E. C. Pace Company, Inc.: VDOT bid record
E. C. Pace Company, Inc. submitted 31 bids on Virginia DOT contracts in the data, from 22 APR 2003 to 26 AUG 2026, and was the low bidder on 13 of them (42%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $28,051,772
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 1 | 0 | 0% |
| 2004 | 1 | 0 | 0% |
| 2008 | 2 | 2 | 100% |
| 2009 | 1 | 0 | 0% |
| 2010 | 1 | 1 | 100% |
| 2015 | 4 | 3 | 75% |
| 2016 | 5 | 1 | 20% |
| 2017 | 2 | 0 | 0% |
| 2018 | 2 | 1 | 50% |
| 2019 | 3 | 2 | 67% |
| 2020 | 2 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2026 | 4 | 3 | 75% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 22 | 10 | 45% |
| Lynchburg | 7 | 2 | 29% |
| Bristol | 1 | 1 | 100% |
| Richmond | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Siltation control excavation | 303SD20-0029 | CY | 27 | 19 (70%) | $1.00 | $3.50 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 46 | 16 (35%) | $4,848.50 | $2,000.00 |
| Inlet protection type A | 303SD20-0030 | EACH | 16 | 12 (75%) | $237.66 | $300.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 28 | 11 (39%) | $3.94 | $3.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 21 | 11 (52%) | $3.99 | $5.00 |
| Concrete class A3 misc. | 504SD20-0001 | CY | 19 | 11 (58%) | $1,634.44 | $950.00 |
| Flagger service | 512SD20-0027 | HR | 24 | 10 (42%) | $30.00 | $20.00 |
| Regular seed | 603SD20-0003 | LB | 28 | 9 (32%) | $19.09 | $13.50 |
| Lime | 603SD20-0017 | TON | 28 | 9 (32%) | $179.19 | $200.00 |
| Temporary sign | 512SD20-0014 | SF | 24 | 9 (38%) | $22.95 | $20.00 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 20 | 9 (45%) | $294.50 | $250.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 21 | 7 (33%) | $6.99 | $8.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Allegheny Construction Company, Inc. | 7 | 1 of 7 |
| DLB, Inc. | 7 | 4 of 7 |
| Jones Road & Bridge, Inc. | 5 | 3 of 5 |
| Boring Contractors, Inc. | 4 | 1 of 4 |
| Fielder'S Choice Enterprises, Inc. | 4 | 2 of 4 |
| Pearson Construction, Inc. | 3 | 2 of 3 |
| Curtis Contracting, Inc. | 3 | 1 of 3 |
| Ramirez Contracting, L.L.C. | 2 | 0 of 2 |
| Haymes Brothers, Inc. | 2 | 1 of 2 |
| Dci/Shires, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000124094M01 | Salem | Smart scale - turn lane improvements | 2 of 3 | $1,306,212 | +14% |
| 22 JUL 2026 | C0000119468M01 | Salem | Smart scale - road widening | 1 of 2 | $3,715,713 | Low, 47% under the second |
| 22 JUL 2026 | C0000119436C01 | Bristol | Smart scale - turn lane improvements | 1 of 4 | $2,673,541 | Low, 5.0% under the second |
| 04 FEB 2026 | C0000120758M01 | Salem | Smart scale - intersection improvements | 1 of 3 | $3,210,545 | Low, 23% under the second |
| 27 OCT 2021 | C0000106701N01 | Salem | Intersection and safety improvements | 3 of 3 | $1,943,795 | +22% |
| 26 MAY 2021 | C0000108882N01 | Salem | Smart scale- west main street sidewalk installation | 3 of 3 | $845,430 | +47% |
| 24 FEB 2021 | C0000107055M01 | Salem | Turn lane and pedestrian safety improvements | 3 of 3 | $988,292 | +8.0% |
| 26 AUG 2020 | C0000109586N01B | Lynchburg | Hsip-5118(298)hsip-005-705, n501 | 3 of 3 | $1,740,874 | +33% |
| 26 FEB 2020 | C0000108907C01 | Salem | Smart scale - road realignment | 2 of 3 | $11,088,450 | +16% |
| 18 DEC 2019 | C000109286M501 | Salem | Smart scale - rte 52 north spot improvements | 3 of 3 | $2,199,770 | +6.0% |
| 30 AUG 2019 | C0000116220N01 | Salem | Emergency contract au1: saincb2010 | 1 of 1 | $637,533 | Low |
| 21 AUG 2019 | C0000111799M01 | Salem | Pedestrian improvements in downtown floyd | 1 of 3 | $786,800 | Low, 2.0% under the second |
| 28 MAR 2018 | C0000008753C01 | Salem | Smart scale - widen to 3 lanes with curb & sidewalk | 3 of 3 | $9,119,531 | +8.0% |
| 28 MAR 2018 | C000108909M01 | Salem | Route 460 at franklin street eb ramp construction | 1 of 3 | $1,074,214 | Low, 7.0% under the second |
| 21 JUN 2017 | CM318DPA110306 | Lynchburg | Districtwide pipe rehab/replacement | 3 of 3 | $1,175,270 | +15% |
| 25 JAN 2017 | C0000011908C04 | Salem | Smartscale-grade, drain, asph pave. utilities & signal | 2 of 3 | $11,566,680 | +8.0% |
| 21 DEC 2016 | C0000067309N01 | Salem | Rte 693 - safety: widen inside s-curve shoulders | 2 of 3 | $569,841 | +18% |
| 21 DEC 2016 | C0000099542M01 | Salem | Park 'n ride facility expansion off rte. 81, exit 140 | 2 of 3 | $2,698,938 | +7.0% |
| 24 AUG 2016 | CM317DPA108558 | Lynchburg | Districtwide pipe rehab | 2 of 3 | $756,543 | +16% |
| 24 FEB 2016 | C000000709C03 | Salem | 0.713 mi. grade, drain, asph pave., arch, signal, & utility | 1 of 3 | $11,994,740 | Low, 5.0% under the second |
| 03 FEB 2016 | C0000105518M01 | Salem | Relocation of falling branch park and ride | 3 of 3 | $3,243,608 | +10% |
| 18 NOV 2015 | C0000064773C01 | Lynchburg | Location: 1.311 mi. grading, paving, drainage, incidentals | 2 of 3 | $8,836,924 | +5.0% |
| 26 AUG 2015 | C0000106546N01B | Salem | District wide on-call pipe rehabilitation / replacement | 1 of 3 | $1,452,845 | Low, 60% under the second |
| 22 JUL 2015 | C0000105712N01 | Lynchburg | Construct rt turn lanes at various locations | 1 of 2 | $426,532 | Low, 39% under the second |
| 22 APR 2015 | C00099416D08 | Salem | Nonebr02-962-128, d608 | 1 of 3 | $1,540,339 | Low, 8.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.