On - call bridge repair. Let by Virginia DOT on September 23, 2026, Bristol. 5 bids received; low bid $1,966,750 by M. D. Miller Co., Inc..

Owner
Virginia DOT
Letting
23 SEP 2026
Pay items
76
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1M. D. Miller Co., Inc.$1,966,750Low
2King General Contractors, Inc.$2,062,679+5.0%
3Elk Knob, Inc.$2,363,025+20%
4Lanford Brothers Company, Incorporated$3,608,800+83%
5Southern Road & Bridge, LLC$4,179,350+113%
VDOT contract C0000128606B15: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. M. D. Miller Co., Inc.2. King General Contractors, Inc.3. Elk Knob, Inc.4. Lanford Brothers Company, Incorporated5. Southern Road & Bridge, LLC
0001-0010Asph. conc. TY. SM-12.5A maint (315SD20-0032)TON75$450.00$933.57$800.00$1,200.00$1,150.00
0001-0020Porous backfill (401SD20-0003)CY25$350.00$119.95$85.00$600.00$350.00
0001-0030Structure excavation maint. (401SD20-0009)CY20$300.00$68.54$75.00$375.00$485.00
0001-0040Bridge deck grooving maint. (404SD20-0020)SY1,000$25.00$7.20$35.00$14.00$8.00
0001-0050CR reinf. steel CL. I SPR. struct. maint. (406SD20-0011)LB250$12.00$10.49$10.00$14.00$6.00
0001-0060CR reinf. steel CL. III SPR. struct. maint. (406SD20-0013)LB250$12.00$12.00$20.00$14.00$6.00
0001-0070Anchor bolt replacement (412SD20-0010)EACH10$1,500.00$1,388.63$1,250.00$1,000.00$4,500.00
0001-0080Replace high strength grout (412SD20-0011)LF10$150.00$98.70$200.00$250.00$725.00
0001-0090Embedded galvanic anodes (412SD20-0017)EACH250$25.00$45.03$50.00$55.00$125.00
0001-0100H.E.S. patching type B (412SD20-0034)SY75$1,200.00$1,005.62$1,200.00$2,000.00$3,200.00
0001-0110H.E.S. patching type C (412SD20-0036)SY50$1,500.00$1,348.34$1,750.00$3,500.00$3,950.00
0001-0120Deck slab closure (412SD20-0037)SY100$2,000.00$2,023.90$2,000.00$3,500.00$3,850.00
0001-0130Expansion joint removal (412SD20-0039)LF25$500.00$102.82$175.00$85.00$85.00
0001-0140Expansion joint reconstruction hes (412SD20-0042)LF25$500.00$514.08$625.00$950.00$2,250.00
0001-0150Expansion joint preparation (412SD20-0043)LF25$500.00$109.67$75.00$65.00$225.00
0001-0160Back wall reconstruction hes (412SD20-0046)LF25$250.00$411.26$450.00$1,200.00$3,250.00
0001-0170Beam end repair (412SD20-0047)EACH1$2,500.00$13,709$3,750.00$6,500.00$6,850.00
0001-0180Jacking and blocking beam (412SD20-0048)EACH5$7,500.00$10,282$7,500.00$7,500.00$18,500
0001-0190Conc. superstr. surface repair (412SD20-0049)SY30$1,600.00$2,022.05$2,150.00$4,000.00$1,685.00
0001-0200Replace concrete curb (412SD20-0050)LF5$150.00$212.49$250.00$600.00$485.00
0001-0210Replace concrete rails type A (412SD20-0051)LF5$1,000.00$644.31$900.00$600.00$3,000.00
0001-0220Replace concrete rails type B (412SD20-0052)LF5$1,000.00$753.98$1,000.00$700.00$3,000.00
0001-0230Replace concrete post (412SD20-0053)EACH2$1,500.00$1,409.06$1,500.00$4,000.00$4,500.00
0001-0240Concrete substruct. surface repair (412SD20-0061)SY150$1,200.00$932.20$1,825.00$5,000.00$3,850.00
0001-0250Clean and reseal expansion joint (412SX20-0006)LF100$100.00$18.51$85.00$80.00$185.00
0001-0260Waterproofing – epoxy resin type EP-3B/EP-3T (416SD20-0003)SY500$70.00$104.46$72.00$200.00$95.00
0001-0270Adhesive based JT. sealer CL. I, 2-1/2" maint. (420SD20-0021)LF100$150.00$127.49$150.00$250.00$225.00
0001-0280Adhesive based JT. sealer CL. I, 3" maint. (420SD20-0022)LF100$150.00$159.02$175.00$255.00$295.00
0001-0290Adhesive based JT. sealer CL. III, 1/2" maint. (420SD20-0027)LF100$95.00$52.09$75.00$265.00$205.00
0001-0300Adhesive based JT. sealer CL. III, 1" maint. (420SD20-0028)LF100$95.00$52.09$95.00$255.00$295.00
0001-0310Adhesive based JT. sealer CL. III, 2" maint. (420SD20-0029)LF150$95.00$75.40$110.00$275.00$395.00
0001-0320Elastomeric expans. dam 0" to 2" SPRSTR maint (421SD20-0006)LF50$500.00$651.17$650.00$1,000.00$900.00
0001-0330Elastomeric expans. dam 3+" to 4" SPRSTR maint (421SD20-0008)LF50$700.00$685.44$700.00$1,000.00$1,500.00
0001-0340Elastomeric expans. dam 4+" to 5" SPRSTR maint (421SD20-0009)LF50$700.00$692.29$750.00$1,200.00$2,450.00
0001-0350Type A milling 1-1/2" (425SD20-0004)SY1,000$50.00$14.05$46.00$80.00$115.00
0001-0360PLC.high early mod.conc.overlay (425SD20-0014)SY1,000$150.00$239.90$95.00$180.00$225.00
