Haymes Brothers, Inc.: VDOT bid record
Haymes Brothers, Inc. submitted 79 bids on Virginia DOT contracts in the data, from 28 JAN 2003 to 26 AUG 2026, and was the low bidder on 26 of them (33%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $75,104,127
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 2 | 0 | 0% |
| 2006 | 3 | 1 | 33% |
| 2008 | 2 | 0 | 0% |
| 2010 | 2 | 1 | 50% |
| 2011 | 4 | 2 | 50% |
| 2012 | 4 | 1 | 25% |
| 2013 | 5 | 2 | 40% |
| 2014 | 12 | 3 | 25% |
| 2015 | 6 | 4 | 67% |
| 2016 | 11 | 2 | 18% |
| 2017 | 1 | 1 | 100% |
| 2018 | 4 | 3 | 75% |
| 2019 | 4 | 3 | 75% |
| 2020 | 3 | 1 | 33% |
| 2021 | 3 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 12 | 2 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 32 | 12 | 38% |
| Lynchburg | 28 | 11 | 39% |
| Richmond | 11 | 3 | 27% |
| Staunton | 3 | 0 | 0% |
| Culpeper | 3 | 0 | 0% |
| Bristol | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sign | 512SD20-0014 | SF | 62 | 26 (42%) | $22.00 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 57 | 25 (44%) | $1.10 | $1.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 56 | 23 (41%) | $4.00 | $3.00 |
| Regular seed | 603SD20-0003 | LB | 52 | 22 (42%) | $16.50 | $13.50 |
| NS BR.superstr. wid./repair replace bearing | 412SX20-0009 | EACH | 74 | 21 (28%) | $2,000.00 | $1,500.00 |
| Asphalt concrete BM-25.0 | 315SD20-0010 | TON | 47 | 21 (45%) | $183.15 | $124.00 |
| Flagger service | 512SD20-0027 | HR | 54 | 20 (37%) | $29.24 | $20.00 |
| Siltation control excavation | 303SD20-0029 | CY | 54 | 18 (33%) | $10.00 | $3.50 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 48 | 18 (38%) | $10.00 | $8.00 |
| Dewatering basin EC-8 | 303SD20-0028 | EACH | 29 | 18 (62%) | $1,200.00 | $1,000.00 |
| Concrete class A3 misc. | 504SD20-0001 | CY | 27 | 17 (63%) | $1,000.00 | $950.00 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 75 | 16 (21%) | $200.00 | $99.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Burleigh Construction Co., Inc. | 20 | 10 of 20 |
| Crossroads Bridge Inc | 10 | 5 of 10 |
| Allegheny Construction Company, Inc. | 8 | 0 of 8 |
| D. A. Brown, Inc. | 7 | 5 of 7 |
| Caton Construction Group, Inc. | 6 | 2 of 6 |
| F & B Contractors, LTD. | 5 | 0 of 5 |
| DLB, Inc. | 5 | 1 of 5 |
| Lanford Brothers Company, Incorporated | 5 | 4 of 5 |
| W. C. English, Incorporated | 4 | 1 of 4 |
| Fairfield-Echols, LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000119687C01B | Richmond | Smart scale - intersection improvements | 2 of 2 | $3,443,502 | +1.0% |
| 22 JUL 2026 | C0000118431B20 | Culpeper | Sgr- bridge replacement | 2 of 6 | $2,124,854 | +5.0% |
| 22 JUL 2026 | C0000120710C01 | Lynchburg | Sgr*/smart scale* - roundabout | 2 of 2 | $8,450,014 | +12% |
| 24 JUN 2026 | C0000112964B03 | Staunton | Sgr - bridge replacement | 3 of 5 | $1,990,848 | +25% |
| 24 JUN 2026 | C0000119467C01 | Salem | Smart scale - road improvements/ lanes addition | 1 of 2 | $2,432,572 | Low, 2.0% under the second |
| 27 MAY 2026 | C0000118430B39 | Culpeper | Sgr - bridge replacement | 2 of 8 | $2,154,093 | +8.0% |
| 27 MAY 2026 | C0000119458C01 | Salem | Smart scale - roundabout | 2 of 6 | $8,685,089 | +11% |
| 27 MAY 2026 | C0000115456C01 | Salem | Smart scale - int. improvements / acceleration lane | 2 of 4 | $3,871,191 | +13% |
| 22 APR 2026 | C0000119167C01 | Lynchburg | Smart scale - roundabout | 2 of 2 | $4,859,759 | +3.0% |
| 22 APR 2026 | C0000117024B05 | Staunton | Sgr - bridge rehabilitation | 2 of 7 | $3,876,659 | +32% |
| 22 APR 2026 | C0000119165C01 | Lynchburg | Smart scale- intersection improvement | 1 of 2 | $2,063,465 | Low, 9.0% under the second |
| 04 FEB 2026 | C0000119451M01 | Salem | Smart scale - intersection improvements | 2 of 3 | $4,825,320 | +7.0% |
| 17 DEC 2025 | C0000119452C50 | Salem | Smart scale - intersection improvements/ lane addition | 2 of 5 | $2,593,499 | +4.0% |
| 22 SEP 2021 | C0000118341D38 | Salem | Sgr - culvert replacement | 2 of 3 | $1,092,256 | +14% |
| 25 AUG 2021 | C0000110620B36 | Salem | Sgr - superstructure replacement over roanoke river | 2 of 3 | $1,667,032 | +4.0% |
| 24 MAR 2021 | C0000116749N01 | Lynchburg | Nhpp-br0-3(343)9999-963-549, n501 | 3 of 3 | $2,341,160 | +20% |
| 16 DEC 2020 | C0000104946C01 | Lynchburg | Smart scale - grade, drain and pave: passing lane | 1 of 3 | $14,078,560 | Low, 10% under the second |
| 27 MAY 2020 | C000115006B61 | Salem | On-call bridge repair and maintenance | 2 of 3 | $4,288,316 | +8.0% |
| 22 JAN 2020 | C0000109829C01 | Lynchburg | Smart scale - construct turn lanes | 3 of 3 | $1,865,875 | +20% |
| 21 AUG 2019 | C0000114778B05 | Lynchburg | Replace bridge and approaches over sandy creek | 1 of 3 | $1,974,290 | Low, 6.0% under the second |
| 21 AUG 2019 | C0000114779B65 | Lynchburg | Bridge replacement over branch of birch creek | 1 of 3 | $1,420,633 | Low, 2.0% under the second |
| 26 JUN 2019 | C0000108897N01 | Salem | Smart scale - turn lane to us 220 south / us 58 east bypass | 1 of 3 | $806,245 | Low, 0.0% under the second |
| 22 MAY 2019 | C0000114700N01 | Lynchburg | On - call ada compliance curb ramp improvements | 3 of 3 | $413,875 | +47% |
| 24 OCT 2018 | C0000097711B63 | Salem | Bridge replacement over ivy creek | 1 of 3 | $1,434,062 | Low, 3.0% under the second |
| 20 JUN 2018 | C0000112820B47 | Lynchburg | Dismantle and remove clarkton bridge | 3 of 3 | $785,318 | +55% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.