VDOT contract C0000119441C01 bid tabulation

Smart scale - intersection improvement. Let by Virginia DOT on November 19, 2025, Tazewell, Bristol. 4 bids received; low bid $3,723,913 by Ramirez Contracting, L.L.C..

Owner
Virginia DOT
Letting
19 NOV 2025
Pay items
137
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ramirez Contracting, L.L.C.$3,723,913Low
2W-L Construction & Paving, Inc.$3,744,761+1.0%
3Bizzack Construction, LLC$4,041,420+9.0%
4Jones Road & Bridge, Inc.$4,624,328+24%
VDOT contract C0000119441C01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ramirez Contracting, L.L.C.2. W-L Construction & Paving, Inc.3. Bizzack Construction, LLC4. Jones Road & Bridge, Inc.
0001-0010NS const rec docs SWM facility as-bult survey of SWM facilities (105SP20-0002)LS1$8,000.00$4,111.60$11,500$20,493
0001-0020Clearing and grubbing (301SD20-0001)LS1$40,000$62,340$250,000$43,182
0001-0030Bedding matl. aggr. no. 57 (302SD20-0002)TON1,077$65.00$45.00$65.00$76.14
0001-0040Endwall EW-12 (302SD20-0013)EACH5$1,000.00$1,463.00$1,200.00$1,406.61
0001-005015" storm sewer pipe (302SD20-0027)LF100$210.00$266.00$145.49$207.94
0001-006018" pipe (302SD20-0028)LF16$250.00$307.00$105.95$598.39
0001-007018" conc. pipe (302SD20-0030)LF295$300.00$440.00$217.79$621.08
0001-008018" storm sewer pipe (302SD20-0032)LF38$250.00$278.00$231.06$576.82
0001-009015" end section ES-1 or 2 (302SD20-0198)EACH1$2,500.00$952.50$2,200.00$2,142.85
0001-010018" end section ES-1 or 2 (302SD20-0200)EACH2$3,050.00$1,000.00$2,400.00$2,304.10
0001-011018" end section ES-1 (302SD20-0201)EACH2$2,500.00$2,006.00$2,400.00$2,303.80
0001-0120Drop inlet DI-2B,L=12' (302SD20-0245)EACH1$8,000.00$13,275$11,500$10,514
0001-0130Drop inlet DI-5 (302SD20-0446)EACH3$7,000.00$10,615$12,000$7,932.66
0001-0140Manhole MH-1 or 2 (302SD20-0662)LF6.70$1,000.00$1,222.89$1,500.00$1,177.38
0001-0150Frame & cover MH-1 (302SD20-0663)EACH1$1,000.00$1,020.00$1,200.00$1,539.49
0001-0160Pipe spillout PS-2 (302SD20-0668)EACH1$3,900.00$1,082.00$7,500.00$4,278.24
0001-0170Stormwater man.drain.STR.SWM-1 (302SD20-0673)LF5.50$2,000.00$2,380.00$3,536.52$1,555.75
0001-0180NS pipe pipe rehabilitation 30" category A or B (302SX20-0013)LF155$600.00$849.95$415.74$893.96
0001-0190Regular excavation (303SD20-0001)CY2,689$61.00$58.13$86.50$68.07
0001-0200Borrow excavation (303SD20-0007)CY1,489$52.00$55.79$52.00$82.83
0001-0210Embankment (303SD20-0010)CY921$35.00$115.68$105.00$46.34
0001-0220Slope drain (303SD20-0018)EACH3$1,200.00$2,919.34$800.00$4,278.24
0001-0230Check dam rock TY. I (303SD20-0022)EACH10$400.00$984.05$320.00$726.71
0001-0240Check dam rock TY. II (303SD20-0023)EACH35$800.00$515.00$312.00$654.04
0001-0250Check dam sediment retention roll 18" (303SD20-0024)EACH44$200.00$423.00$165.00$290.69
0001-0260Siltation control excavation (303SD20-0029)CY1,068$1.00$37.02$25.00$0.03
0001-0270Inlet protection type A (303SD20-0030)EACH6$500.00$939.00$495.00$697.64
0001-0280Inlet protection type B (303SD20-0031)EACH1$1,000.00$755.00$478.00$671.48
