King General Contractors, Inc.: VDOT bid record

King General Contractors, Inc. submitted 28 bids on Virginia DOT contracts in the data, from 23 SEP 2015 to 28 OCT 2026, and was the low bidder on 6 of them (21%). When it was not low, its total sat a median +17% above the low bid.

Owner
Virginia DOT
Low bid volume
$5,466,794
Latest bid
28 OCT 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

28Bids
6Low bids
21Win rate, percent
+17%Median gap to the low bid when not low, 22 bids

By year

YearBidsLow bidsWin rate
2015100%
20166117%
2017200%
2018100%
2019100%
20202150%
2025100%
202614429%
King General Contractors, Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Bristol22523%
Salem6117%
King General Contractors, Inc., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Siltation control excavation303SD20-0029CY187 (39%)$6.17$3.50
Flagger service512SD20-0027HR195 (26%)$32.00$20.00
Group 2 channelizing devices512SD20-0024DAY195 (26%)$1.37$1.00
Concrete class A3 misc.504SD20-0001CY75 (71%)$999.00$950.00
Temp. silt fence type A303SD20-0034LF224 (18%)$8.05$3.00
Sign panel701SD20-0001SF154 (27%)$65.00$34.00
Lime603SD20-0017TON144 (29%)$246.29$200.00
Conc. found. STP-1, TY. A700SD20-0038EACH124 (33%)$967.57$579.40
Temporary sign512SD20-0014SF213 (14%)$25.00$20.00
Aggr. base matl. TY. I no. 21B308SD20-0012TON173 (18%)$45.00$26.00
Check dam rock TY. II303SD20-0023EACH133 (23%)$350.00$250.00
Fertilizer potassium - K603SD20-0016LB113 (27%)$3.42$3.00
King General Contractors, Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

King General Contractors, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026C0000127207B70SalemBridge rehab1 of 4$459,704Low, 19% under the second
23 SEP 2026C0000128606B15BristolOn - call bridge repair2 of 5$2,062,679+5.0%
26 AUG 2026C0000124370N01BBristolBridge joint repair3 of 3$1,327,298+47%
26 AUG 2026C0000124095M01SalemSmart scale - road widening and improvements3 of 4$4,926,344+19%
26 AUG 2026C0000128603B82BristolBridge rehabilitation5 of 6$12,713,217+50%
22 JUL 2026C0000121138B52BristolSgr - bridge replacment over n.f. clinch river2 of 5$1,535,251+23%
24 JUN 2026C0000117111B62BristolSgr - bridge replacement1 of 3$1,627,637Low, 17% under the second
27 MAY 2026C0000119458C01SalemSmart scale - roundabout6 of 6$12,696,582+63%
27 MAY 2026C0000107309M01SalemRetaining wall and road safety improvements4 of 4$3,699,989+49%
22 APR 2026C0000117081B10BristolSgr - bridge rehabilitation2 of 5$665,984+22%
22 APR 2026C0000125211N01BristolClear zone improvements1 of 2$1,155,140Low, 21% under the second
25 MAR 2026C0000121244B67BristolBridge rehabilitation4 of 7$6,408,212+37%
25 FEB 2026C0000119431C01BBristolSmart scale - road realignment1 of 2$1,483,307Low, 15% under the second
04 FEB 2026C0000123319B54BristolSgr - bridge superstructure replacement3 of 8$3,083,009+12%
17 DEC 2025C0000119442C01BristolSmart scale - roundabout2 of 2$4,511,939+9.0%
26 AUG 2020C0000113875B01BristolSgr - bridge replacement over bluestone river1 of 3$354,741Low, 11% under the second
22 JUL 2020C0000113877B04BristolSgr - bridge replacement on pisgah rd. over fairground creek3 of 3$550,870+16%
23 JAN 2019C0000108145M01BristolAzure lane-grade, drain surface treat- phase ii2 of 3$734,044+1.0%
14 NOV 2018C0000109584N01SalemHsip-070-2(028)(nfo)0008-070-694, n5012 of 3$1,195,077+4.0%
20 DEC 2017C0000087905M01SalemSafety improvements - curve flattening & vertical alignment2 of 3$1,595,142+7.0%
26 APR 2017C0000104541B55BristolProp. superstructure replacement rte. 712 over millers creek2 of 3$217,375+15%
21 DEC 2016C000108106D45BristolStp-br01(332)(nfo)9999-961-412,d645, d6533 of 3$453,966+39%
16 NOV 2016C0000086594B45BristolBros-5404(120)(nfo)0687-084-658, b6451 of 3$386,265Low, 1.0% under the second
27 JUL 2016C000081334C501BristolRoad realignment along palmer ave. in saltville3 of 3$369,920+11%
22 JUN 2016C0000105466N01Bristol0.53 mi. grade, drain, asph. pave.3 of 3$288,154+25%
King General Contractors, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy