VDOT contract C0000118430B39 bid tabulation
Sgr - bridge replacement. Let by Virginia DOT on May 27, 2026, Fluvanna, Culpeper. 8 bids received; low bid $1,987,271 by Burleigh Construction Co., Inc..
- Owner
- Virginia DOT
- Letting
- 27 MAY 2026
- Pay items
- 56
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Burleigh Construction Co., Inc. | $1,987,271 | Low |
| 2 | Haymes Brothers, Inc. | $2,154,093 | +8.0% |
| 3 | WG Construction Co., Inc. | $2,222,760 | +12% |
| 4 | Fairfield-Echols, LLC | $2,513,925 | +27% |
| 5 | Stonewall Bridge, Inc. | $2,826,376 | +42% |
| 6 | Brayman Construction Corporation | $2,830,760 | +42% |
| 7 | Caton Construction Group, Inc. | $3,074,610 | +55% |
| 8 | Kokosing Construction Company, Inc. | $3,476,982 | +75% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Burleigh Construction Co., Inc. | 2. Haymes Brothers, Inc. | 3. WG Construction Co., Inc. | 4. Fairfield-Echols, LLC | 5. Stonewall Bridge, Inc. | 6. Brayman Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $95,250 | $75,000 | $40,000 | $26,620 | $40,000 | $50,000 |
| 0001-0020 | Regular excavation (303SD20-0001) | CY | 126 | $101.60 | $50.00 | $85.00 | $165.00 | $100.00 | $250.00 |
| 0001-0030 | Borrow excavation (303SD20-0007) | CY | 43 | $127.00 | $100.00 | $140.00 | $159.50 | $150.00 | $135.00 |
| 0001-0040 | Check dam rock TY. II (303SD20-0023) | EACH | 3 | $1,524.00 | $1,250.00 | $2,000.00 | $935.00 | $300.00 | $800.00 |
| 0001-0050 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $1,905.00 | $500.00 | $7,500.00 | $5,628.08 | $5,000.00 | $15,000 |
| 0001-0060 | Siltation control excavation (303SD20-0029) | CY | 70 | $3.81 | $25.00 | $75.00 | $0.01 | $1.00 | $10.00 |
| 0001-0070 | Temp. silt fence type A (303SD20-0034) | LF | 412 | $6.35 | $7.00 | $11.00 | $3.30 | $10.00 | $60.00 |
| 0001-0080 | Turbidity curtain, pervious TY. I (303SD20-0037) | LF | 130 | $95.25 | $36.00 | $67.00 | $35.34 | $150.00 | $25.00 |
| 0001-0090 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 171 | $85.09 | $152.00 | $149.00 | $51.15 | $100.00 | $200.00 |
| 0001-0100 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 27 | $481.33 | $420.00 | $874.00 | $416.90 | $570.00 | $379.00 |
| 0001-0110 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 52 | $483.87 | $420.00 | $532.00 | $419.10 | $500.00 | $381.00 |
| 0001-0120 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 48 | $478.79 | $420.00 | $825.00 | $470.80 | $560.00 | $377.00 |
| 0001-0130 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 32 | $12.70 | $60.00 | $30.00 | $82.50 | $12.00 | $250.00 |
| 0001-0140 | Structure excavation const. (401SD20-0001) | CY | 921 | $107.95 | $75.00 | $140.00 | $187.19 | $125.00 | $60.00 |
| 0001-0150 | Select backfill abutment zone (401SD20-0002) | TON | 879 | $67.31 | $80.00 | $115.00 | $83.34 | $100.00 | $90.00 |
| 0001-0160 | Geocomposite wall drain (401SD20-0004) | SY | 33 | $146.05 | $34.00 | $60.00 | $64.98 | $200.00 | $175.00 |
| 0001-0170 | Cofferdam (401SD20-0007) | EACH | 2 | $11,000 | $38,000 | $50,000 | $27,455 | $15,000 | $75,000 |
| 0001-0180 | NS bridge substructure temporary shoring (401SX20-0011) | LS | 1 | $82,550 | $315,000 | $190,000 | $336,849 | $125,000 | $225,837 |
| 0001-0190 | Dynamic pile test (403SD20-0004) | EACH | 1 | $3,048.00 | $2,000.00 | $4,600.00 | $3,685.00 | $3,000.00 | $4,500.00 |
| 0001-0200 | Steel piles 12" (403SD20-0006) | LF | 158 | $50.00 | $175.00 | $283.00 | $195.33 | $600.00 | $200.00 |
| 0001-0210 | Pile point for 12" steel pile (403SD20-0034) | EACH | 12 | $300.00 | $150.00 | $157.00 | $417.62 | $400.00 | $500.00 |
| 0001-0220 | Driving test for 12" steel pile (403SD20-0036) | LF | 14 | $260.00 | $200.00 | $320.00 | $530.86 | $200.00 | $200.00 |
| 0001-0230 | NS preboring pile preboring pile (403SX20-0016) | LF | 120 | $1,300.00 | $725.00 | $450.00 | $856.07 | $1,000.00 | $1,000.00 |
| 0001-0240 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 162.80 | $984.25 | $1,550.00 | $1,425.00 | $1,674.90 | $2,000.00 | $1,300.00 |
| 0001-0250 | Shear keys (404SP20-0002) | CF | 31 | $381.00 | $700.00 | $1,000.00 | $769.01 | $750.00 | $2,300.00 |
| 0001-0260 | NS prestressed concrete slab 3' X 21" X 60' (405SX20-0004) | EACH | 5 | $33,020 | $42,000 | $38,184 | $38,559 | $100,000 | $62,000 |
| 0001-0270 | NS prestressed concrete slab 4' X 21" X 60' (405SX20-0004) | EACH | 2 | $33,020 | $42,000 | $40,016 | $38,559 | $120,000 | $62,000 |
| 0001-0280 | Reinforcing steel substruct. const. (406SD20-0006) | LB | 9,600 | $2.08 | $2.00 | $2.15 | $4.33 | $5.00 | $7.00 |
| 0001-0290 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 5,280 | $4.61 | $3.30 | $5.30 | $5.67 | $7.00 | $8.00 |
| 0001-0300 | NS bridge superstructure temporary detour bridge (410SX20-0007) | LS | 1 | $322,250 | $350,000 | $250,000 | $425,544 | $300,000 | $400,000 |
| 0001-0310 | NS dism. & rem. exist. STR. STR. no. 6036 (413SX20-0002) | LS | 1 | $240,000 | $80,000 | $100,000 | $160,139 | $100,000 | $134,000 |
| 0001-0320 | NS env.& worker protect. STR. no. 6036 (413SX20-0003) | LS | 1 | $7,620.00 | $7,500.00 | $10,000 | $1.00 | $20,000 | $35,000 |
| 0001-0330 | NS material disposal STR. no. 6036 type B (413SX20-0004) | LS | 1 | $7,620.00 | $3,500.00 | $36,000 | $1.00 | $40,000 | $65,000 |
| 0001-0340 | Dry riprap CL.II 38" (414SD20-0057) | TON | 562 | $146.05 | $150.00 | $195.00 | $177.89 | $190.00 | $200.00 |
| 0001-0350 | Guardrail, thrie beam (505SD20-0074) | LF | 129 | $114.30 | $250.00 | $435.00 | $414.70 | $350.00 | $300.00 |
| 0001-0360 | Demo. of pavement flexible (508SD20-0004) | SY | 119 | $38.10 | $45.00 | $24.00 | $26.95 | $20.00 | $19.00 |
| 0001-0370 | Traffic barrier service MB-11A (512SD20-0003) | LF | 32 | $127.00 | $125.00 | $350.00 | $113.00 | $100.00 | $200.00 |
| 0001-0380 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $349.25 | $900.00 | $500.00 | $438.87 | $300.00 | $2,500.00 |
| 0001-0390 | Temporary sign (512SD20-0014) | SF | 288 | $26.67 | $28.00 | $40.00 | $32.45 | $24.00 | $21.00 |
| 0001-0400 | Group 2 channelizing devices (512SD20-0024) | DAY | 9,600 | $0.19 | $0.50 | $0.20 | $0.29 | $2.00 | $3.00 |
| 0001-0410 | Flagger service (512SD20-0027) | HR | 160 | $127.00 | $40.00 | $100.00 | $56.06 | $70.00 | $65.00 |
| 0001-0420 | Mobilization (513SD20-0001) | LS | 1 | $128,600 | $95,000 | $139,500 | $155,696 | $170,000 | $160,000 |
| 0001-0430 | Construction surveying constr. (517SD20-0001) | LS | 1 | $25,400 | $25,000 | $35,000 | $14,300 | $40,000 | $65,000 |
| 0001-0440 | Temporary seed (603SD20-0002) | LB | 10 | $19.05 | $14.00 | $29.00 | $13.46 | $25.00 | $15.00 |
| 0001-0450 | Regular seed (603SD20-0003) | LB | 30 | $97.79 | $16.50 | $19.00 | $56.38 | $29.00 | $10.00 |
| 0001-0460 | Overseeding (603SD20-0004) | LB | 24 | $12.70 | $8.00 | $16.00 | $7.99 | $29.00 | $10.00 |
| 0001-0470 | Legume seed (603SD20-0005) | LB | 1 | $19.05 | $6.75 | $40.00 | $6.71 | $25.00 | $15.00 |
| 0001-0480 | Legume overseeding (603SD20-0006) | LB | 1 | $15.24 | $6.75 | $40.00 | $6.71 | $29.00 | $12.00 |
| 0001-0490 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 1,089 | $1.91 | $1.25 | $6.00 | $0.72 | $5.00 | $1.50 |
| 0001-0500 | Fertilizer nitrogen - N (603SD20-0014) | LB | 10 | $5.08 | $1.40 | $9.70 | $1.39 | $7.00 | $4.00 |
| 0001-0510 | Fertilizer phosphorous - P (603SD20-0015) | LB | 13 | $5.08 | $1.40 | $9.70 | $1.39 | $7.00 | $4.00 |
| 0001-0520 | Fertilizer potassium - K (603SD20-0016) | LB | 7 | $5.08 | $1.40 | $9.70 | $1.39 | $7.00 | $4.00 |
| 0001-0530 | Lime (603SD20-0017) | TON | 0.45 | $571.50 | $310.00 | $565.00 | $310.20 | $400.00 | $450.00 |
| 0001-0540 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 6 | $952.50 | $415.00 | $242.00 | $412.50 | $800.00 | $750.00 |
| 0001-0550 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 18 | $127.00 | $20.00 | $72.00 | $19.80 | $150.00 | $100.00 |
| 0001-0560 | Sign panel (701SD20-0001) | SF | 24 | $95.25 | $31.00 | $89.00 | $30.80 | $80.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of May 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.