Jones Road & Bridge, Inc.: VDOT bid record
Jones Road & Bridge, Inc. submitted 51 bids on Virginia DOT contracts in the data, from 22 JAN 2020 to 28 OCT 2026, and was the low bidder on 14 of them (27%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $24,676,503
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 2 | 18% |
| 2021 | 13 | 6 | 46% |
| 2025 | 5 | 3 | 60% |
| 2026 | 22 | 3 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 27 | 9 | 33% |
| Bristol | 22 | 4 | 18% |
| Lynchburg | 1 | 0 | 0% |
| Staunton | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Flagger service | 512SD20-0027 | HR | 40 | 25 (63%) | $34.00 | $20.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 39 | 24 (62%) | $6.00 | $8.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 38 | 23 (61%) | $7.50 | $9.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 43 | 16 (37%) | $1.32 | $1.00 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 27 | 16 (59%) | $96.00 | $54.00 |
| Warning light TY. B | 512SD20-0029 | DAY | 18 | 16 (89%) | $1.00 | $2.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 34 | 15 (44%) | $47.50 | $26.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 32 | 15 (47%) | $6.00 | $5.00 |
| Allaying dust | 511SD20-0001 | HR | 25 | 15 (60%) | $29.79 | $22.00 |
| Manhole MH-1 or 2 | 302SD20-0662 | LF | 25 | 15 (60%) | $1,000.00 | $614.55 |
| Sign panel | 701SD20-0001 | SF | 45 | 13 (29%) | $40.00 | $34.00 |
| Regular seed | 603SD20-0003 | LB | 43 | 13 (30%) | $20.00 | $13.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Allegheny Construction Company, Inc. | 14 | 7 of 14 |
| King General Contractors, Inc. | 11 | 6 of 11 |
| W-L Construction & Paving, Inc. | 10 | 6 of 10 |
| Crossroads Bridge Inc | 9 | 4 of 9 |
| Caton Construction Group, Inc. | 7 | 2 of 7 |
| Ramirez Contracting, L.L.C. | 5 | 3 of 5 |
| E. C. Pace Company, Inc. | 5 | 2 of 5 |
| Elk Knob, Inc. | 4 | 2 of 4 |
| Glass Machinery and Excavation, Inc. | 4 | 3 of 4 |
| Ken Construction Co., Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000127207B70 | Salem | Bridge rehab | 4 of 4 | $855,255 | +86% |
| 26 AUG 2026 | C0000124094M01 | Salem | Smart scale - turn lane improvements | 1 of 3 | $1,149,519 | Low, 14% under the second |
| 26 AUG 2026 | C0000124095M01 | Salem | Smart scale - road widening and improvements | 2 of 4 | $4,491,411 | +8.0% |
| 22 JUL 2026 | C0000120697C01 | Salem | Intersection improvements / pedestrian accommodations | 3 of 3 | $6,321,593 | +30% |
| 22 JUL 2026 | C0000121138B52 | Bristol | Sgr - bridge replacment over n.f. clinch river | 5 of 5 | $1,887,921 | +51% |
| 22 JUL 2026 | C0000119436C01 | Bristol | Smart scale - turn lane improvements | 2 of 4 | $2,799,579 | +5.0% |
| 24 JUN 2026 | C0000115470C01 | Bristol | Smart scale - safety improvements / lane additions | 2 of 2 | $6,431,508 | +4.0% |
| 24 JUN 2026 | C0000117111B62 | Bristol | Sgr - bridge replacement | 3 of 3 | $1,953,410 | +20% |
| 27 MAY 2026 | C0000119458C01 | Salem | Smart scale - roundabout | 5 of 6 | $11,362,715 | +46% |
| 27 MAY 2026 | C0000119437C01 | Bristol | Smart scale - int. improvements / acceleration lane | 2 of 2 | $948,957 | +7.0% |
| 27 MAY 2026 | C0000115456C01 | Salem | Smart scale - int. improvements / acceleration lane | 4 of 4 | $5,910,603 | +73% |
| 22 APR 2026 | C0000117081B10 | Bristol | Sgr - bridge rehabilitation | 3 of 5 | $988,464 | +82% |
| 22 APR 2026 | C0000120999D01 | Salem | Culvert rehabilitation | 1 of 4 | $1,148,259 | Low, 6.0% under the second |
| 25 MAR 2026 | C0000122877C01 | Bristol | Safety improvements | 2 of 3 | $1,684,828 | +13% |
| 25 MAR 2026 | C0000121244B67 | Bristol | Bridge rehabilitation | 5 of 7 | $6,565,125 | +40% |
| 25 MAR 2026 | C0000126858N01 | Salem | On-call ada compliance curb ramp improvements | 4 of 6 | $1,015,715 | +45% |
| 25 MAR 2026 | C0000128438N01 | Salem | Rural rustic road improvements | 4 of 4 | $1,182,954 | +13% |
| 25 FEB 2026 | C0000128511B24 | Salem | Bridge rehabilitation - beam replacement | 1 of 4 | $521,044 | Low, 25% under the second |
| 25 FEB 2026 | C0000119431C01B | Bristol | Smart scale - road realignment | 2 of 2 | $1,701,175 | +15% |
| 04 FEB 2026 | C0000119451M01 | Salem | Smart scale - intersection improvements | 3 of 3 | $5,950,816 | +32% |
| 04 FEB 2026 | C0000120758M01 | Salem | Smart scale - intersection improvements | 2 of 3 | $3,940,402 | +23% |
| 04 FEB 2026 | C0000123319B54 | Bristol | Sgr - bridge superstructure replacement | 2 of 8 | $2,782,743 | +1.0% |
| 17 DEC 2025 | C0000119442C01 | Bristol | Smart scale - roundabout | 1 of 2 | $4,142,277 | Low, 9.0% under the second |
| 17 DEC 2025 | C0000119429C01 | Bristol | Smart scale - roundabout | 3 of 4 | $3,678,551 | +24% |
| 19 NOV 2025 | C0000119441C01 | Bristol | Smart scale - intersection improvement | 4 of 4 | $4,624,328 | +24% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.