Lanford Brothers Company, Incorporated: VDOT bid record
Lanford Brothers Company, Incorporated submitted 371 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 23 SEP 2026, and was the low bidder on 164 of them (44%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $188,991,038
- Latest bid
- 23 SEP 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 24 | 9 | 38% |
| 2003 | 23 | 13 | 57% |
| 2004 | 21 | 10 | 48% |
| 2005 | 40 | 18 | 45% |
| 2006 | 38 | 22 | 58% |
| 2007 | 33 | 17 | 52% |
| 2008 | 34 | 14 | 41% |
| 2009 | 30 | 18 | 60% |
| 2010 | 28 | 8 | 29% |
| 2011 | 20 | 6 | 30% |
| 2012 | 7 | 4 | 57% |
| 2013 | 15 | 6 | 40% |
| 2014 | 9 | 3 | 33% |
| 2015 | 2 | 0 | 0% |
| 2016 | 14 | 4 | 29% |
| 2017 | 2 | 1 | 50% |
| 2018 | 8 | 5 | 63% |
| 2019 | 3 | 1 | 33% |
| 2020 | 8 | 2 | 25% |
| 2021 | 6 | 2 | 33% |
| 2025 | 1 | 0 | 0% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 117 | 76 | 65% |
| Bristol | 62 | 15 | 24% |
| Culpeper | 45 | 19 | 42% |
| Lynchburg | 38 | 12 | 32% |
| Richmond | 30 | 10 | 33% |
| Hampton Roads | 30 | 11 | 37% |
| Fredericksburg | 21 | 9 | 43% |
| Staunton | 20 | 11 | 55% |
| Northern Virginia | 8 | 1 | 13% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS BR.superstr. wid./repair replace bearing | 412SX20-0009 | EACH | 369 | 177 (48%) | $1,010.00 | $1,500.00 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 256 | 133 (52%) | $62.00 | $99.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 135 | 101 (75%) | $8.00 | $20.00 |
| NS BR.superstr. wid./repair deck slab closure | 412SX20-0015 | SY | 221 | 90 (41%) | $160.00 | $125.00 |
| Bridge deck grooving maint. | 404SD20-0020 | SY | 148 | 82 (55%) | $6.00 | $8.00 |
| Flex pavement planing above 4" | 515SD20-0006 | SY | 109 | 80 (73%) | $6.00 | $7.50 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 187 | 79 (42%) | $1.00 | $1.00 |
| Patching type C | 412SD20-0035 | SY | 107 | 66 (62%) | $350.00 | $425.00 |
| Guardrail GR-2 | 505SD20-0030 | LF | 125 | 65 (52%) | $17.50 | $18.00 |
| Concrete substruct. surface repair | 412SD20-0061 | SY | 136 | 59 (43%) | $1,000.00 | $1,000.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 128 | 57 (45%) | $10.00 | $8.00 |
| Flagger service | 512SD20-0027 | HR | 136 | 54 (40%) | $18.75 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cleco Corporation | 129 | 25 of 129 |
| Burleigh Construction Co., Inc. | 62 | 25 of 62 |
| Elk Knob, Inc. | 49 | 31 of 49 |
| M. D. Miller Co., Inc. | 42 | 23 of 42 |
| Corman Construction, Inc. | 39 | 15 of 39 |
| McClain & Co., Inc. | 28 | 18 of 28 |
| Crossroads Bridge Inc | 16 | 8 of 16 |
| Makco, Incorporated | 16 | 14 of 16 |
| Ken Construction Co., Inc. | 13 | 8 of 13 |
| Richardson-Wayland Electrical Co. LLC | 13 | 8 of 13 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | C0000128606B15 | Bristol | On - call bridge repair | 4 of 5 | $3,608,800 | +83% |
| 26 AUG 2026 | C0000128603B82 | Bristol | Bridge rehabilitation | 4 of 6 | $11,844,370 | +40% |
| 24 JUN 2026 | C0000128696N01 | Staunton | On-call bridge repair and preventative maintenance | 1 of 3 | $10,115,777 | Low, 7.0% under the second |
| 25 MAR 2026 | C0000121244B67 | Bristol | Bridge rehabilitation | 3 of 7 | $6,325,675 | +35% |
| 25 FEB 2026 | C0000120996B89 | Salem | Bridge rehabilitation | 3 of 5 | $1,734,424 | +20% |
| 19 NOV 2025 | C0000124819B65 | Bristol | Bridge rehabilitation over st. lukes rd. | 3 of 3 | $5,237,182 | +42% |
| 17 NOV 2021 | C0000119505N01 | Hampton Roads | On-call structural repairs (williamsburg / franklin) | 1 of 3 | $1,685,293 | Low, 28% under the second |
| 27 OCT 2021 | C0000118978N01 | Northern Virginia | On-call bridge maintenance | 2 of 3 | $2,742,733 | +15% |
| 22 SEP 2021 | C0000118463B20 | Bristol | On-call bridge repair | 3 of 3 | $3,154,260 | +27% |
| 28 APR 2021 | C0000115174B39 | Bristol | Bridge rehabilitation for multiple structures at exit 64 | 1 of 3 | $7,294,778 | Low, 45% under the second |
| 24 FEB 2021 | C0000115007B02 | Salem | Sgr - bridge rehabilitation | 2 of 3 | $2,216,550 | +16% |
| 24 FEB 2021 | C0000116667B19 | Culpeper | Bridge deck latex overlay | 2 of 3 | $963,430 | +1.0% |
| 16 DEC 2020 | C0000116666N01 | Culpeper | Epoxy concrete overlay replacement | 2 of 3 | $794,767 | +10% |
| 21 OCT 2020 | C0000111688B69 | Northern Virginia | Sgr bridge rehabilitation | 3 of 3 | $1,108,171 | +9.0% |
| 23 SEP 2020 | C0000114676B17 | Richmond | Bridge substructure repairs | 3 of 3 | $1,569,607 | +17% |
| 22 JUL 2020 | C0000115033B13 | Culpeper | Latex bridge deck overlay | 1 of 3 | $729,920 | Low, 12% under the second |
| 22 JUL 2020 | C0000116333N01 | Culpeper | On-call bridge repairs and maintenance | 1 of 3 | $4,286,196 | Low, 39% under the second |
| 24 JUN 2020 | C0000114954N01 | Hampton Roads | On-call bridge repair | 2 of 3 | $4,203,750 | +80% |
| 24 JUN 2020 | C000115176B12 | Bristol | On-call interstate bridge repair | 3 of 3 | $2,406,186 | +26% |
| 22 APR 2020 | C0000111298B10 | Richmond | Sgr - bridge rehab over rte. 460 | 2 of 3 | $3,604,010 | +13% |
| 13 NOV 2019 | C0000113639B20 | Richmond | Mill, hydro demo & overlay bridges | 3 of 3 | $2,127,708 | +8.0% |
| 21 AUG 2019 | C0000115014B01 | Staunton | On-call bridge maintenance contract | 2 of 3 | $1,079,600 | +24% |
| 23 JAN 2019 | C0000114301B77 | Salem | Bridge deck overlay- over rte. 220 alt. | 1 of 2 | $2,004,816 | Low, 23% under the second |
| 19 DEC 2018 | C0000110578B79 | Bristol | Bridge rehabilitation over rte. 11 / 58 | 1 of 2 | $2,605,733 | Low, 27% under the second |
| 19 DEC 2018 | C0000110615B34 | Salem | Bridge deck overlay over new river | 1 of 3 | $2,259,496 | Low, 43% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.