Ramirez Contracting, L.L.C.: VDOT bid record
Ramirez Contracting, L.L.C. submitted 37 bids on Virginia DOT contracts in the data, from 28 JAN 2009 to 26 AUG 2026, and was the low bidder on 13 of them (35%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $15,773,205
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2009 | 1 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2015 | 2 | 1 | 50% |
| 2016 | 6 | 2 | 33% |
| 2017 | 2 | 1 | 50% |
| 2018 | 4 | 1 | 25% |
| 2019 | 6 | 2 | 33% |
| 2020 | 1 | 1 | 100% |
| 2021 | 8 | 2 | 25% |
| 2025 | 2 | 2 | 100% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 14 | 7 | 50% |
| Salem | 11 | 2 | 18% |
| Lynchburg | 11 | 4 | 36% |
| Northern Virginia | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Demo. of pavement flexible | 508SD20-0004 | SY | 23 | 20 (87%) | $5.00 | $9.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 22 | 19 (86%) | $4.00 | $8.00 |
| Siltation control excavation | 303SD20-0029 | CY | 18 | 15 (83%) | $1.00 | $3.50 |
| Temp. silt fence type A | 303SD20-0034 | LF | 26 | 14 (54%) | $4.00 | $3.00 |
| Regular excavation | 303SD20-0001 | CY | 19 | 13 (68%) | $40.00 | $31.00 |
| Sign panel | 701SD20-0001 | SF | 25 | 12 (48%) | $38.00 | $34.00 |
| Temporary sign | 512SD20-0014 | SF | 30 | 11 (37%) | $29.00 | $20.00 |
| Flagger service | 512SD20-0027 | HR | 29 | 11 (38%) | $25.00 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 27 | 11 (41%) | $1.00 | $1.00 |
| Overseeding | 603SD20-0004 | LB | 26 | 11 (42%) | $19.00 | $5.00 |
| Regular seed | 603SD20-0003 | LB | 25 | 11 (44%) | $20.00 | $13.50 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 22 | 11 (50%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| W-L Construction & Paving, Inc. | 9 | 5 of 9 |
| Jones Road & Bridge, Inc. | 5 | 2 of 5 |
| Pearson Construction, Inc. | 4 | 3 of 4 |
| White'S Construction Company, Inc. | 3 | 1 of 3 |
| Gannett Fleming Project Development Corporation | 3 | 2 of 3 |
| Performance Signs, LLC | 3 | 2 of 3 |
| E. C. Pace Company, Inc. | 2 | 2 of 2 |
| D. A. Brown, Inc. | 2 | 2 of 2 |
| Dci/Shires, Inc. | 2 | 0 of 2 |
| Elk Knob, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | C0000124094M01 | Salem | Smart scale - turn lane improvements | 3 of 3 | $1,417,592 | +23% |
| 22 JUL 2026 | C0000119436C01 | Bristol | Smart scale - turn lane improvements | 3 of 4 | $2,900,042 | +8.0% |
| 27 MAY 2026 | C0000119437C01 | Bristol | Smart scale - int. improvements / acceleration lane | 1 of 2 | $888,672 | Low, 7.0% under the second |
| 17 DEC 2025 | C0000119429C01 | Bristol | Smart scale - roundabout | 1 of 4 | $2,968,187 | Low, 1.0% under the second |
| 19 NOV 2025 | C0000119441C01 | Bristol | Smart scale - intersection improvement | 1 of 4 | $3,723,913 | Low, 1.0% under the second |
| 15 DEC 2021 | C0000104774C01 | Bristol | None0649-025-782,c501 | 1 of 2 | $664,859 | Low, 10% under the second |
| 22 SEP 2021 | C0000117211N01 | Salem | Curve delineation safety improvements | 2 of 3 | $658,076 | +19% |
| 28 JUL 2021 | C0000110797C01 | Bristol | Smartscale - intersection improvements at railroad drive | 2 of 3 | $1,570,843 | +15% |
| 23 JUN 2021 | C0000110793C01 | Bristol | Smart scale - intersection improvements | 1 of 1 | $672,314 | Low |
| 23 JUN 2021 | C0000116162C01 | Bristol | Deceleration lane extension | 2 of 2 | $1,090,988 | +32% |
| 28 APR 2021 | C0000110795C01 | Bristol | Smartscale - add lane to rte 107 under i-81 exit 35 | 2 of 3 | $1,095,010 | -4.0% |
| 28 APR 2021 | C0000116165N01 | Bristol | Deceleration lane extension | 2 of 2 | $1,212,495 | +25% |
| 24 FEB 2021 | C0000110203M01 | Lynchburg | Roadway realignment and safety improvements | 2 of 3 | $836,999 | +15% |
| 22 APR 2020 | C0000115494M01 | Lynchburg | Smart scale* - intersection improvements and lighting | 1 of 2 | $616,890 | Low, 13% under the second |
| 24 JUL 2019 | C0000107121N01 | Bristol | Roadway warning signs and chevrons | 1 of 3 | $1,318,104 | Low, 4.0% under the second |
| 26 JUN 2019 | C0000107196N01 | Northern Virginia | Roadway departure - curve countermeasures | 3 of 3 | $742,180 | +101% |
| 24 APR 2019 | C0000109528C01 | Lynchburg | Smartscale - right turn lane at rte 664 | 2 of 3 | $515,681 | +12% |
| 24 APR 2019 | C0000109546M01 | Lynchburg | Smart scale - intersection improvements at rtes. 609 & 630 | 2 of 3 | $1,106,653 | +11% |
| 20 MAR 2019 | C0000109534M01 | Lynchburg | Smart scale - intersection improvements | 2 of 2 | $724,388 | +1.0% |
| 27 FEB 2019 | C0000108165C01 | Lynchburg | Construct sidewalk and install lighting | 1 of 3 | $400,222 | Low, 10% under the second |
| 22 AUG 2018 | C000104950C01 | Lynchburg | Smart scale-intersection improvements & construct turn lanes | 1 of 3 | $1,926,519 | Low, 3.0% under the second |
| 23 MAY 2018 | C0000110127N501 | Salem | Rte 608 - resurface unpaved road | 2 of 2 | $288,015 | +20% |
| 23 MAY 2018 | C000076401N501 | Salem | Pedestrian safety improvements | 3 of 3 | $189,143 | +62% |
| 25 APR 2018 | C0000106803N04B | Salem | Rte 99 landscaping | 3 of 3 | $437,110 | +69% |
| 20 DEC 2017 | C0000087905M01 | Salem | Safety improvements - curve flattening & vertical alignment | 3 of 3 | $1,665,563 | +12% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.