Rogers Group, Inc.: VDOT bid record
Rogers Group, Inc. submitted 60 bids on Virginia DOT contracts in the data, from 28 AUG 2013 to 28 OCT 2026, and was the low bidder on 17 of them (28%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $100,624,257
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 1 | 0 | 0% |
| 2014 | 9 | 5 | 56% |
| 2015 | 13 | 3 | 23% |
| 2016 | 16 | 6 | 38% |
| 2017 | 9 | 1 | 11% |
| 2018 | 6 | 1 | 17% |
| 2019 | 5 | 1 | 20% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 59 | 17 | 29% |
| Staunton | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Flex. pave. tie-in planing 0"-2" | 515SD20-0011 | SY | 31 | 22 (71%) | $4.65 | $6.44 |
| Asph. conc. TY. SM-12.5A maint | 315SD20-0032 | TON | 30 | 16 (53%) | $73.20 | $69.00 |
| Type B class I PVMT line MRKG 24" | 704SD20-0010 | LF | 32 | 13 (41%) | $13.30 | $7.50 |
| Alt.breakaway cable term. GR-9 | 505SD20-0038 | EACH | 19 | 12 (63%) | $2,400.48 | $2,425.00 |
| Snow plow. raised pave. marker asph.conc | 54217 | EACH | 26 | 11 (42%) | $27.17 | $32.00 |
| Asph. conc. TY. SM-12.5E maint | 315SD20-0036 | TON | 22 | 11 (50%) | $79.29 | $88.72 |
| Type A PVMT line MRKG 4" | 704SD20-0001 | LF | 20 | 9 (45%) | $0.21 | $0.24 |
| Guardrail terminal GR-6 NCHRP 350 | 505SD20-0027 | LF | 15 | 9 (60%) | $100.00 | $74.00 |
| Type B class I pave. line marking 4" | 54032 | LF | 12 | 9 (75%) | $0.53 | $0.72 |
| Temp. PVMT MRKG TY. A, 4" | 512SD20-0046 | LF | 10 | 9 (90%) | $0.09 | $0.12 |
| Asph. conc. TY. SM-19.0A maint | 315SD20-0037 | TON | 38 | 8 (21%) | $72.93 | $88.12 |
| Flexible pave.planing 0"-2" | 515SD20-0013 | SY | 31 | 8 (26%) | $2.02 | $1.90 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| W-L Construction & Paving, Inc. | 53 | 38 of 53 |
| Cleco Corporation | 5 | 2 of 5 |
| Glass Machinery and Excavation, Inc. | 3 | 3 of 3 |
| RMD Holdings, LTD. | 2 | 0 of 2 |
| Estes Bros. Const., Inc. | 2 | 2 of 2 |
| Elk Knob, Inc. | 2 | 0 of 2 |
| King General Contractors, Inc. | 2 | 0 of 2 |
| S. L. Williamson Company, Incorporated | 1 | 1 of 1 |
| Lumin8 Transportation Technologies, LLC | 1 | 1 of 1 |
| Fenton Excavating & Construction, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000124205C01B | Staunton | Smart scale - off ramp improvements | 3 of 3 | $2,262,190 | +7.0% |
| 27 FEB 2019 | CM119PMC112948 | Bristol | 2019 plant mix | 1 of 2 | $6,078,614 | Low, 5.0% under the second |
| 27 FEB 2019 | CM119PMG112968 | Bristol | 2019 plant mix | 2 of 2 | $7,854,064 | +4.0% |
| 13 FEB 2019 | CM119PMD112951 | Bristol | 2019 plant mix | 2 of 2 | $6,969,542 | +1.0% |
| 23 JAN 2019 | CM119PME112954 | Bristol | 2019 plant mix | 2 of 2 | $6,550,027 | +7.0% |
| 09 JAN 2019 | CM119PMF112957 | Bristol | 2019 plant mix | 2 of 2 | $7,059,884 | +25% |
| 22 AUG 2018 | C000108747N01 | Bristol | Asphalt structual rehabilitation | 2 of 2 | $340,117 | +20% |
| 28 FEB 2018 | CM117PM110848 | Bristol | 2018 plant mix | 2 of 2 | $7,378,905 | +19% |
| 28 FEB 2018 | CM117PM110851 | Bristol | 2018 plant mix | 2 of 2 | $7,593,022 | +17% |
| 28 FEB 2018 | CM117PM110854 | Bristol | 2018 plant mix | 2 of 2 | $9,981,942 | +2.0% |
| 28 FEB 2018 | CM117PM110857 | Bristol | 2018 plant mix | 2 of 2 | $6,136,853 | +10% |
| 28 FEB 2018 | CM117PM110868 | Bristol | 2018 plant mix | 1 of 2 | $8,472,670 | Low, 1.0% under the second |
| 21 JUN 2017 | C000107066N501 | Bristol | Us 460 shoulder initiative | 2 of 2 | $1,943,658 | +1.0% |
| 24 MAY 2017 | C000108743N01 | Bristol | None9999-092-r97,n501 | 2 of 2 | $1,806,962 | +7.0% |
| 26 APR 2017 | C000108739N01 | Bristol | Structural rehab. of asphalt | 2 of 2 | $2,185,658 | +21% |
| 22 FEB 2017 | CM117PME108945 | Bristol | 2017 plant mix | 2 of 2 | $10,808,300 | +65% |
| 22 FEB 2017 | CM117PMF108816 | Bristol | 2017 plant mix | 2 of 2 | $5,957,855 | +68% |
| 22 FEB 2017 | CM117PMG108818 | Bristol | 2017 plant mix | 2 of 2 | $4,985,499 | +1.0% |
| 22 FEB 2017 | CM117PMM110085 | Bristol | 2017 plant mix | 2 of 2 | $531,900 | +7.0% |
| 25 JAN 2017 | CM116PMC108806 | Bristol | 2017 plant mix | 2 of 2 | $5,401,500 | +3.0% |
| 25 JAN 2017 | CM116PMD108811 | Bristol | 2017 plant mix | 1 of 2 | $4,717,000 | Low, 5.0% under the second |
| 28 SEP 2016 | C0000081573N01 | Bristol | Rte. 676-azure lane grade,drain,surface treat non-hard surf | 1 of 3 | $708,485 | Low, 3.0% under the second |
| 28 SEP 2016 | C000107240N01 | Bristol | Asphalt strengthening - plant mix 2016 | 2 of 2 | $819,431 | +3.0% |
| 24 AUG 2016 | C0000107120N01 | Bristol | Pave shoulder rumble strips and guardrail | 2 of 2 | $4,909,431 | +33% |
| 24 AUG 2016 | C00116PM109258 | Bristol | Sgr: plant mix | 1 of 2 | $2,560,857 | Low, 4.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.