Chemung Contracting Corporation: VDOT bid record
Chemung Contracting Corporation submitted 186 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 22 JUL 2026, and was the low bidder on 40 of them (22%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $110,241,393
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 5 | 0 | 0% |
| 2003 | 7 | 2 | 29% |
| 2004 | 5 | 2 | 40% |
| 2005 | 7 | 0 | 0% |
| 2006 | 5 | 0 | 0% |
| 2007 | 6 | 2 | 33% |
| 2008 | 9 | 3 | 33% |
| 2009 | 11 | 2 | 18% |
| 2010 | 5 | 0 | 0% |
| 2011 | 13 | 4 | 31% |
| 2012 | 10 | 0 | 0% |
| 2013 | 6 | 2 | 33% |
| 2014 | 6 | 1 | 17% |
| 2015 | 12 | 1 | 8% |
| 2016 | 20 | 4 | 20% |
| 2017 | 10 | 3 | 30% |
| 2018 | 5 | 0 | 0% |
| 2019 | 8 | 5 | 63% |
| 2020 | 7 | 1 | 14% |
| 2021 | 9 | 2 | 22% |
| 2025 | 7 | 0 | 0% |
| 2026 | 13 | 6 | 46% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Culpeper | 80 | 14 | 18% |
| Staunton | 64 | 18 | 28% |
| Northern Virginia | 25 | 5 | 20% |
| Fredericksburg | 17 | 3 | 18% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Agr. base mat. TY.I or II no. 21A or 21B | 305SP20-0003 | TON | 127 | 66 (52%) | $25.00 | $33.78 |
| NS pavement marking "U- turn arrow" TY B CL I | 704SX20-0002 | EACH | 112 | 58 (52%) | $427.50 | $315.00 |
| Type A PVMT line MRKG 4" | 704SD20-0001 | LF | 97 | 49 (51%) | $0.18 | $0.24 |
| Type B class I PVMT line MRKG 24" | 704SD20-0010 | LF | 64 | 37 (58%) | $7.47 | $7.50 |
| Snow plow. raised pave. marker asph.conc | 54217 | EACH | 48 | 34 (71%) | $21.85 | $27.00 |
| 14/1 conductor cable enclosed | 700SD20-0118 | LF | 38 | 28 (74%) | $0.75 | $1.50 |
| Loop saw cut 5/8" | 703SD20-0043 | LF | 35 | 26 (74%) | $17.00 | $20.52 |
| NS pavement marking type B class VI contrast PVMT MRKG 12" | 704SX20-0001 | LF | 64 | 25 (39%) | $8.78 | $3.00 |
| Loop saw cut 3/8" | 703SD20-0042 | LF | 35 | 25 (71%) | $9.50 | $12.00 |
| Type A PVMT line MRKG 24" | 704SD20-0005 | LF | 43 | 24 (56%) | $3.50 | $4.42 |
| Erad. of exist.nonlinear pav.mark | 54106 | SF | 30 | 24 (80%) | $3.33 | $4.00 |
| Pavement message mark. elongated arrow single | 54300 | EACH | 27 | 23 (85%) | $86.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Paving Corporation | 95 | 71 of 95 |
| S. L. Williamson Company, Incorporated | 65 | 44 of 65 |
| Julius Branscome, Inc. | 32 | 24 of 32 |
| Allan Myers Va, Inc. | 29 | 22 of 29 |
| Virginia Paving Co., Div. of the Lane Constr. Corp. | 19 | 12 of 19 |
| Arthur Construction Co., Inc. | 12 | 4 of 12 |
| EUROVIA ATLANTIC COAST LLC dba VIRGINIA | 12 | 4 of 12 |
| Kickin Asphalt Paving and Excavating, LLC | 10 | 5 of 10 |
| General Excavation, Inc. | 9 | 7 of 9 |
| W-L Construction & Paving, Inc. | 8 | 3 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000128729N01 | Culpeper | 2027 plant mix - primary | 1 of 3 | $2,241,640 | Low, 5.0% under the second |
