King General Contractors, Inc.: VDOT bid record
King General Contractors, Inc. submitted 28 bids on Virginia DOT contracts in the data, from 23 SEP 2015 to 28 OCT 2026, and was the low bidder on 6 of them (21%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $5,466,794
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2015 | 1 | 0 | 0% |
| 2016 | 6 | 1 | 17% |
| 2017 | 2 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2025 | 1 | 0 | 0% |
| 2026 | 14 | 4 | 29% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 22 | 5 | 23% |
| Salem | 6 | 1 | 17% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Siltation control excavation | 303SD20-0029 | CY | 18 | 7 (39%) | $6.17 | $3.50 |
| Flagger service | 512SD20-0027 | HR | 19 | 5 (26%) | $32.00 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 19 | 5 (26%) | $1.37 | $1.00 |
| Concrete class A3 misc. | 504SD20-0001 | CY | 7 | 5 (71%) | $999.00 | $950.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 22 | 4 (18%) | $8.05 | $3.00 |
| Sign panel | 701SD20-0001 | SF | 15 | 4 (27%) | $65.00 | $34.00 |
| Lime | 603SD20-0017 | TON | 14 | 4 (29%) | $246.29 | $200.00 |
| Conc. found. STP-1, TY. A | 700SD20-0038 | EACH | 12 | 4 (33%) | $967.57 | $579.40 |
| Temporary sign | 512SD20-0014 | SF | 21 | 3 (14%) | $25.00 | $20.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 17 | 3 (18%) | $45.00 | $26.00 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 13 | 3 (23%) | $350.00 | $250.00 |
| Fertilizer potassium - K | 603SD20-0016 | LB | 11 | 3 (27%) | $3.42 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Road & Bridge, Inc. | 11 | 5 of 11 |
| Glass Machinery and Excavation, Inc. | 6 | 2 of 6 |
| Patrick Construction, Inc. | 5 | 2 of 5 |
| Elk Knob, Inc. | 5 | 2 of 5 |
| Crossroads Bridge Inc | 5 | 2 of 5 |
| Ken Construction Co., Inc. | 5 | 2 of 5 |
| Cleco Corporation | 5 | 5 of 5 |
| Freyssinet, Inc. | 3 | 3 of 3 |
| Caton Construction Group, Inc. | 3 | 1 of 3 |
| Lanford Brothers Company, Incorporated | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000127207B70 | Salem | Bridge rehab | 1 of 4 | $459,704 | Low, 19% under the second |
| 23 SEP 2026 | C0000128606B15 | Bristol | On - call bridge repair | 2 of 5 | $2,062,679 | +5.0% |
| 26 AUG 2026 | C0000124370N01B | Bristol | Bridge joint repair | 3 of 3 | $1,327,298 | +47% |
| 26 AUG 2026 | C0000124095M01 | Salem | Smart scale - road widening and improvements | 3 of 4 | $4,926,344 | +19% |
| 26 AUG 2026 | C0000128603B82 | Bristol | Bridge rehabilitation | 5 of 6 | $12,713,217 | +50% |
| 22 JUL 2026 | C0000121138B52 | Bristol | Sgr - bridge replacment over n.f. clinch river | 2 of 5 | $1,535,251 | +23% |
| 24 JUN 2026 | C0000117111B62 | Bristol | Sgr - bridge replacement | 1 of 3 | $1,627,637 | Low, 17% under the second |
| 27 MAY 2026 | C0000119458C01 | Salem | Smart scale - roundabout | 6 of 6 | $12,696,582 | +63% |
| 27 MAY 2026 | C0000107309M01 | Salem | Retaining wall and road safety improvements | 4 of 4 | $3,699,989 | +49% |
| 22 APR 2026 | C0000117081B10 | Bristol | Sgr - bridge rehabilitation | 2 of 5 | $665,984 | +22% |
| 22 APR 2026 | C0000125211N01 | Bristol | Clear zone improvements | 1 of 2 | $1,155,140 | Low, 21% under the second |
| 25 MAR 2026 | C0000121244B67 | Bristol | Bridge rehabilitation | 4 of 7 | $6,408,212 | +37% |
| 25 FEB 2026 | C0000119431C01B | Bristol | Smart scale - road realignment | 1 of 2 | $1,483,307 | Low, 15% under the second |
| 04 FEB 2026 | C0000123319B54 | Bristol | Sgr - bridge superstructure replacement | 3 of 8 | $3,083,009 | +12% |
| 17 DEC 2025 | C0000119442C01 | Bristol | Smart scale - roundabout | 2 of 2 | $4,511,939 | +9.0% |
| 26 AUG 2020 | C0000113875B01 | Bristol | Sgr - bridge replacement over bluestone river | 1 of 3 | $354,741 | Low, 11% under the second |
| 22 JUL 2020 | C0000113877B04 | Bristol | Sgr - bridge replacement on pisgah rd. over fairground creek | 3 of 3 | $550,870 | +16% |
| 23 JAN 2019 | C0000108145M01 | Bristol | Azure lane-grade, drain surface treat- phase ii | 2 of 3 | $734,044 | +1.0% |
| 14 NOV 2018 | C0000109584N01 | Salem | Hsip-070-2(028)(nfo)0008-070-694, n501 | 2 of 3 | $1,195,077 | +4.0% |
| 20 DEC 2017 | C0000087905M01 | Salem | Safety improvements - curve flattening & vertical alignment | 2 of 3 | $1,595,142 | +7.0% |
| 26 APR 2017 | C0000104541B55 | Bristol | Prop. superstructure replacement rte. 712 over millers creek | 2 of 3 | $217,375 | +15% |
| 21 DEC 2016 | C000108106D45 | Bristol | Stp-br01(332)(nfo)9999-961-412,d645, d653 | 3 of 3 | $453,966 | +39% |
| 16 NOV 2016 | C0000086594B45 | Bristol | Bros-5404(120)(nfo)0687-084-658, b645 | 1 of 3 | $386,265 | Low, 1.0% under the second |
| 27 JUL 2016 | C000081334C501 | Bristol | Road realignment along palmer ave. in saltville | 3 of 3 | $369,920 | +11% |
| 22 JUN 2016 | C0000105466N01 | Bristol | 0.53 mi. grade, drain, asph. pave. | 3 of 3 | $288,154 | +25% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.