W-L Construction & Paving, Inc.: VDOT bid record

W-L Construction & Paving, Inc. submitted 623 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 22 JUL 2026, and was the low bidder on 399 of them (64%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
Virginia DOT
Low bid volume
$802,170,213
Latest bid
22 JUL 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

623Bids
399Low bids
64Win rate, percent
+8.0%Median gap to the low bid when not low, 224 bids

By year

YearBidsLow bidsWin rate
200214964%
2003291655%
2004291448%
2005221464%
2006171059%
2007392051%
2008604067%
2009433172%
2010372876%
2011442966%
2012392872%
2013292379%
201421943%
2015231461%
2016281761%
2017181372%
2018201575%
2019201470%
2020271556%
2021372773%
202510220%
2026171165%
W-L Construction & Paving, Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Bristol42129971%
Staunton1276249%
Salem392051%
Lynchburg231357%
Culpeper11436%
Richmond2150%
W-L Construction & Paving, Inc., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Agr. base mat. TY.I or II no. 21A or 21B305SP20-0003TON152100 (66%)$26.60$33.78
Type A PVMT line MRKG 4"704SD20-0001LF12689 (71%)$0.22$0.24
Type B class I PVMT line MRKG 24"704SD20-0010LF13082 (63%)$12.00$7.50
Siltation control excavation303SD20-0029CY13174 (56%)$1.03$3.50
Group 2 channelizing devices512SD20-0024DAY16672 (43%)$1.00$1.00
Flagger service512SD20-0027HR18168 (38%)$23.64$20.00
Lime603SD20-0017TON14265 (46%)$135.25$200.00
Flexible pave.planing 0"-2"515SD20-0013SY10664 (60%)$2.00$1.90
Temp. silt fence type A303SD20-0034LF13152 (40%)$3.00$3.00
Rumble strip cylindrical asphalt315SD20-0015LF7252 (72%)$0.36$0.51
Asphalt concrete BM-25.0315SD20-0010TON7052 (74%)$87.89$124.00
Overseeding603SD20-0004LB13049 (38%)$6.47$5.00
W-L Construction & Paving, Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Adams Construction Company7634 of 76
Elk Knob, Inc.5528 of 55
Rogers Group, Inc.5315 of 53
Glass Machinery and Excavation, Inc.3216 of 32
Stuart M. Perry, Incorporated2919 of 29
Bizzack Construction, LLC2910 of 29
Mac Const., Inc.2914 of 29
Kickin Asphalt Paving and Excavating, LLC2410 of 24
Superior Paving Corporation1913 of 19
Patrick Construction, Inc.189 of 18
W-L Construction & Paving, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 JUL 2026CM127PMF129009Bristol2027 plant mix - secondary2 of 2$4,589,635+7.0%
22 JUL 2026C0000119436C01BristolSmart scale - turn lane improvements4 of 4$2,942,062+10%
24 JUN 2026C0000115470C01BristolSmart scale - safety improvements / lane additions1 of 2$6,177,185Low, 4.0% under the second
27 MAY 2026C0000115716M01StauntonSmart scale - park and ride lot improvements6 of 6$2,086,493+26%
25 MAR 2026C0000122877C01BristolSafety improvements1 of 3$1,485,086Low, 13% under the second
25 MAR 2026C0000119663N01StauntonSmart scale - road safety improvements3 of 5$1,028,680+38%
25 MAR 2026C0000123843N01StauntonShoulder widening, rumble strips, guardrail1 of 3$3,958,648Low, 5.0% under the second
04 FEB 2026CM126PMD127275Bristol2026 plant mix - primary1 of 2$5,829,837Low, 9.0% under the second
04 FEB 2026CM126PMF127279Bristol2026 plant mix - primary1 of 2$5,844,751Low, 6.0% under the second
04 FEB 2026CM126PMG127281Bristol2026 plant mix - primary/secondary1 of 1$3,936,455Low
04 FEB 2026CM126PM1127845BristolSgr* - 2026 plant mix - norton city1 of 2$202,847Low, 5.0% under the second
04 FEB 2026CM826PMP127557Staunton2026 plant mix - interstate1 of 3$1,063,812Low, 7.0% under the second
14 JAN 2026CM126PML127287Bristol2026 plant mix - secondary2 of 2$2,849,006+1.0%
14 JAN 2026CM726PMD127450Culpeper2026 plant mix - interstate4 of 4$2,032,270+11%
14 JAN 2026CM826PME127547Staunton2026 plant mix - primary1 of 4$2,712,485Low, 8.0% under the second
14 JAN 2026CM126PMA127272Bristol2026 plant mix - interstate1 of 1$8,186,376Low
14 JAN 2026CM126PMB127273Bristol2026 plant mix - interstate1 of 1$8,042,409Low
17 DEC 2025CM126PMC127274Bristol2026 plant mix - secondary2 of 2$1,583,101+6.0%
17 DEC 2025CM126PME127276Bristol2026 plant mix - primary1 of 2$6,545,407Low, 3.0% under the second
17 DEC 2025CM126PMJ127285Bristol2026 plant mix - primary1 of 2$5,222,461Low, 4.0% under the second
17 DEC 2025CM126PMK127286Bristol2026 plant mix - secondary2 of 2$2,012,372+17%
17 DEC 2025CM826PMR127551Staunton2026 plant mix - primary3 of 4$3,728,019+7.0%
17 DEC 2025CM826PMI127550Staunton2026 plant mix - primary2 of 3$2,692,294+8.0%
17 DEC 2025C0000119429C01BristolSmart scale - roundabout2 of 4$2,988,456+1.0%
19 NOV 2025CM826PMJ127374Staunton2026 plant mix - secondary3 of 3$2,534,420+8.0%
W-L Construction & Paving, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way