Glass Machinery and Excavation, Inc.: VDOT bid record
Glass Machinery and Excavation, Inc. submitted 88 bids on Virginia DOT contracts in the data, from 24 SEP 2002 to 22 JUL 2026, and was the low bidder on 32 of them (36%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $17,239,002
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 5 | 3 | 60% |
| 2003 | 15 | 5 | 33% |
| 2004 | 15 | 6 | 40% |
| 2005 | 4 | 0 | 0% |
| 2006 | 5 | 3 | 60% |
| 2007 | 2 | 0 | 0% |
| 2009 | 3 | 1 | 33% |
| 2010 | 7 | 1 | 14% |
| 2011 | 5 | 3 | 60% |
| 2012 | 5 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 2 | 1 | 50% |
| 2015 | 3 | 2 | 67% |
| 2016 | 4 | 3 | 75% |
| 2017 | 2 | 0 | 0% |
| 2018 | 1 | 1 | 100% |
| 2019 | 2 | 1 | 50% |
| 2020 | 3 | 1 | 33% |
| 2026 | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Flagger service | 512SD20-0027 | HR | 78 | 44 (56%) | $11.50 | $20.00 |
| 18" pipe | 302SD20-0028 | LF | 52 | 36 (69%) | $22.00 | $37.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 75 | 34 (45%) | $3.00 | $3.00 |
| Aggr. matl. no. 1 | 308SD20-0001 | TON | 61 | 33 (54%) | $13.75 | $23.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 75 | 31 (41%) | $13.88 | $26.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 82 | 30 (37%) | $1.00 | $1.00 |
| CR. run aggr. no. 25 or 26 | 24260 | TON | 36 | 30 (83%) | $10.05 | $13.50 |
| Allaying dust | 511SD20-0001 | HR | 61 | 27 (44%) | $14.00 | $22.00 |
| 24" pipe | 302SD20-0037 | LF | 41 | 25 (61%) | $26.00 | $50.00 |
| Warning light TY. A | 512SD20-0028 | DAY | 43 | 24 (56%) | $0.50 | $1.00 |
| Siltation control excavation | 303SD20-0029 | CY | 79 | 22 (28%) | $2.00 | $3.50 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 52 | 22 (42%) | $225.00 | $250.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elk Knob, Inc. | 47 | 22 of 47 |
| W-L Construction & Paving, Inc. | 32 | 16 of 32 |
| Estes Bros. Const., Inc. | 32 | 17 of 32 |
| Patrick Construction, Inc. | 11 | 4 of 11 |
| King General Contractors, Inc. | 6 | 4 of 6 |
| Ken Construction Co., Inc. | 6 | 1 of 6 |
| C.L. Dale Construction Services, LLC | 5 | 4 of 5 |
| Cleco Corporation | 5 | 0 of 5 |
| Jones Road & Bridge, Inc. | 4 | 1 of 4 |
| J & J Contractors, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000121138B52 | Bristol | Sgr - bridge replacment over n.f. clinch river | 4 of 5 | $1,624,146 | +30% |
| 22 APR 2026 | C0000117081B10 | Bristol | Sgr - bridge rehabilitation | 1 of 5 | $543,959 | Low, 22% under the second |
| 22 APR 2026 | C0000125211N01 | Bristol | Clear zone improvements | 2 of 2 | $1,393,882 | +21% |
| 04 FEB 2026 | C0000123319B54 | Bristol | Sgr - bridge superstructure replacement | 6 of 8 | $3,795,993 | +37% |
| 16 DEC 2020 | C0000113878B08 | Bristol | Sgr - bridge superstructure replacement | 1 of 3 | $338,977 | Low, 3.0% under the second |
| 26 AUG 2020 | C0000113875B01 | Bristol | Sgr - bridge replacement over bluestone river | 2 of 3 | $393,630 | +11% |
| 24 JUN 2020 | C0000111272C01 | Bristol | Smart scale -truck climbing lane phase 2 | 2 of 3 | $4,646,294 | +113% |
| 13 NOV 2019 | C0000110952B50 | Bristol | Superstructure replacement over hardy creek | 1 of 3 | $446,353 | Low, 2.0% under the second |
| 24 JUL 2019 | C0000058273M01 | Bristol | Rural rustic road widening | 2 of 3 | $987,547 | +20% |
| 25 JUL 2018 | C0000000104189 | Bristol | Safety improvements via road re-alignment | 1 of 3 | $1,098,282 | Low, 36% under the second |
| 20 DEC 2017 | C000102628C01 | Bristol | Replace bridge over coal creek with box culvert | 2 of 3 | $409,513 | +12% |
| 23 AUG 2017 | C0000086726M01 | Bristol | Rte 649 - spot widen curves | 2 of 3 | $1,178,480 | +8.0% |
| 21 DEC 2016 | C000108106D45 | Bristol | Stp-br01(332)(nfo)9999-961-412,d645, d653 | 1 of 3 | $326,993 | Low, 38% under the second |
| 25 MAY 2016 | C0116SFT108403 | Bristol | Widen roadway and replace guardrail | 1 of 3 | $298,070 | Low, 22% under the second |
| 23 MAR 2016 | C0000101386C01 | Bristol | Bridge replacement on rte. 661 over long hollow branch | 1 of 3 | $593,309 | Low, 5.0% under the second |
| 24 FEB 2016 | C0000087907C01 | Bristol | Widen to 3 lanes | 2 of 3 | $5,657,151 | +11% |
| 26 AUG 2015 | C000056766 | Bristol | Rte. 613 - widening | 2 of 3 | $754,110 | +6.0% |
| 22 JUL 2015 | C00000293C03 | Bristol | Rte. 614 - reconstruction | 1 of 3 | $1,886,640 | Low, 2.0% under the second |
| 22 JUL 2015 | C00072203M01 | Bristol | Replace triple pipe with dbl. 8' x 6' precast box culvert | 1 of 3 | $487,227 | Low, 1.0% under the second |
| 19 NOV 2014 | C00104668C01 | Bristol | Improve align. & repl. bridge w/ 10'x6' dbl. box cul. | 1 of 3 | $1,176,823 | Low, 1.0% under the second |
| 26 MAR 2014 | C00104667N01 | Bristol | Add lane, rt. turn lane, pave shoulder & inst. rumble strip | 3 of 3 | $3,180,918 | +14% |
| 25 SEP 2013 | C00104052N01 | Bristol | None0726-095-013,n501 | 3 of 3 | $796,626 | +88% |
| 24 OCT 2012 | C00051566N01 | Bristol | 1.08 mi. grade, drain & asp. pave. | 2 of 3 | $365,278 | +6.0% |
| 27 JUN 2012 | C00098458N01 | Bristol | Widen shoulders and improve sight distance | 2 of 3 | $160,721 | +39% |
| 25 APR 2012 | C00096866N01 | Bristol | Install flashing beacons and construct two way turn lane | 3 of 3 | $457,210 | +11% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.