VDOT contract C0000118431B20 bid tabulation
Sgr- bridge replacement. Let by Virginia DOT on July 22, 2026, Madison, Culpeper. 6 bids received; low bid $2,018,342 by Freyssinet, Inc..
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 63
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Freyssinet, Inc. | $2,018,342 | Low |
| 2 | Haymes Brothers, Inc. | $2,124,854 | +5.0% |
| 3 | Caton Construction Group, Inc. | $2,492,565 | +23% |
| 4 | Allegheny Construction Company, Inc. | $2,876,151 | +43% |
| 5 | TERRA SITE CONSTRUCTORS, LLC dba TERRA | $2,942,467 | +46% |
| 6 | Sagres Construction Corporation | $3,920,000 | +94% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Freyssinet, Inc. | 2. Haymes Brothers, Inc. | 3. Caton Construction Group, Inc. | 4. Allegheny Construction Company, Inc. | 5. TERRA SITE CONSTRUCTORS, LLC dba TERRA | 6. Sagres Construction Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $11,500 | $32,000 | $12,000 | $200,000 | $167,600 | $175,000 |
| 0001-0020 | Regular excavation (303SD20-0001) | CY | 71 | $64.00 | $50.00 | $60.50 | $165.00 | $237.00 | $329.87 |
| 0001-0030 | Borrow excavation (303SD20-0007) | CY | 468 | $99.00 | $125.00 | $122.50 | $85.00 | $76.00 | $50.21 |
| 0001-0040 | Check dam rock TY. II (303SD20-0023) | EACH | 11 | $215.00 | $350.00 | $2,398.16 | $900.00 | $2,548.00 | $1,064.47 |
| 0001-0050 | Dewatering basin EC-8 (303SD20-0028) | EACH | 4 | $430.00 | $1,200.00 | $1,035.84 | $9,000.00 | $614.00 | $82,288 |
| 0001-0060 | Siltation control excavation (303SD20-0029) | CY | 110 | $9.00 | $10.00 | $5.00 | $25.00 | $104.00 | $47.96 |
| 0001-0070 | Temp. silt fence type A (303SD20-0034) | LF | 424 | $6.00 | $10.00 | $15.19 | $12.00 | $5.00 | $6.09 |
| 0001-0080 | NS erosion control turbidity curtain (impervious) (303SX20-0022) | LF | 107 | $72.00 | $40.00 | $46.08 | $180.00 | $55.00 | $35.29 |
| 0001-0090 | Aggr. base matl. TY. I no. 21A (308SD20-0011) | TON | 398 | $115.00 | $150.00 | $178.96 | $80.00 | $170.00 | $49.68 |
| 0001-0100 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 21 | $780.00 | $1.00 | $685.00 | $615.00 | $459.00 | $470.22 |
| 0001-0110 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 34 | $780.00 | $1,000.00 | $730.00 | $560.00 | $459.00 | $346.44 |
| 0001-0120 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 49 | $780.00 | $450.00 | $360.00 | $535.00 | $459.00 | $285.23 |
| 0001-0130 | NS saw-cut asph conc (full depth) (315SX20-0011) | LF | 120 | $150.00 | $30.00 | $38.81 | $30.00 | $32.00 | $7.06 |
| 0001-0140 | Structure excavation const. (401SD20-0001) | CY | 792 | $52.00 | $100.00 | $102.93 | $100.00 | $123.00 | $250.00 |
| 0001-0150 | Select backfill abutment zone (401SD20-0002) | TON | 635 | $86.00 | $100.00 | $97.66 | $100.00 | $110.00 | $66.35 |
| 0001-0160 | Geocomposite wall drain (401SD20-0004) | SY | 37 | $260.00 | $32.00 | $54.15 | $200.00 | $104.00 | $69.34 |
| 0001-0170 | Cofferdam (401SD20-0007) | EACH | 2 | $20,100 | $40,000 | $39,406 | $65,000 | $73,630 | $354,000 |
| 0001-0180 | NS bridge substructure temporary shoring (401SX20-0011) | LS | 1 | $299,000 | $25,000 | $107,608 | $150,000 | $349,160 | $282,335 |
| 0001-0190 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 206 | $595.00 | $1,800.00 | $1,715.15 | $2,200.00 | $1,496.00 | $2,500.00 |
| 0001-0200 | Shear keys (404SP20-0002) | CF | 37 | $485.00 | $680.00 | $1,310.40 | $900.00 | $782.00 | $1,349.26 |
| 0001-0210 | Prest.conc.box beam 3' X 2'3"X(+65'-70') (405SD20-0154) | EACH | 3 | $107,000 | $70,000 | $88,354 | $65,000 | $61,260 | $40,543 |
| 0001-0220 | Prest.conc.box beam 4' X 2'3"X(+65'-70') (405SD20-0188) | EACH | 2 | $63,400 | $70,000 | $113,908 | $65,000 | $65,750 | $50,349 |
| 0001-0230 | Reinforcing steel substruct. const. (406SD20-0006) | LB | 8,130 | $2.50 | $1.85 | $3.13 | $5.00 | $3.00 | $4.52 |
| 0001-0240 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 4,700 | $5.00 | $3.15 | $5.84 | $7.00 | $5.00 | $4.52 |
| 0001-0250 | NS bridge superstructure temporary detour bridge (410SX20-0007) | LS | 1 | $264,000 | $475,000 | $489,000 | $525,000 | $566,390 | $364,204 |
| 0001-0260 | NS dism. & rem. exist. STR. STR. no. 6120 (413SX20-0002) | LS | 1 | $11,100 | $85,000 | $66,502 | $130,000 | $108,940 | $258,000 |
| 0001-0270 | NS env.& worker protect. STR. no. 6120 (413SX20-0003) | LS | 1 | $11,700 | $6,800.00 | $6,000.00 | $8,000.00 | $31,620 | $5,881.97 |
| 0001-0280 | NS material disposal STR. no. 6120 type B (413SX20-0004) | LS | 1 | $5,860.00 | $4,200.00 | $28,758 | $4,000.00 | $27,180 | $11,764 |
| 0001-0290 | Dry riprap CL.II 38" (414SD20-0057) | TON | 494 | $135.00 | $125.00 | $170.40 | $200.00 | $203.00 | $169.01 |
| 0001-0300 | Guardrail, thrie beam (505SD20-0074) | LF | 150 | $430.00 | $175.00 | $358.19 | $135.00 | $118.00 | $257.63 |
| 0001-0310 | Fence FE-W1 (507SD20-0001) | LF | 90 | $75.00 | $75.00 | $36.17 | $80.00 | $154.00 | $70.58 |
| 0001-0320 | Fence FE-B (507SD20-0015) | LF | 10 | $75.00 | $350.00 | $88.99 | $180.00 | $230.00 | $117.64 |
| 0001-0330 | NS fence wooden (match in kind) (507SX20-0013) | LF | 90 | $315.00 | $160.00 | $38.15 | $100.00 | $116.00 | $58.82 |
| 0001-0340 | Demo. of pavement flexible (508SD20-0004) | SY | 240 | $115.00 | $25.00 | $62.38 | $25.00 | $41.00 | $35.29 |
| 0001-0350 | NS remove exist. fence existing fence (510SX20-0016) | LF | 100 | $2.50 | $12.50 | $23.70 | $15.00 | $40.00 | $29.41 |
| 0001-0360 | Allaying dust (511SD20-0001) | HR | 150 | $61.50 | $1.00 | $40.44 | $50.00 | $129.00 | $74.99 |
| 0001-0370 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $545.00 | $575.00 | $1,414.16 | $650.00 | $606.00 | $124.70 |
| 0001-0380 | Temporary sign (512SD20-0014) | SF | 295 | $47.00 | $23.00 | $18.74 | $27.00 | $47.00 | $31.17 |
| 0001-0390 | Group 2 channelizing devices (512SD20-0024) | DAY | 1,080 | $0.50 | $5.00 | $1.80 | $3.00 | $1.00 | $3.39 |
