% under the second
24 JUN 2026C0000128731N01FredericksburgOn-call - ada curb ramp improvements3 of 4$498,095+50%
24 JUN 2026C0000128466N01CulpeperOn call ada compliance ramps2 of 3$396,660+27%
27 MAY 2026C0000119644C01StauntonSmart scale - intersection improvements1 of 2$1,235,551Low, 28% under the second
25 MAR 2026C0000126858N01SalemOn-call ada compliance curb ramp improvements1 of 6$699,995Low, 10% under the second
04 FEB 2026CM626PM2126039Fredericksburg2026 plant mix - secondary4 of 5$1,710,551+7.0%
04 FEB 2026CM626PM3127175Fredericksburg2026 plant mix - secondary4 of 4$4,999,551+18%
04 FEB 2026CM726PME127461Culpeper2026 plant mix - secondary4 of 4$3,715,551+5.0%
04 FEB 2026C0000128019P01Northern Virginia2026 plant mix - secondary3 of 5$2,634,551+7.0%
14 JAN 2026C0000127750P01Northern Virginia2026 plant mix - secondary3 of 5$5,085,551+2.0%
14 JAN 2026C0000128195P01Northern Virginia2026 plant mix - primary4 of 4$6,167,551+10%
17 DEC 2025CM726PMC127463Culpeper2026 plant mix - secondary3 of 3$3,404,551+6.0%
17 DEC 2025C0000128018P01Northern Virginia2026 plant mix - secondary1 of 4$2,389,551Low, 9.0% under the second
17 DEC 2025C0000128016P01Northern Virginia2026 plant mix - secondary2 of 4$2,924,551+15%
17 DEC 2025C0000127755P01Northern Virginia2026 plant mix - secondary2 of 5$2,439,5510.0%
17 DEC 2025C0000127754P01Northern Virginia2026 plant mix - secondary2 of 5$2,989,551+9.0%
17 DEC 2025C0000127751P01Northern Virginia2026 plant mix - secondary2 of 5$4,805,551+1.0%
17 DEC 2025C0000118871C01BCulpeperSmart scale - shared use path2 of 3$2,299,551+20%
17 DEC 2025C0000125882N01FredericksburgTrench widening6 of 6$1,225,551+91%
19 NOV 2025C0000128015P01Northern Virginia2026 plant mix - secondary3 of 6$3,765,551+10%
19 NOV 2025C0000127753P01Northern Virginia2026 plant mix - secondary4 of 6$3,551,551+3.0%
22 OCT 2025C0000127769N01Northern VirginiaOn-call rural rustic road1 of 5$1,999,551Low, 17% under the second
27 OCT 2021C0000107022N01StauntonHsip-5138 (207)0050-034-877, n5013 of 3$4,637,227+45%
Arthur Construction Co., Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.