Allegheny Construction Company, Inc.: VDOT bid record
Allegheny Construction Company, Inc. submitted 85 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 26 AUG 2026, and was the low bidder on 17 of them (20%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $49,414,470
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 2 | 1 | 50% |
| 2004 | 3 | 0 | 0% |
| 2005 | 1 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 0 | 0% |
| 2008 | 2 | 0 | 0% |
| 2010 | 2 | 0 | 0% |
| 2011 | 7 | 2 | 29% |
| 2012 | 3 | 1 | 33% |
| 2013 | 4 | 1 | 25% |
| 2015 | 8 | 2 | 25% |
| 2016 | 8 | 1 | 13% |
| 2017 | 2 | 0 | 0% |
| 2018 | 5 | 2 | 40% |
| 2019 | 6 | 2 | 33% |
| 2020 | 5 | 1 | 20% |
| 2021 | 8 | 1 | 13% |
| 2025 | 4 | 0 | 0% |
| 2026 | 13 | 3 | 23% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 48 | 7 | 15% |
| Staunton | 17 | 2 | 12% |
| Lynchburg | 9 | 6 | 67% |
| Culpeper | 6 | 1 | 17% |
| Richmond | 3 | 1 | 33% |
| Bristol | 1 | 0 | 0% |
| Hampton Roads | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Overseeding | 603SD20-0004 | LB | 75 | 53 (71%) | $4.26 | $5.00 |
| Flagger service | 512SD20-0027 | HR | 71 | 31 (44%) | $25.00 | $20.00 |
| Temporary sign | 512SD20-0014 | SF | 73 | 30 (41%) | $22.00 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 74 | 29 (39%) | $4.00 | $3.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 71 | 28 (39%) | $1.00 | $1.00 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 75 | 25 (33%) | $4,300.00 | $2,000.00 |
| Lime | 603SD20-0017 | TON | 75 | 25 (33%) | $225.00 | $200.00 |
| Sign panel | 701SD20-0001 | SF | 54 | 22 (41%) | $35.00 | $34.00 |
| Fertilizer potassium - K | 603SD20-0016 | LB | 40 | 22 (55%) | $2.00 | $3.00 |
| Fertilizer phosphorous - P | 603SD20-0015 | LB | 40 | 21 (53%) | $2.00 | $3.00 |
| Fertilizer nitrogen - N | 603SD20-0014 | LB | 40 | 21 (53%) | $2.00 | $3.00 |
| Hydraulic erosion control product type 3 | 603SD20-0009 | SY | 36 | 20 (56%) | $1.10 | $1.26 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Road & Bridge, Inc. | 14 | 7 of 14 |
| Crossroads Bridge Inc | 10 | 8 of 10 |
| Burleigh Construction Co., Inc. | 9 | 4 of 9 |
| Hammond-Mitchell, Inc. | 8 | 5 of 8 |
| Haymes Brothers, Inc. | 8 | 8 of 8 |
| Fairfield-Echols, LLC | 8 | 4 of 8 |
| E. C. Pace Company, Inc. | 7 | 6 of 7 |
| Caton Construction Group, Inc. | 7 | 5 of 7 |
| DLB, Inc. | 6 | 4 of 6 |
| Branch Highways, Inc. | 6 | 4 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000124095M01 | Salem | Smart scale - road widening and improvements | 1 of 4 | $4,147,707 | Low, 8.0% under the second |
| 22 JUL 2026 | C0000119468M01 | Salem | Smart scale - road widening | 2 of 2 | $5,461,636 | +47% |
| 22 JUL 2026 | C0000120697C01 | Salem | Intersection improvements / pedestrian accommodations | 2 of 3 | $6,108,849 | +25% |
| 22 JUL 2026 | C0000118431B20 | Culpeper | Sgr- bridge replacement | 4 of 6 | $2,876,151 | +43% |
| 24 JUN 2026 | C0000112964B03 | Staunton | Sgr - bridge replacement | 4 of 5 | $2,047,890 | +28% |
| 22 APR 2026 | C0000119163C01 | Lynchburg | Smart scale - roundabout | 1 of 2 | $7,710,250 | Low, 3.0% under the second |
| 22 APR 2026 | C0000117024B05 | Staunton | Sgr - bridge rehabilitation | 4 of 7 | $4,402,036 | +50% |
| 25 MAR 2026 | C0000126858N01 | Salem | On-call ada compliance curb ramp improvements | 6 of 6 | $1,509,614 | +116% |
| 25 MAR 2026 | C0000128438N01 | Salem | Rural rustic road improvements | 1 of 4 | $1,043,179 | Low, 7.0% under the second |
| 25 FEB 2026 | C0000119385C01 | Lynchburg | Smart scale - turn lane improvements | 4 of 5 | $2,836,532 | +42% |
| 25 FEB 2026 | C0000115132M01 | Staunton | Smart scale - pedestrian road improvements | 2 of 5 | $2,744,572 | +16% |
| 04 FEB 2026 | C0000119457C01 | Salem | Smart scale - intersection improvements / lanes addition | 2 of 3 | $1,147,604 | +15% |
| 04 FEB 2026 | C0000120758M01 | Salem | Smart scale - intersection improvements | 3 of 3 | $4,219,270 | +31% |
| 17 DEC 2025 | C0000119474C01 | Salem | Smart scale - intersection turn improvements | 2 of 2 | $1,632,293 | +16% |
| 17 DEC 2025 | C0000119452C50 | Salem | Smart scale - intersection improvements/ lane addition | 3 of 5 | $3,017,177 | +21% |
| 19 NOV 2025 | C0000119503C01 | Salem | Smart scale - safety improvements | 2 of 2 | $5,610,180 | 0.0% |
| 22 OCT 2025 | C0000125954C01 | Salem | Parking lot improvements | 2 of 5 | $818,103 | +11% |
| 27 OCT 2021 | C0000112877B10 | Salem | Sgr - bridge replacement over meadow creek | 3 of 3 | $2,027,793 | +3.0% |
| 27 OCT 2021 | C0000113026B01 | Hampton Roads | Sgr - bridge replacement over burnt mill swamp | 2 of 3 | $1,040,524 | +6.0% |
| 28 JUL 2021 | C0000000688C02 | Salem | 13th st. improvements | 1 of 3 | $5,801,852 | Low, 13% under the second |
| 28 JUL 2021 | C0000110001B54 | Culpeper | Sgr - bridge replacement over lickinghole creek | 3 of 3 | $1,232,415 | +10% |
| 26 MAY 2021 | C0000110367N01 | Salem | Resurface unpaved road | 3 of 3 | $1,182,155 | +32% |
| 24 FEB 2021 | C0000107055M01 | Salem | Turn lane and pedestrian safety improvements | 2 of 3 | $979,972 | +7.0% |
| 24 FEB 2021 | C0000109287M01 | Salem | Smart scale - intersection improvements roundabout | 3 of 3 | $2,258,179 | +19% |
| 24 FEB 2021 | C0000115007B02 | Salem | Sgr - bridge rehabilitation | 3 of 3 | $2,450,052 | +28% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.