0001-0290Temp. silt fence type B (303SD20-0033)LF1,598$4.00$8.94$7.19$11.18
0001-0300Temp. silt fence type A (303SD20-0034)LF1,134$7.00$9.59$4.99$8.94
0001-0310Storm water man. basin excav. (303SD20-0036)CY524$50.00$69.14$75.00$57.36
0001-0320Utility test pit unpaved (303SX20-0012)EACH6$1,300.00$649.20$800.00$855.65
0001-0330Utility test pit asphalt concrete (303SX20-0013)EACH4$1,800.00$1,190.20$1,100.00$1,453.43
0001-0340Utility test pit portland cement conc (303SX20-0014)EACH2$2,300.00$1,839.40$1,400.00$1,744.10
0001-0350Aggr. matl. no. 21B (308SD20-0007)TON490$60.00$54.11$81.50$79.71
0001-0360Aggr. base matl. TY. I no. 21B (308SD20-0012)TON3,810$60.00$42.26$55.00$56.58
0001-0370Crusher run aggr. no. 25 or 26 (308SX20-0003)TON316.90$69.00$41.03$70.00$77.38
0001-0380Tack coat (310SD20-0001)GAL408$7.50$6.25$3.00$9.08
0001-0390Prime coat (311SD20-0001)GAL2,056$6.00$5.10$3.50$7.41
0001-0400Asphalt concrete TY. SM- 12.5E const (315SD20-0003)TON1,337$175.00$151.60$199.00$220.33
0001-0410Asphalt concrete TY. IM- 19.0E const (315SD20-0006)TON861$168.00$145.45$167.00$211.40
0001-0420Asphalt concrete BM-25.0 (315SD20-0010)TON5,949$129.00$112.05$134.00$162.85
0001-0430Asph.conc.curb backup matl. const (315SD20-0018)TON10$600.00$467.70$300.00$679.76
0001-0440NS saw-cut asph conc full depth saw cut (315SX20-0011)LF2,606$4.00$5.87$10.00$6.00
0001-0450Erosion CTRL. stone CL. I, EC-1 (414SD20-0003)TON32.70$74.00$180.58$73.74$113.08
0001-0460Underdrain UD-4 (501SD20-0004)LF780$32.00$25.00$39.18$27.50
0001-0470Outlet pipe (501SD20-0009)LF152$32.00$29.12$30.00$46.34
0001-0480Energy dissipator EG-1 (502SD20-0001)EACH1$3,000.00$3,278.00$4,300.00$2,782.06
0001-0490Paved ditch PG-5 (502SD20-0004)SY58.70$325.00$308.81$260.00$250.00
0001-0500Paved flume PG-4 (502SD20-0005)SY22.80$425.00$471.41$300.00$325.00
0001-0510Curb, asphalt MC-3B (502SD20-0020)LF253$50.00$35.00$20.00$70.00
0001-0520Concrete class A3 misc. (504SD20-0001)CY6.20$2,000.00$763.17$1,850.00$2,859.96
0001-0530Geotextile drainage fabric (504SD20-0005)SY2,768$12.00$5.12$3.57$7.97
0001-0540Remove EX. guardrail terminal (505SD20-0009)EACH3$800.00$2,841.15$2,000.00$726.71
0001-0550Guardrail GR-MGS1 (505SD20-0011)LF713$41.00$29.21$27.00$50.87
0001-0560Guardrail GR-MGS1, 9' post (505SD20-0013)LF25$53.00$64.92$60.00$65.40
0001-0570Radial guardrail GR-MGS1 (505SD20-0014)LF50$47.00$32.46$30.00$58.14
0001-0580Radial guardrail GR- MGS1, 9' post (505SD20-0016)LF63$58.00$68.17$63.00$72.67
0001-0590Guardrail terminal GR- MGS2 (505SD20-0017)EACH2$4,600.00$5,410.00$5,000.00$5,813.69
0001-0600Guardrail end anchorage GR-MGS3 (505SD20-0018)EACH1$1,725.00$2,705.00$2,500.00$2,180.13
0001-0610Guardrail height transition GR-MGS4 (505SD20-0019)EACH1$1,725.00$2,164.00$2,000.00$2,180.13
0001-0620Cable barricade CR-1 (505SD20-0066)EACH1$2,300.00$3,246.00$3,000.00$7,267.12
0001-0630Remove existing guardrail (505SD20-0073)LF998$7.00$7.15$5.00$8.72
0001-0640Demo. of pavement flexible (508SD20-0004)SY1,479$16.00$12.50$11.50$39.93
0001-0650Flowable backfill (509SD20-0001)CY9.40$700.00$539.84$624.03$557.91
0001-0660NS remove exist. fence remove exist. fence woven wire (510SX20-0016)LF328$18.00$13.71$12.44$14.53
0001-0670NS install sign (510SX20-0070)EACH1$1,000.00$432.80$375.00$1,453.43
0001-0680Allaying dust (511SD20-0001)HR100$5.00$54.54$185.59$29.07
0001-0690Traffic barrier service MB-11A (512SD20-0003)LF3,150$70.00$65.00$56.04$80.00
0001-0700Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007)EACH2$12,000$14,066$13,000$21,801
0001-0710Type 3 barricade 8' (512SD20-0013)EACH5$600.00$518.88$480.82$892.40
0001-0720Temporary sign (512SD20-0014)SF1,100$22.00$23.80$23.30$31.97
0001-0730Truck mounted attenuator (512SD20-0023)HR1,056$20.00$34.10$35.00$20.35
0001-0740Group 2 channelizing devices (512SD20-0024)DAY13,266$1.00$1.33$1.51$1.42
0001-0750Port.changeable mess. sign (512SD20-0025)HR4,032$3.00$9.73$9.00$7.27
0001-0760Electronic arrow board (512SD20-0026)HR1,728$3.00$11.68$5.00$5.81
0001-0770Flagger service (512SD20-0027)HR200$56.00$47.35$60.00$43.60
0001-0780Eradicate linear PVMT MRKG (512SD20-0042)LF1,208$2.00$1.62$1.50$2.18
0001-0790Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061)LF3,815$4.25$4.33$3.50$5.07
0001-0800Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063)LF1,985$6.25$5.41$5.00$7.86
0001-0810Temp. PVMT MRKG TY. D, CL. III, 24" (512SD20-0065)LF24$13.50$21.64$20.00$16.84
0001-0820Portable temporary rumble strip array (512SP20-0001)DAY96$100.00$142.73$184.30$436.03
0001-0830Mobilization (513SD20-0001)LS1$285,000$199,060$225,000$251,677
0001-0840Field office TY.I (514SD20-0001)MO12$3,500.00$5,454.45$7,475.00$2,395.25
0001-0850Flexible pave.planing 0"-2" (515SD20-0004)SY5,095$8.75$7.40$15.60$10.76
0001-0860Construction surveying constr. (517SD20-0001)LS1$70,000$66,435$65,000$47,963
0001-08706" offset exist.pipe (520SD20-0073)LF90$350.00$378.70$175.00$323.97
0001-088010" offset exist. pipe (520SD20-0075)LF62$600.00$649.20$650.00$607.22
0001-08906" sanitary sewer force main (520SD20-0184)LF469$150.00$162.30$140.00$244.65
0001-09002" air release valve & manhole force mai (520SD20-0277)EACH1$5,500.00$5,951.00$9,500.00$14,987
0001-0910Mailbox post, single (521SD20-0001)EACH2$350.00$551.35$300.00$1,162.74
0001-0920NS storm water management manufactured geosynthetic impermeable liner (523SP20-0002)SY413$26.00$50.00$21.81$21.83
0001-0930Topsoil class A (602SD20-0002)CY404$20.00$108.87$18.76$78.65
0001-0940Topsoil class B (602SD20-0004)CY653$60.00$109.87$57.11$247.08
0001-0950Temporary seed (603SD20-0002)LB300$4.00$16.23$15.00$21.80
0001-0960Regular seed (603SD20-0003)LB425$5.00$17.31$16.00$23.25
0001-0970Overseeding (603SD20-0004)LB340$5.00$17.31$16.00$23.25
0001-0980Legume seed (603SD20-0005)LB13$10.00$27.05$25.00$36.33
0001-0990Legume overseeding (603SD20-0006)LB10$10.00$27.05$25.00$36.33
0001-1000Hydraulic erosion control product type 2 (603SD20-0008)SY6,050$0.50$0.92$0.85$1.24
0001-1010Hydraulic erosion control product type 3 (603SD20-0009)SY15,730$0.50$1.08$1.00$1.45
0001-1020Sediment retention roll 18" min (603SD20-0011)LF723$18.00$30.80$11.72$8.03
0001-1030Fertilizer nitrogen - N (603SD20-0014)LB200$5.00$2.16$2.00$2.91
0001-1040Fertilizer phosphorous - P (603SD20-0015)LB140$5.00$2.16$2.00$2.91
0001-1050Fertilizer potassium - K (603SD20-0016)LB140$5.00$2.16$2.00$2.91
0001-1060Lime (603SD20-0017)TON11$300.00$151.48$140.00$203.48
0001-1070Rolled erosion CTRL product EC-2 type 1 (606SD20-0001)SY360$2.00$4.87$4.50$6.54
0001-1080Rolled erosion CTRL product EC-2 type 2 (606SD20-0002)SY57$3.00$5.14$4.75$6.90
0001-1090Rolled erosion CTRL product EC-2 type 4 (606SD20-0004)SY76$12.00$5.73$5.30$7.70
0001-1100Rolled erosion CTRL product EC-3 type 1 (606SD20-0005)SY109$15.00$7.57$7.00$10.17
0001-1110Rolled erosion CTRL product EC-3 type 3 (606SD20-0007)SY379$18.00$8.93$8.25$11.99
0001-1120Gabions (610SD20-0001)CY14.40$500.00$397.18$565.40$503.12
0001-1130Remove existing 1 post sign structure (700SD20-0003)EACH4$485.00$486.90$375.00$545.03
0001-1140Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037)LF10$50.00$48.69$20.00$29.07
0001-1150Conc. found. STP-1, TY. A (700SD20-0038)EACH1$900.00$1,298.40$592.00$860.43
0001-1160Conc. found. PF-8 (700SD20-0068)CY12$3,400.00$2,107.44$1,947.73$46.51
0001-1170Signal mast arm pole MP- 3, TY. D (700SD20-0094)EACH1$23,000$18,750$17,329$25,186
0001-1180Mast arm 49' (700SD20-0100)EACH1$17,000$9,356.90$8,647.78$12,569
0001-119014/7 conductor cable (700SD20-0114)LF200$6.50$6.15$5.68$8.26
0001-1200Junction box JB-S2 (700SD20-0178)EACH2$6,400.00$2,540.46$2,347.93$3,412.54
0001-1210Elect. ser. GRD. electrode 10' (700SD20-0181)EACH1$360.00$202.52$187.17$272.04
0001-1220Bored conduit 3" (700SD20-0192)LF200$107.00$56.49$52.21$75.88
0001-1230Conduit PVC 3" (700SD20-0195)LF50$8.50$9.46$8.74$12.70
0001-1240Trench excavation eci-1 (700SD20-0197)LF50$14.00$9.47$8.75$12.72
0001-1250Test bore (700SD20-0199)EACH1$5,900.00$7,105.58$6,567.08$9,544.74
0001-1260Luminaire arm 18' (700SD20-0225)EACH1$5,000.00$2,785.79$2,574.67$3,742.08
0001-1270NS traffic signalization modify existing controller (700SX20-0008)LS1$10,000$8,972.07$1,260.70$1,832.34
0001-1280Sign panel (701SD20-0001)SF20$60.00$72.00$66.54$96.71
0001-1290Traf. sig. head sect. 12" HVS backplate (703SD20-0007)EACH10$700.00$514.23$475.26$690.75
0001-1300Video detection camera (703SD20-0014)EACH1$6,000.00$16,653$15,391$22,370
0001-1310Video detection cable (703SD20-0015)LF150$8.00$5.50$5.08$7.38
0001-1320Hanger assembly SM-3, one way (703SD20-0034)EACH3$1,260.00$656.76$606.99$882.22
0001-1330Type B class I PVMT line MRKG 4" (704SD20-0006)LF7,100$1.75$1.62$1.50$1.95
0001-1340Type B class I PVMT line MRKG 24" (704SD20-0010)LF150$13.00$16.23$15.00$15.20
0001-1350Inlaid pavement marker asphalt (704SD20-0032)EACH30$250.00$81.15$75.00$314.92
0001-1360PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047)EACH10$186.00$162.30$150.00$233.85
0001-1370DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050)EACH1$250.00$324.60$300.00$312.64
VDOT contract C0000119441C01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy