Patrick Construction, Inc.: VDOT bid record
Patrick Construction, Inc. submitted 123 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 04 FEB 2026, and was the low bidder on 48 of them (39%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $29,129,148
- Latest bid
- 04 FEB 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 22 | 12 | 55% |
| 2003 | 9 | 4 | 44% |
| 2004 | 3 | 3 | 100% |
| 2005 | 3 | 2 | 67% |
| 2006 | 12 | 3 | 25% |
| 2007 | 4 | 2 | 50% |
| 2008 | 5 | 1 | 20% |
| 2009 | 7 | 1 | 14% |
| 2010 | 4 | 0 | 0% |
| 2011 | 2 | 2 | 100% |
| 2012 | 2 | 0 | 0% |
| 2013 | 2 | 2 | 100% |
| 2014 | 4 | 2 | 50% |
| 2015 | 6 | 2 | 33% |
| 2016 | 10 | 2 | 20% |
| 2017 | 6 | 3 | 50% |
| 2018 | 7 | 2 | 29% |
| 2019 | 7 | 3 | 43% |
| 2020 | 3 | 1 | 33% |
| 2021 | 4 | 1 | 25% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 122 | 48 | 39% |
| Salem | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Siltation control excavation | 303SD20-0029 | CY | 94 | 77 (82%) | $1.00 | $3.50 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 99 | 69 (70%) | $17.00 | $26.00 |
| Flagger service | 512SD20-0027 | HR | 93 | 44 (47%) | $15.00 | $20.00 |
| Allaying dust | 511SD20-0001 | HR | 63 | 34 (54%) | $15.00 | $22.00 |
| 18" pipe | 302SD20-0028 | LF | 57 | 33 (58%) | $21.00 | $37.00 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 50 | 30 (60%) | $21.32 | $54.00 |
| Aggr. matl. no. 1 | 308SD20-0001 | TON | 60 | 27 (45%) | $17.75 | $23.00 |
| Alt.breakaway cable term. GR-9 | 505SD20-0038 | EACH | 57 | 24 (42%) | $2,500.00 | $2,425.00 |
| Guardrail GR-2 | 505SD20-0030 | LF | 53 | 21 (40%) | $17.00 | $18.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 97 | 20 (21%) | $1.00 | $1.00 |
| 24" pipe | 302SD20-0037 | LF | 35 | 20 (57%) | $27.00 | $50.00 |
| Structure excavation const. | 401SD20-0001 | CY | 33 | 20 (61%) | $20.00 | $40.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elk Knob, Inc. | 50 | 27 of 50 |
| Ken Construction Co., Inc. | 30 | 9 of 30 |
| Estes Bros. Const., Inc. | 20 | 13 of 20 |
| W-L Construction & Paving, Inc. | 18 | 9 of 18 |
| Crossroads Bridge Inc | 16 | 7 of 16 |
| Cleco Corporation | 13 | 7 of 13 |
| Glass Machinery and Excavation, Inc. | 11 | 7 of 11 |
| D & D Contractors, Incorporated | 9 | 2 of 9 |
| P & J Contracting, L.L.C. | 9 | 1 of 9 |
| C.L. Dale Construction Services, LLC | 9 | 4 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 FEB 2026 | C0000123319B54 | Bristol | Sgr - bridge superstructure replacement | 4 of 8 | $3,110,163 | +13% |
| 15 DEC 2021 | C0000113885N01 | Bristol | Sgr - bridge rehab over north fork holston river | 2 of 3 | $501,445 | +26% |
| 17 NOV 2021 | CM119LMA115175 | Bristol | Bridge deck replacement over norfolk southern railroad | 1 of 3 | $1,276,451 | Low, 20% under the second |
| 28 JUL 2021 | C0000110797C01 | Bristol | Smartscale - intersection improvements at railroad drive | 3 of 3 | $1,583,485 | +16% |
| 24 FEB 2021 | C0000117348B63 | Bristol | Stp-br01 (366)0622-086-841, b663 | 2 of 3 | $1,626,848 | +31% |
| 24 JUN 2020 | C000115176B12 | Bristol | On-call interstate bridge repair | 1 of 3 | $1,902,780 | Low, 18% under the second |
| 22 APR 2020 | C0000094725B58 | Salem | Bridge replacement over craig branch | 3 of 3 | $1,105,538 | +14% |
| 22 JAN 2020 | C0000115346N01 | Bristol | Southbound acceleration & deceleration lane extension | 3 of 3 | $1,418,130 | +96% |
| 23 OCT 2019 | C0000110951B52 | Bristol | Bridge replacement over big wilson creek | 1 of 3 | $584,162 | Low, 1.0% under the second |
| 21 AUG 2019 | C000110011B49 | Bristol | Sgr - superstructure replacement over copper creek | 2 of 3 | $761,124 | +4.0% |
| 24 JUL 2019 | C000081548B35B | Bristol | Superstructure replacement over dismal creek | 1 of 3 | $597,144 | Low, 4.0% under the second |
| 26 JUN 2019 | C0000111264B61 | Bristol | Sgr - bridge superstr. replacement over s. fork clinch river | 1 of 3 | $581,512 | Low, 20% under the second |
| 22 MAY 2019 | C0000110012B62 | Bristol | Sgr - bridge replacement over holston river | 2 of 3 | $784,482 | +1.0% |
| 27 FEB 2019 | C000109672B08B | Bristol | Bridge replacement over laurel branch | 2 of 3 | $463,002 | +6.0% |
| 23 JAN 2019 | C0000108145M01 | Bristol | Azure lane-grade, drain surface treat- phase ii | 3 of 3 | $762,646 | +5.0% |
| 14 NOV 2018 | C0000104773B54 | Bristol | Deck replacement over little river | 1 of 3 | $1,333,936 | Low, 3.0% under the second |
| 22 AUG 2018 | C0000104826B51 | Bristol | Sgr - superstructure replacement over little toms creek | 2 of 2 | $391,492 | +34% |
| 22 AUG 2018 | C0000104831C01 | Bristol | Bridge replacement over fifteen mile creek | 2 of 3 | $1,690,776 | +7.0% |
| 25 JUL 2018 | C0000000104189 | Bristol | Safety improvements via road re-alignment | 3 of 3 | $2,160,691 | +97% |
| 25 JUL 2018 | C0000108012C01 | Bristol | Route 744 extension | 2 of 3 | $3,150,343 | +11% |
| 25 APR 2018 | C0000104837B07 | Bristol | Superstructure replacement over town hill creek | 2 of 3 | $2,301,303 | +4.0% |
| 24 JAN 2018 | C00086593B50 | Bristol | Bridge replacement rte. 744 over bluestone river | 1 of 3 | $261,226 | Low, 14% under the second |
| 20 DEC 2017 | C0000109436C01 | Bristol | Smart scale - add left turn lane along leatherwood lane | 3 of 3 | $396,546 | +29% |
| 15 NOV 2017 | C0000108104D44 | Bristol | Wytheville residency culvert replacement | 3 of 3 | $294,859 | +18% |
| 26 APR 2017 | C0000104541B55 | Bristol | Prop. superstructure replacement rte. 712 over millers creek | 1 of 3 | $188,550 | Low, 15% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.