Elk Knob, Inc.: VDOT bid record
Elk Knob, Inc. submitted 303 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 23 SEP 2026, and was the low bidder on 125 of them (41%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $72,163,678
- Latest bid
- 23 SEP 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 19 | 7 | 37% |
| 2003 | 30 | 7 | 23% |
| 2004 | 24 | 10 | 42% |
| 2005 | 27 | 9 | 33% |
| 2006 | 27 | 16 | 59% |
| 2007 | 28 | 18 | 64% |
| 2008 | 18 | 7 | 39% |
| 2009 | 10 | 3 | 30% |
| 2010 | 19 | 13 | 68% |
| 2011 | 19 | 7 | 37% |
| 2012 | 23 | 9 | 39% |
| 2013 | 14 | 4 | 29% |
| 2014 | 9 | 2 | 22% |
| 2015 | 10 | 4 | 40% |
| 2016 | 5 | 0 | 0% |
| 2017 | 4 | 3 | 75% |
| 2018 | 5 | 3 | 60% |
| 2019 | 4 | 1 | 25% |
| 2020 | 1 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 256 | 106 | 41% |
| Salem | 47 | 19 | 40% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temp. silt fence type A | 303SD20-0034 | LF | 193 | 111 (58%) | $3.00 | $3.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 212 | 97 (46%) | $1.00 | $1.00 |
| Flagger service | 512SD20-0027 | HR | 195 | 87 (45%) | $13.00 | $20.00 |
| Siltation control excavation | 303SD20-0029 | CY | 118 | 83 (70%) | $1.00 | $3.50 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 199 | 80 (40%) | $20.00 | $26.00 |
| Allaying dust | 511SD20-0001 | HR | 112 | 60 (54%) | $15.00 | $22.00 |
| Temp. filter barrier | 27506 | LF | 102 | 52 (51%) | $2.00 | $2.50 |
| Warning light TY. A | 512SD20-0028 | DAY | 103 | 51 (50%) | $1.00 | $1.00 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 95 | 50 (53%) | $30.00 | $54.00 |
| Regular seed | 603SD20-0003 | LB | 133 | 48 (36%) | $8.52 | $13.50 |
| Dewatering basin EC-8 | 303SD20-0028 | EACH | 93 | 47 (51%) | $500.00 | $1,000.00 |
| Lime | 603SD20-0017 | TON | 133 | 46 (35%) | $110.00 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ken Construction Co., Inc. | 66 | 25 of 66 |
| Cleco Corporation | 58 | 18 of 58 |
| W-L Construction & Paving, Inc. | 55 | 27 of 55 |
| Patrick Construction, Inc. | 50 | 23 of 50 |
| Lanford Brothers Company, Incorporated | 49 | 18 of 49 |
| Glass Machinery and Excavation, Inc. | 47 | 25 of 47 |
| Estes Bros. Const., Inc. | 43 | 28 of 43 |
| Crossroads Bridge Inc | 19 | 7 of 19 |
| Sowers Construction Co., Inc. | 18 | 5 of 18 |
| Fort Chiswell Construction Corporation | 17 | 2 of 17 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | C0000128606B15 | Bristol | On - call bridge repair | 3 of 5 | $2,363,025 | +20% |
| 22 JUL 2026 | C0000121138B52 | Bristol | Sgr - bridge replacment over n.f. clinch river | 1 of 5 | $1,248,910 | Low, 23% under the second |
| 22 APR 2026 | C0000117081B10 | Bristol | Sgr - bridge rehabilitation | 5 of 5 | $1,442,644 | +165% |
| 04 FEB 2026 | C0000123319B54 | Bristol | Sgr - bridge superstructure replacement | 5 of 8 | $3,240,823 | +17% |
| 22 SEP 2021 | C0000118463B20 | Bristol | On-call bridge repair | 2 of 3 | $2,762,200 | +11% |
| 28 APR 2021 | C0000115172B01 | Bristol | Bridge rehabilitation over rte 52 & i-81 | 2 of 3 | $1,634,784 | +14% |
| 24 FEB 2021 | C0000117348B63 | Bristol | Stp-br01 (366)0622-086-841, b663 | 1 of 3 | $1,241,518 | Low, 31% under the second |
| 18 NOV 2020 | C0000104902B65 | Bristol | Sgr - bridge replacement over reed creek | 2 of 3 | $1,244,926 | +22% |
| 18 DEC 2019 | C0000086601B61 | Bristol | Bridge replacement over powell river | 1 of 3 | $5,643,306 | Low, 11% under the second |
| 13 NOV 2019 | C0000110952B50 | Bristol | Superstructure replacement over hardy creek | 2 of 3 | $456,314 | +2.0% |
| 23 OCT 2019 | C0000110951B52 | Bristol | Bridge replacement over big wilson creek | 2 of 3 | $589,228 | +1.0% |
| 23 JAN 2019 | C0000086294B42 | Bristol | Superstructure replacement over indian creek | 2 of 3 | $625,981 | +26% |
| 28 MAR 2018 | C0000110922N01 | Bristol | District wide on-call bridge repair | 1 of 2 | $2,580,345 | Low, 11% under the second |
| 28 MAR 2018 | C000112055B11 | Bristol | District wide on call bridge repair (interstate) | 1 of 3 | $236,950 | Low, 24% under the second |
| 28 FEB 2018 | C0000110323N01 | Salem | Rural rustic road reconstruction and surface treatment | 1 of 3 | $312,145 | Low, 22% under the second |
| 24 JAN 2018 | C0000110363N01 | Salem | Resurface unpaved road | 2 of 3 | $475,486 | +5.0% |
| 24 JAN 2018 | C00086593B50 | Bristol | Bridge replacement rte. 744 over bluestone river | 3 of 3 | $315,578 | +21% |
| 20 DEC 2017 | C0000109436C01 | Bristol | Smart scale - add left turn lane along leatherwood lane | 1 of 3 | $307,576 | Low, 18% under the second |
| 20 DEC 2017 | C000102628C01 | Bristol | Replace bridge over coal creek with box culvert | 3 of 3 | $429,508 | +18% |
| 15 NOV 2017 | C0000108104D44 | Bristol | Wytheville residency culvert replacement | 1 of 3 | $249,319 | Low, 13% under the second |
| 25 JAN 2017 | C000105559B64 | Bristol | Superstr. repl. - rte. 58 over town branch at jonesville | 1 of 3 | $372,408 | Low, 33% under the second |
| 16 NOV 2016 | C000104458B49 | Bristol | Superstructure replacement on rte. 672 over martin creek | 2 of 3 | $261,553 | +6.0% |
| 25 MAY 2016 | C0000018665M01 | Bristol | Road alignment improvements along rte. 643 | 3 of 3 | $371,292 | +17% |
| 25 MAY 2016 | C000108107 | Bristol | Districtwide bridge maintenance and repair | 2 of 3 | $3,479,010 | +1.0% |
| 03 FEB 2016 | C0000103556B46 | Bristol | Bridge on rte. 23 (indian creek rd) over indian creek | 3 of 3 | $2,349,629 | +13% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.