0001-0370Type A hydro-demolition 1/2" (425SD20-0022)SY1,000$150.00$185.07$175.00$175.00$180.00
0001-0380NS furn. high early latex mod.conc. 1 1/4"- 1 3/4" (425SX20-0003)CY100$2,100.00$1,507.97$1,875.00$2,500.00$2,250.00
0001-0390Replace bearing (426SD20-0001)EACH2$6,500.00$4,386.82$7,500.00$8,500.00$9,850.00
0001-0400Reset exist. rocker expn. bearing (426SD20-0002)EACH2$5,000.00$3,084.48$5,000.00$2,500.00$8,500.00
0001-0410Modify exist. rocker expansion bearing (426SD20-0003)EACH2$6,000.00$3,564.29$3,500.00$2,000.00$8,500.00
0001-0420Modify exist. fixed bearing (426SD20-0004)EACH5$5,000.00$3,907.01$3,500.00$2,500.00$6,250.00
0001-0430Silicone joint sealant 1" (427SD20-0001)LF75$100.00$72.78$65.00$180.00$145.00
0001-0440Silicone joint sealant 1- 1/2" (427SD20-0002)LF75$100.00$86.49$75.00$200.00$185.00
0001-0450Epoxy overlay maint (431SD20-0002)SY1,000$75.00$82.25$85.00$145.00$155.00
0001-0460Traffic barrier service MB-11A (512SD20-0003)LF100$100.00$63.75$40.00$140.00$205.00
0001-0470Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007)EACH1$8,500.00$34,909$20,000$20,000$17,500
0001-0480Impact atten.ser. TY. I TL-2, <40 MPH (512SD20-0008)EACH1$8,500.00$26,684$16,000$16,000$17,500
0001-0490Type 3 barricade 8' (512SD20-0013)EACH2$500.00$685.44$400.00$1,500.00$450.00
0001-0500Temporary sign (512SD20-0014)SF750$25.00$41.13$40.00$45.00$35.00
0001-0510Truck mounted attenuator (512SD20-0023)HR200$200.00$47.98$50.00$22.00$200.00
0001-0520Group 2 channelizing devices (512SD20-0024)DAY250$75.00$1.37$10.00$15.00$5.00
0001-0530Port.changeable mess. sign (512SD20-0025)HR50$25.00$27.42$30.00$14.00$45.00
0001-0540Electronic arrow board (512SD20-0026)HR100$200.00$13.71$30.00$18.00$55.00
0001-0550Flagger service (512SD20-0027)HR500$100.00$68.54$40.00$65.00$90.00
0001-0560Eradicate linear PVMT MRKG (512SD20-0042)LF100$10.00$13.71$15.00$30.00$15.00
0001-0570Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061)LF50$20.00$27.42$24.00$50.00$55.00
0001-0580Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062)LF50$20.00$27.42$24.00$50.00$55.00
0001-0590Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063)LF50$20.00$27.42$24.00$50.00$55.00
0001-0600Temp. PVMT MRKG TY. D, CL. III, 12" (512SD20-0064)LF50$20.00$27.42$20.00$50.00$55.00
0001-0610Temp. PVMT MRKG TY. D, CL. III, 24" (512SD20-0065)LF25$20.00$27.42$30.00$50.00$55.00
0001-0620Portable temporary rumble strip array (512SP20-0001)DAY10$2,000.00$514.08$750.00$3,000.00$185.00
0001-0630NS mobilization on-call task order greater than $250,000 (abingdon) (513SX20-0001)EACH1$0.01$11,000$52,000$30,000$45,000
0001-0640NS mobilization on-call task order greater than $250,000 (lebanon) (513SX20-0001)EACH1$0.01$11,000$52,000$30,000$45,000
0001-0650NS mobilization on-call task order greater than $250,000 (wise) (513SX20-0001)EACH1$0.01$19,843$52,000$30,000$45,000
0001-0660NS mobilization on-call task order greater than $250,000 (wytheville) (513SX20-0001)EACH1$0.01$20,563$52,000$25,000$45,000
0001-0670NS mobilization on-call task order less than $250,000 (abingdon) (513SX20-0001)EACH1$0.01$11,000$34,000$20,000$24,000
0001-0680NS mobilization on-call task order less than $250,000 (lebanon) (513SX20-0001)EACH1$0.01$11,000$34,000$20,000$24,000
0001-0690NS mobilization on-call task order less than $250,000 (wise) (513SX20-0001)EACH1$0.01$19,843$34,000$20,000$24,000
0001-0700NS mobilization on-call task order less than $250,000 (wytheville) (513SX20-0001)EACH1$0.01$20,563$34,000$15,000$24,000
0001-0710Emergency mobilization (513SX20-0002)EACH1$5,000.00$15,080$40,000$40,000$100,000
0001-0720Flexible pave.planing 0"-2" (515SD20-0004)SY750$50.00$61.35$42.50$45.00$85.00
0001-0730Type A PVMT line MRKG 4" (704SD20-0001)LF200$20.00$27.42$30.00$48.00$200.00
0001-0740Type A PVMT line MRKG 6" (704SD20-0002)LF200$20.00$27.42$30.00$48.00$200.00
0001-0750Type B class VI PVMT line MRKG 4" (704SD20-0026)LF200$20.00$27.42$30.00$48.00$130.00
0001-0760Type B class VI PVMT line MRKG 6" (704SD20-0027)LF200$20.00$27.42$30.00$48.00$130.00
VDOT contract C0000128606B15: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of September 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy