VDOT contract C0000127750P01 bid tabulation
2026 plant mix - secondary. Let by Virginia DOT on January 14, 2026, Fairfax, Northern Virginia. 5 bids received; low bid $4,998,464 by Chemung Contracting Corporation.
- Owner
- Virginia DOT
- Letting
- 14 JAN 2026
- Pay items
- 39
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chemung Contracting Corporation | $4,998,464 | Low |
| 2 | Allan Myers Va, Inc. | $5,083,777 | +2.0% |
| 3 | Arthur Construction Co., Inc. | $5,085,551 | +2.0% |
| 4 | EUROVIA ATLANTIC COAST LLC dba VIRGINIA | $5,113,410 | +2.0% |
| 5 | Superior Paving Corporation | $5,178,120 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chemung Contracting Corporation | 2. Allan Myers Va, Inc. | 3. Arthur Construction Co., Inc. | 4. EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 5. Superior Paving Corporation |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Inlet protection type B (303SD20-0031) | EACH | 148 | $0.01 | $0.01 | $50.00 | $100.00 | $1.04 |
| 0001-0020 | Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003) | TON | 48 | $40.00 | $130.00 | $40.00 | $200.00 | $85.53 |
| 0001-0030 | Tack coat (310SD20-0001) | GAL | 38,405 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0001-0040 | Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049) | TON | 36,307.09 | $96.15 | $113.26 | $108.50 | $92.25 | $100.50 |
| 0001-0050 | Surface preparation and restoration type II (323SD20-0041) | TON | 502 | $130.00 | $80.00 | $85.00 | $180.00 | $75.00 |
| 0001-0060 | Flagger service (512SD20-0027) | HR | 1,296 | $35.00 | $30.70 | $25.00 | $35.00 | $35.00 |
| 0001-0070 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 201,734 | $0.14 | $0.14 | $0.14 | $0.01 | $0.15 |
| 0001-0080 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 18,503 | $0.15 | $0.15 | $0.15 | $0.15 | $0.16 |
| 0001-0090 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 8,944 | $0.16 | $0.16 | $0.16 | $0.16 | $0.17 |
| 0001-0100 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 2,103 | $1.22 | $1.22 | $1.22 | $1.25 | $1.27 |
| 0001-0110 | Temp. PVMT MRKG TY. A, 24" (512SD20-0050) | LF | 4,778 | $2.50 | $2.50 | $2.50 | $2.50 | $2.60 |
| 0001-0120 | Temp. PVMT. symb. MRKG thru arrow TY. A (512SD20-0051) | EACH | 2 | $53.19 | $53.19 | $55.00 | $57.00 | $55.33 |
| 0001-0130 | Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052) | EACH | 69 | $55.26 | $55.26 | $56.00 | $60.00 | $57.48 |
| 0001-0140 | NS maintenance of traffic MOT (512SP20-0002) | LS | 1 | $75,000 | $7,016.43 | $149,845 | $211,850 | $96,000 |
| 0001-0150 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 384,047.27 | $1.20 | $0.05 | $0.01 | $1.45 | $1.00 |
| 0001-0160 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 50,861 | $0.25 | $0.25 | $0.30 | $0.25 | $2.08 |
| 0001-0170 | 14/2 conductor cable shielded (700SD20-0120) | LF | 300 | $5.00 | $5.00 | $5.50 | $5.00 | $1.04 |
| 0001-0180 | Conduit metal 1" (700SD20-0183) | LF | 431 | $5.00 | $5.00 | $5.50 | $5.00 | $5.20 |
| 0001-0190 | Loop saw cut 3/8" (703SD20-0042) | LF | 13,713 | $14.00 | $14.00 | $15.00 | $14.00 | $13.00 |
| 0001-0200 | Loop saw cut 5/8" (703SD20-0043) | LF | 3,137 | $24.25 | $24.25 | $26.25 | $24.25 | $26.00 |
| 0001-0210 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 196,223 | $1.05 | $1.05 | $1.10 | $1.05 | $1.09 |
| 0001-0220 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 34,460 | $1.21 | $1.21 | $1.25 | $1.25 | $1.26 |
| 0001-0230 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 9,494 | $1.58 | $1.58 | $1.65 | $1.60 | $1.64 |
| 0001-0240 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 2,765 | $3.62 | $3.62 | $3.80 | $3.65 | $3.77 |
| 0001-0250 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 12,312 | $12.00 | $12.00 | $12.60 | $12.00 | $12.48 |
| 0001-0260 | PVMT symb MRKG thru arrow TY B, CL I (704SD20-0044) | EACH | 7 | $180.54 | $180.54 | $200.00 | $180.75 | $187.78 |
| 0001-0270 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 331 | $126.48 | $126.48 | $135.00 | $126.50 | $131.55 |
| 0001-0280 | MRKG DBL turn arr. thru/LT or RT TY A (704SD20-0049) | EACH | 5 | $77.92 | $77.92 | $85.00 | $78.00 | $81.04 |
| 0001-0290 | DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050) | EACH | 23 | $242.66 | $242.66 | $255.00 | $242.75 | $252.39 |
| 0001-0300 | Symb MRKG lane reduction arr TY B CL I (704SD20-0059) | EACH | 2 | $859.07 | $859.07 | $900.00 | $860.00 | $893.52 |
| 0001-0310 | PVMT symb MRKG yield 1' X 1.5' TY B, CL I (704SD20-0083) | EACH | 21 | $108.64 | $108.64 | $115.00 | $108.75 | $113.00 |
| 0001-0320 | Symb MRKG bicycle thru arrow TY B CL I (704SD20-0095) | EACH | 14 | $112.61 | $112.61 | $120.00 | $112.75 | $117.13 |
| 0001-0330 | Symb MRKG helmeted bicyclist TY B CL I (704SD20-0101) | EACH | 56 | $300.26 | $300.26 | $315.00 | $300.25 | $312.30 |
| 0001-0340 | PVMT symb MRKG shared lane TY B CL I (704SD20-0104) | EACH | 15 | $343.15 | $343.15 | $360.00 | $345.00 | $356.91 |
| 0001-0350 | PVMT MSG. mark. “only” TY B, CL. I, 8’ (704SD20-0107) | EACH | 49 | $353.73 | $353.73 | $375.00 | $355.00 | $367.91 |
| 0001-0360 | PVMT MSG. mark. “school” TY B, CL I, 8’ (704SD20-0110) | EACH | 4 | $843.68 | $843.68 | $890.00 | $845.00 | $877.51 |
| 0001-0370 | NS pave. message marking "slow" TY. B, CL. I (704SX20-0005) | EACH | 5 | $1,072.59 | $1,072.59 | $1,150.00 | $1,075.00 | $228.16 |
| 0001-0380 | NS pave. message marking bicycle detector symbol (704SX20-0005) | EACH | 1 | $219.36 | $219.36 | $250.00 | $220.00 | $78.01 |
| 0002-0390 | NS select material alternate shoulder materials (305SX20-0006) | TON | 1 | $40.00 | $129.00 | $50.00 | $195.00 | $53.04 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of January 14, 2026. Compiled by Mirage Metrics.