| 0001-0400 | Port.changeable mess. sign (512SD20-0025) | HR | 672 | $2.00 | $3.00 | $10.35 | $15.00 | $4.00 | $17.65 |
| 0001-0410 | Warning light TY. B (512SD20-0029) | DAY | 480 | $1.50 | $5.00 | $7.27 | $4.00 | $5.00 | $12.68 |
| 0001-0420 | Traffic barrier ser. conc. MB-7D PC (512SD20-0031) | LF | 40 | $100.00 | $125.00 | $259.17 | $190.00 | $123.00 | $61.05 |
| 0001-0430 | Mobilization (513SD20-0001) | LS | 1 | $68,200 | $95,000 | $124,000 | $170,000 | $160,000 | $302,189 |
| 0001-0440 | Construction surveying constr. (517SD20-0001) | LS | 1 | $49,800 | $32,000 | $16,813 | $75,000 | $60,930 | $50,212 |
| 0001-0450 | Temporary seed (603SD20-0002) | LB | 4.60 | $46.00 | $55.00 | $30.59 | $60.00 | $43.00 | $14.40 |
| 0001-0460 | Regular seed (603SD20-0003) | LB | 38 | $25.00 | $22.00 | $9.10 | $25.00 | $15.00 | $18.66 |
| 0001-0470 | Overseeding (603SD20-0004) | LB | 31 | $28.00 | $11.00 | $11.61 | $25.00 | $36.00 | $9.72 |
| 0001-0480 | Legume seed (603SD20-0005) | LB | 3 | $64.00 | $55.00 | $57.05 | $65.00 | $78.00 | $37.64 |
| 0001-0490 | Legume overseeding (603SD20-0006) | LB | 2 | $90.00 | $22.00 | $47.24 | $65.00 | $78.00 | $37.65 |
| 0001-0500 | Hydraulic erosion control product type 1 (603SD20-0007) | SY | 97 | $31.00 | $22.00 | $5.00 | $3.00 | $4.00 | $0.68 |
| 0001-0510 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 864 | $31.00 | $5.50 | $5.00 | $3.00 | $4.00 | $0.92 |
| 0001-0520 | Fertilizer nitrogen - N (603SD20-0014) | LB | 10 | $21.00 | $5.50 | $14.78 | $6.00 | $40.00 | $5.88 |
| 0001-0530 | Fertilizer phosphorous - P (603SD20-0015) | LB | 13 | $19.00 | $5.50 | $17.95 | $6.00 | $19.00 | $5.88 |
| 0001-0540 | Fertilizer potassium - K (603SD20-0016) | LB | 7 | $19.00 | $5.50 | $17.31 | $6.00 | $19.00 | $5.88 |
| 0001-0550 | Lime (603SD20-0017) | TON | 0.47 | $3,110.00 | $600.00 | $3,937.17 | $600.00 | $1,525.00 | $305.87 |
| 0001-0560 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 163 | $31.00 | $11.00 | $2.85 | $5.00 | $28.00 | $7.57 |
| 0001-0570 | Rolled erosion CTRL product EC-3 type 3 (606SD20-0007) | SY | 72 | $31.00 | $20.00 | $120.00 | $135.00 | $40.00 | $7.59 |
| 0001-0580 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 6 | $280.00 | $410.00 | $374.00 | $350.00 | $121.00 | $196.07 |
| 0001-0590 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 3 | $955.00 | $190.00 | $171.00 | $600.00 | $242.00 | $211.75 |
| 0001-0600 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 84 | $49.00 | $20.00 | $17.97 | $38.00 | $19.00 | $29.41 |
| 0001-0610 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 7 | $1,070.00 | $658.00 | $592.00 | $900.00 | $496.00 | $1,764.59 |
| 0001-0620 | Sign panel (701SD20-0001) | SF | 17 | $135.00 | $33.00 | $29.81 | $85.00 | $45.00 | $55.49 |
| 0001-0630 | Road edge del. ED-2 (702SD20-0003) | EACH | 12 | $1,800.00 | $370.00 | $336.00 | $1,200.00 | $245.00 | $470.56 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.