| 25 MAR 2026 | C0000127819N01 | Staunton | Shoulder widening, rumble strips, guardrail | 3 of 3 | $2,798,873 | +13% |
| 04 FEB 2026 | CM626PM2126039 | Fredericksburg | 2026 plant mix - secondary | 1 of 5 | $1,595,763 | Low, 1.0% under the second |
| 04 FEB 2026 | CM726PME127461 | Culpeper | 2026 plant mix - secondary | 3 of 4 | $3,609,122 | +2.0% |
| 04 FEB 2026 | CM726PMH127455 | Culpeper | 2026 plant mix - primary | 2 of 4 | $4,029,732 | +2.0% |
| 04 FEB 2026 | C0000128013N01 | Northern Virginia | 2026 plant mix - primary | 5 of 5 | $4,014,415 | +17% |
| 04 FEB 2026 | C0000128019P01 | Northern Virginia | 2026 plant mix - secondary | 5 of 5 | $2,829,622 | +15% |
| 14 JAN 2026 | CM626PMB127626 | Fredericksburg | 2026 plant mix - primary | 3 of 4 | $5,126,649 | +7.0% |
| 14 JAN 2026 | CM726PMD127450 | Culpeper | 2026 plant mix - interstate | 1 of 4 | $1,829,919 | Low, 1.0% under the second |
| 14 JAN 2026 | CM726PMA127452 | Culpeper | 2026 plant mix - primary/secondary | 1 of 3 | $3,492,529 | Low, 10% under the second |
| 14 JAN 2026 | CM726PMB127465 | Culpeper | 2026 plant mix - secondary | 2 of 3 | $2,690,674 | +8.0% |
| 14 JAN 2026 | C0000127750P01 | Northern Virginia | 2026 plant mix - secondary | 1 of 5 | $4,998,464 | Low, 2.0% under the second |
| 14 JAN 2026 | C0000128196P01 | Northern Virginia | 2026 plant mix - primary | 1 of 5 | $6,016,701 | Low, 0.0% under the second |
| 17 DEC 2025 | CM726PMM127453 | Culpeper | 2026 plant mix - primary | 2 of 3 | $3,155,511 | +8.0% |
| 17 DEC 2025 | CM726PMG127457 | Culpeper | 2026 plant mix - secondary | 3 of 3 | $2,345,283 | +8.0% |
| 17 DEC 2025 | CM726PMC127463 | Culpeper | 2026 plant mix - secondary | 2 of 3 | $3,380,035 | +5.0% |
| 17 DEC 2025 | C0000125882N01 | Fredericksburg | Trench widening | 3 of 6 | $881,864 | +37% |
| 19 NOV 2025 | CM726PMF127459 | Culpeper | 2026 plant mix - primary | 3 of 3 | $6,261,450 | +16% |
| 19 NOV 2025 | C0000128015P01 | Northern Virginia | 2026 plant mix - secondary | 4 of 6 | $4,206,980 | +23% |
| 19 NOV 2025 | C0000127753P01 | Northern Virginia | 2026 plant mix - secondary | 5 of 6 | $3,718,665 | +8.0% |
| 28 JUL 2021 | CM621PMG118934 | Fredericksburg | 2021 plant mix | 3 of 3 | $2,618,027 | +24% |
| 23 JUN 2021 | CM721PMF118518 | Staunton | 2021 plant mix | 1 of 3 | $1,291,837 | Low, 5.0% under the second |
| 28 APR 2021 | C0000116965N01 | Staunton | Sgr - 2021 plant mix | 2 of 3 | $406,199 | +5.0% |
| 24 MAR 2021 | C0000117820N01 | Northern Virginia | 2021 plant mix | 1 of 3 | $3,976,174 | Low, 3.0% under the second |
| 24 MAR 2021 | CM721PMD116991 | Culpeper | Sgr* - 2021 plant mix | 2 of 2 | $2,883,486 | +13% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.