Structure excavation const., VDOT 401SD20-0001

Low bidders on VDOT contracts carried a median of $93.14 per CY for this item, over the 24 months to 28 OCT 2026, across 16 low bids. Half of all 87 bids fell between $77.47 and $165.00.

Owner
Virginia DOT
Item
401SD20-0001
Unit
CY
Data through
28 OCT 2026

VDOT has bid this work under more than one code: 64011 on lettings from 26 FEB 2002 to 15 DEC 2021 (829 bids); 401SD20-0001 on lettings from 22 OCT 2025 to 22 JUL 2026 (87 bids). They are combined here into one trend.

$93.14Low bidder's median, per CY
$100.00Median of all bids, per CY
16Contracts in the window

By year of letting

Structure excavation const., VDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20022020$25.0060$26.00
20031010$25.0029$30.00
20041515$40.0040$39.00
20051010$27.5028$35.00
20061313$25.0039$30.00
200788$30.0023$45.00
200822$62.506$62.50
20091010$26.0030$30.00
20101010$24.1229$30.00
20111111$34.0033$37.00
20121010$38.2530$40.00
20132323$36.0069$32.00
20142020$31.5054$40.00
20152224$37.5062$49.50
20162827$33.0078$35.00
20171111$49.0033$45.00
20181010$25.0030$34.00
20192424$45.0065$46.00
20201616$47.5046$50.00
20211515$45.8045$50.00
202522$80.007$110.00
20261414$93.1480$100.00

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Culpeper3$107.9520$141.00
Bristol4$62.5019$87.43
Staunton3$84.7817$84.78
Structure excavation const., VDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Quantity (CY)Low bidsLow-bid median
19 to 344$196.00
46 to 3044$96.39
320 to 7924$51.00
796 to 2,5084$88.25
Structure excavation const., VDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

BidderLines bidLowest on the line
Crossroads Bridge Inc3820 (53%)
Patrick Construction, Inc.3320 (61%)
DLB, Inc.3119 (61%)
Elk Knob, Inc.4516 (36%)
Abernathy Construction Corporation3313 (39%)
Ken Construction Co., Inc.4112 (29%)
Structure excavation const., VDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
22 JUL 2026C0000118431B20Culpeper792$52.00$101.476Freyssinet, Inc.VDOT
22 JUL 2026C0000121138B52Bristol796$75.00$80.005Elk Knob, Inc.VDOT
24 JUN 2026C0000112964B03Staunton182$108.00$165.005Hammond-Mitchell, Inc.VDOT
24 JUN 2026C0000117111B62Bristol570$76.68$100.003King General Contractors, Inc.VDOT
24 JUN 2026C0000121544B01Richmond34$362.28$222.005Freyssinet, Inc.VDOT
27 MAY 2026C0000121826C01Northern Virginia154$250.00$188.324Fort Myer Construction CorporationVDOT
27 MAY 2026C0000118430B39Culpeper921$107.95$132.508Burleigh Construction Co., Inc.VDOT
22 APR 2026C0000117024B05Staunton304$84.78$84.787Fairfield-Echols, LLCVDOT
22 APR 2026C0000124564B64Culpeper19$142.00$342.506WG Construction Co., Inc.VDOT
25 MAR 2026C0000121531B68Hampton Roads560$41.00$100.007Crofton Construction Services,VDOT
25 FEB 2026C0000117021B19Staunton1,063$73.00$71.645Freyssinet, Inc.VDOT
04 FEB 2026C0000126720N01Fredericksburg20$250.00$250.003M. D. Miller Co., Inc.VDOT
04 FEB 2026C0000123319B54Bristol46$16.00$100.008Freyssinet, Inc.VDOT
04 FEB 2026C0000113851B01Fredericksburg2,508$101.50$81.988WG Construction Co., Inc.VDOT
19 NOV 2025C0000116160B01Bristol320$50.00$50.003Caton Construction Group, Inc.VDOT
Latest VDOT contracts carrying Structure excavation const.

Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.

How these prices were read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the VDOT letting of 28 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way