Patrick Construction, Inc.: VDOT bid record

Patrick Construction, Inc. submitted 123 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 04 FEB 2026, and was the low bidder on 48 of them (39%). When it was not low, its total sat a median +13% above the low bid.

Owner
Virginia DOT
Low bid volume
$29,129,148
Latest bid
04 FEB 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

123Bids
48Low bids
39Win rate, percent
+13%Median gap to the low bid when not low, 75 bids

By year

YearBidsLow bidsWin rate
2002221255%
20039444%
200433100%
20053267%
200612325%
20074250%
20085120%
20097114%
2010400%
201122100%
2012200%
201322100%
20144250%
20156233%
201610220%
20176350%
20187229%
20197343%
20203133%
20214125%
2026100%
Patrick Construction, Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Bristol1224839%
Salem100%
Patrick Construction, Inc., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Siltation control excavation303SD20-0029CY9477 (82%)$1.00$3.50
Aggr. base matl. TY. I no. 21B308SD20-0012TON9969 (70%)$17.00$26.00
Flagger service512SD20-0027HR9344 (47%)$15.00$20.00
Allaying dust511SD20-0001HR6334 (54%)$15.00$22.00
18" pipe302SD20-0028LF5733 (58%)$21.00$37.00
Erosion CTRL. stone CL. I, EC-1414SD20-0003TON5030 (60%)$21.32$54.00
Aggr. matl. no. 1308SD20-0001TON6027 (45%)$17.75$23.00
Alt.breakaway cable term. GR-9505SD20-0038EACH5724 (42%)$2,500.00$2,425.00
Guardrail GR-2505SD20-0030LF5321 (40%)$17.00$18.00
Group 2 channelizing devices512SD20-0024DAY9720 (21%)$1.00$1.00
24" pipe302SD20-0037LF3520 (57%)$27.00$50.00
Structure excavation const.401SD20-0001CY3320 (61%)$20.00$40.00
Patrick Construction, Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Elk Knob, Inc.5027 of 50
Ken Construction Co., Inc.309 of 30
Estes Bros. Const., Inc.2013 of 20
W-L Construction & Paving, Inc.189 of 18
Crossroads Bridge Inc167 of 16
Cleco Corporation137 of 13
Glass Machinery and Excavation, Inc.117 of 11
D & D Contractors, Incorporated92 of 9
P & J Contracting, L.L.C.91 of 9
C.L. Dale Construction Services, LLC94 of 9
Patrick Construction, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 FEB 2026C0000123319B54BristolSgr - bridge superstructure replacement4 of 8$3,110,163+13%
15 DEC 2021C0000113885N01BristolSgr - bridge rehab over north fork holston river2 of 3$501,445+26%
17 NOV 2021CM119LMA115175BristolBridge deck replacement over norfolk southern railroad1 of 3$1,276,451Low, 20% under the second
28 JUL 2021C0000110797C01BristolSmartscale - intersection improvements at railroad drive3 of 3$1,583,485+16%
24 FEB 2021C0000117348B63BristolStp-br01 (366)0622-086-841, b6632 of 3$1,626,848+31%
24 JUN 2020C000115176B12BristolOn-call interstate bridge repair1 of 3$1,902,780Low, 18% under the second
22 APR 2020C0000094725B58SalemBridge replacement over craig branch3 of 3$1,105,538+14%
22 JAN 2020C0000115346N01BristolSouthbound acceleration & deceleration lane extension3 of 3$1,418,130+96%
23 OCT 2019C0000110951B52BristolBridge replacement over big wilson creek1 of 3$584,162Low, 1.0% under the second
21 AUG 2019C000110011B49BristolSgr - superstructure replacement over copper creek2 of 3$761,124+4.0%
24 JUL 2019C000081548B35BBristolSuperstructure replacement over dismal creek1 of 3$597,144Low, 4.0% under the second
26 JUN 2019C0000111264B61BristolSgr - bridge superstr. replacement over s. fork clinch river1 of 3$581,512Low, 20% under the second
22 MAY 2019C0000110012B62BristolSgr - bridge replacement over holston river2 of 3$784,482+1.0%
27 FEB 2019C000109672B08BBristolBridge replacement over laurel branch2 of 3$463,002+6.0%
23 JAN 2019C0000108145M01BristolAzure lane-grade, drain surface treat- phase ii3 of 3$762,646+5.0%
14 NOV 2018C0000104773B54BristolDeck replacement over little river1 of 3$1,333,936Low, 3.0% under the second
22 AUG 2018C0000104826B51BristolSgr - superstructure replacement over little toms creek2 of 2$391,492+34%
22 AUG 2018C0000104831C01BristolBridge replacement over fifteen mile creek2 of 3$1,690,776+7.0%
25 JUL 2018C0000000104189BristolSafety improvements via road re-alignment3 of 3$2,160,691+97%
25 JUL 2018C0000108012C01BristolRoute 744 extension2 of 3$3,150,343+11%
25 APR 2018C0000104837B07BristolSuperstructure replacement over town hill creek2 of 3$2,301,303+4.0%
24 JAN 2018C00086593B50BristolBridge replacement rte. 744 over bluestone river1 of 3$261,226Low, 14% under the second
20 DEC 2017C0000109436C01BristolSmart scale - add left turn lane along leatherwood lane3 of 3$396,546+29%
15 NOV 2017C0000108104D44BristolWytheville residency culvert replacement3 of 3$294,859+18%
26 APR 2017C0000104541B55BristolProp. superstructure replacement rte. 712 over millers creek1 of 3$188,550Low, 15% under the second
Patrick Construction, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy