General Excavation, Inc.: VDOT bid record
General Excavation, Inc. submitted 153 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 22 JUL 2026, and was the low bidder on 72 of them (47%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $175,418,928
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 13 | 5 | 38% |
| 2003 | 18 | 9 | 50% |
| 2004 | 8 | 4 | 50% |
| 2005 | 9 | 4 | 44% |
| 2006 | 10 | 8 | 80% |
| 2007 | 14 | 4 | 29% |
| 2008 | 10 | 3 | 30% |
| 2009 | 8 | 1 | 13% |
| 2010 | 13 | 5 | 38% |
| 2011 | 13 | 6 | 46% |
| 2012 | 7 | 7 | 100% |
| 2013 | 8 | 2 | 25% |
| 2014 | 5 | 4 | 80% |
| 2015 | 3 | 2 | 67% |
| 2016 | 3 | 2 | 67% |
| 2017 | 1 | 1 | 100% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 2 | 100% |
| 2021 | 1 | 0 | 0% |
| 2025 | 1 | 1 | 100% |
| 2026 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 81 | 40 | 49% |
| Culpeper | 36 | 18 | 50% |
| Northern Virginia | 24 | 10 | 42% |
| Fredericksburg | 12 | 4 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 161 | 79 (49%) | $2,397.59 | $2,000.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 123 | 36 (29%) | $1.00 | $1.00 |
| Flagger service | 512SD20-0027 | HR | 113 | 36 (32%) | $18.60 | $20.00 |
| Overseeding | 603SD20-0004 | LB | 98 | 34 (35%) | $4.67 | $5.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 95 | 34 (36%) | $2.50 | $3.00 |
| Lime | 603SD20-0017 | TON | 108 | 33 (31%) | $189.55 | $200.00 |
| Alt.breakaway cable term. GR-9 | 505SD20-0038 | EACH | 60 | 32 (53%) | $2,318.00 | $2,425.00 |
| Guardrail GR-2 | 505SD20-0030 | LF | 58 | 32 (55%) | $16.80 | $18.00 |
| Asphalt concrete BM-25.0 | 315SD20-0010 | TON | 56 | 28 (50%) | $74.44 | $124.00 |
| Underdrain UD-4 | 501SD20-0004 | LF | 52 | 28 (54%) | $8.54 | $12.46 |
| Sign panel | 701SD20-0001 | SF | 57 | 27 (47%) | $27.30 | $34.00 |
| Regular seed | 603SD20-0003 | LB | 110 | 24 (22%) | $15.00 | $13.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| DLB, Inc. | 18 | 9 of 18 |
| J. L. Kent & Sons, Inc. | 10 | 7 of 10 |
| Perry Engineering Company, Incorporated | 10 | 3 of 10 |
| Fielder'S Choice Enterprises, Inc. | 10 | 2 of 10 |
| W-L Construction & Paving, Inc. | 9 | 3 of 9 |
| Chemung Contracting Corporation | 9 | 2 of 9 |
| Tavares Concrete Co., Inc. | 9 | 5 of 9 |
| Fort Myer Construction Corporation | 9 | 5 of 9 |
| Sagres Construction Corporation | 7 | 2 of 7 |
| F. Clayton Plecker & Sons, Inc. | 7 | 2 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000120748C01 | Culpeper | Smart scale - roundabout and r-cut intersection | 1 of 4 | $10,953,491 | Low, 17% under the second |
| 27 MAY 2026 | C0000115716M01 | Staunton | Smart scale - park and ride lot improvements | 3 of 6 | $1,895,845 | +15% |
| 22 APR 2026 | C0000101435C01 | Staunton | Route relocation | 1 of 5 | $2,889,243 | Low, 38% under the second |
| 25 MAR 2026 | C0000119663N01 | Staunton | Smart scale - road safety improvements | 4 of 5 | $1,203,850 | +62% |
| 25 FEB 2026 | C0000125982C01 | Culpeper | Roadway safety improvements | 3 of 4 | $1,433,306 | +11% |
| 19 NOV 2025 | C0000115129N01 | Staunton | Smart scale - ramp widenings | 1 of 2 | $955,731 | Low, 38% under the second |
| 24 FEB 2021 | C0000017714M01 | Staunton | Smart scale - roadway reconstruction | 2 of 3 | $2,094,000 | +21% |
| 25 MAR 2020 | C0000018003C01 | Staunton | Smart scale - roadway widening | 1 of 2 | $18,176,340 | Low, 8.0% under the second |
| 26 FEB 2020 | C000116236N01 | Staunton | Interstate ramp improvements | 1 of 2 | $2,153,924 | Low, 39% under the second |
| 24 APR 2019 | C0000109272C01 | Northern Virginia | Evergreen mills rd int. improvements at relocated rte 771 | 3 of 3 | $1,868,900 | +21% |
| 21 JUN 2017 | C00109380C01 | Culpeper | Rte. 15/17/29-median closure-open median direct closure | 1 of 2 | $1,778,948 | Low, 0.0% under the second |
| 21 DEC 2016 | C0000094847C01 | Staunton | 0.69 mi. grade, drain, asph. pave, utilities & signal | 1 of 2 | $2,314,174 | Low, 1.0% under the second |
| 21 DEC 2016 | C000100549C01 | Culpeper | Intersection, bicycle, and pedestrian improvements | 1 of 3 | $653,880 | Low, 10% under the second |
| 25 MAY 2016 | C0000104805M01 | Staunton | Route 29 and route 718 intersection improvements | 2 of 3 | $998,060 | +15% |
| 28 OCT 2015 | 0000067769C01 | Staunton | 2.25 mi. 2 lane on 4 lane rw grade,drain,pave & incidentals | 1 of 3 | $9,702,425 | Low, 17% under the second |
| 26 AUG 2015 | 0000016640C01 | Staunton | 0.791 mi. grade, drain, asph. pave, signals, utilities | 2 of 3 | $7,238,087 | +9.0% |
| 28 JAN 2015 | C00075881C01 | Staunton | 1.059 mi. grade, drain, asph. pave., 2 box culvert, planting | 1 of 3 | $24,966,910 | Low, 10% under the second |
| 17 DEC 2014 | C00077385C01 | Staunton | Route 29/route 666 interchange | 2 of 3 | $19,021,740 | +2.0% |
| 23 JUL 2014 | C000102733C01 | Staunton | Const. new rec access rd. on fishnet prop in warren county | 1 of 3 | $382,406 | Low, 22% under the second |
| 27 JUN 2014 | C000103588M01 | Northern Virginia | Culvert replacement at portsmouth rd | 1 of 3 | $622,524 | Low, 14% under the second |
| 25 JUN 2014 | C00100448C01 | Fredericksburg | Expansion of commuter parking lot at gordon road | 1 of 3 | $3,325,544 | Low, 9.0% under the second |
| 26 FEB 2014 | C00090968M01B | Staunton | Bridge and approaches | 1 of 3 | $998,995 | Low, -8.0% under the second |
| 20 NOV 2013 | C00002620M01 | Staunton | 0.341 mi. grade, drain, asph. pave. | 3 of 3 | $1,180,833 | +26% |
| 20 NOV 2013 | C00079739M01 | Staunton | Stp-007-8(137)(nfo)0340-007-117, m501 | 3 of 3 | $853,176 | +10% |
| 23 OCT 2013 | C00078621C01 | Fredericksburg | 0.35 mi. grade, drain, asph. pave, utilities & conc. incid. | 2 of 3 | $1,841,868 | +28% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.