VDOT contract C0000115456C01 bid tabulation
Smart scale - int. improvements / acceleration lane. Let by Virginia DOT on May 27, 2026, Franklin, Salem. 4 bids received; low bid $3,417,885 by Branch Civil, Inc..
- Owner
- Virginia DOT
- Letting
- 27 MAY 2026
- Pay items
- 89
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Branch Civil, Inc. | $3,417,885 | Low |
| 2 | Haymes Brothers, Inc. | $3,871,191 | +13% |
| 3 | F & B Contractors, LTD. | $4,640,342 | +36% |
| 4 | Jones Road & Bridge, Inc. | $5,910,603 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Branch Civil, Inc. | 2. Haymes Brothers, Inc. | 3. F & B Contractors, LTD. | 4. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $4,400.00 | $57,150 | $11,900 | $50,000 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 15 | $665.00 | $770.00 | $1,150.00 | $1,000.00 |
| 0001-0030 | Clearing and grubbing (301SD20-0001) | LS | 1 | $154,926 | $200,000 | $458,170 | $200,000 |
| 0001-0040 | 18" conc. pipe (302SD20-0030) | LF | 1,219 | $118.00 | $200.00 | $215.60 | $500.00 |
| 0001-0050 | 24" jacked & bored pipe (302SD20-0038) | LF | 70 | $2,685.00 | $1,800.00 | $2,516.20 | $500.00 |
| 0001-0060 | 24" conc. pipe (302SD20-0039) | LF | 355 | $157.00 | $225.00 | $295.80 | $550.00 |
| 0001-0070 | 24" storm sewer pipe (302SD20-0041) | LF | 656 | $161.00 | $225.00 | $296.40 | $525.00 |
| 0001-0080 | 30" storm sewer pipe (302SD20-0051) | LF | 53 | $234.00 | $300.00 | $342.10 | $600.00 |
| 0001-0090 | Drop inlet DI-2A (302SD20-0239) | EACH | 1 | $8,215.00 | $5,000.00 | $11,844 | $15,000 |
| 0001-0100 | Drop inlet DI-3A (302SD20-0309) | EACH | 1 | $6,563.00 | $5,000.00 | $12,122 | $15,000 |
| 0001-0110 | Drop inlet DI-3B,L=8' (302SD20-0313) | EACH | 9 | $8,225.00 | $5,000.00 | $12,683 | $15,000 |
| 0001-0120 | Drop inlet DI-3C,L=12' (302SD20-0332) | EACH | 1 | $10,268 | $5,000.00 | $14,930 | $15,000 |
| 0001-0130 | Drop inlet DI-5 (302SD20-0446) | EACH | 6 | $8,302.00 | $5,000.00 | $14,830 | $15,000 |
| 0001-0140 | Manhole MH-1 or 2 (302SD20-0662) | LF | 3 | $6,718.00 | $5,000.00 | $2,075.60 | $2,000.00 |
| 0001-0150 | Regular excavation (303SD20-0001) | CY | 2,216 | $82.50 | $300.00 | $155.50 | $150.00 |
| 0001-0160 | Borrow excavation (303SD20-0007) | CY | 1,276 | $16.75 | $30.00 | $79.20 | $140.00 |
| 0001-0170 | Geotextile embankment stab. (303SD20-0013) | SY | 204.20 | $8.00 | $200.00 | $13.20 | $10.00 |
| 0001-0180 | Check dam rock TY. II (303SD20-0023) | EACH | 18 | $780.00 | $1,200.00 | $720.00 | $1,500.00 |
| 0001-0190 | Siltation control excavation (303SD20-0029) | CY | 279 | $29.50 | $15.00 | $8.00 | $1.00 |
| 0001-0200 | Inlet protection type A (303SD20-0030) | EACH | 12 | $216.00 | $1,000.00 | $400.00 | $1,500.00 |
| 0001-0210 | Inlet protection type B (303SD20-0031) | EACH | 10 | $235.00 | $1,000.00 | $580.00 | $1,500.00 |
| 0001-0220 | Temp. silt fence type A (303SD20-0034) | LF | 315 | $6.00 | $20.00 | $7.20 | $12.00 |
| 0001-0230 | Aggregate material no.3 (303SP20-0001) | TON | 643 | $54.00 | $110.00 | $76.00 | $100.00 |
| 0001-0240 | Aggr. matl. no. 1 (305SD20-0010) | TON | 94 | $47.75 | $100.00 | $76.00 | $100.00 |
| 0001-0250 | Lime (306SD20-0001) | TON | 3.50 | $1,195.00 | $150.00 | $192.00 | $550.00 |
| 0001-0260 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 844 | $68.75 | $125.00 | $81.20 | $100.00 |
| 0001-0270 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 306 | $303.00 | $286.00 | $326.50 | $340.00 |
| 0001-0280 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 892 | $227.00 | $216.70 | $247.75 | $500.00 |
| 0001-0290 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 830 | $241.00 | $253.00 | $259.00 | $325.00 |
| 0001-0300 | Saw-cut asphalt concrete (full depth) (315SD20-0104) | LF | 3,385 | $12.00 | $15.00 | $9.00 | $10.00 |
| 0001-0310 | Dry riprap CL.I 26" (414SD20-0012) | TON | 318 | $80.25 | $150.00 | $96.00 | $110.00 |
| 0001-0320 | Paved ditch PG-2A (502SD20-0003) | SY | 319 | $300.00 | $275.00 | $364.60 | $400.00 |
| 0001-0330 | Sign island SI-2 (502SD20-0051) | SY | 24 | $352.00 | $440.00 | $394.20 | $400.00 |
| 0001-0340 | Median strip MS-1A (502SD20-0056) | SY | 1,137 | $292.00 | $253.00 | $363.20 | $400.00 |
| 0001-0350 | Concrete class A3 misc. (504SD20-0001) | CY | 3.40 | $2,278.00 | $200.00 | $1,088.00 | $4,000.00 |
| 0001-0360 | Guardrail GR-MGS1 (505SD20-0011) | LF | 62.50 | $50.00 | $46.20 | $54.20 | $60.00 |
| 0001-0370 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 400 | $71.75 | $66.00 | $60.50 | $65.00 |
| 0001-0380 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 25 | $83.75 | $77.00 | $66.70 | $80.00 |
| 0001-0390 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 2 | $7,173.00 | $6,600.00 | $5,004.20 | $8,000.00 |
| 0001-0400 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 2 | $3,586.00 | $3,300.00 | $1,879.20 | $3,000.00 |
| 0001-0410 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 2 | $4,184.00 | $3,850.00 | $2,191.70 | $3,200.00 |
| 0001-0420 | Remove existing guardrail (505SD20-0073) | LF | 250 | $8.50 | $7.70 | $10.90 | $10.00 |
| 0001-0430 | High visibility fence, 4 feet (507SD20-0027) | LF | 122 | $7.25 | $50.00 | $5.00 | $100.00 |
| 0001-0440 | Demo. of pavement flexible (508SD20-0004) | SY | 998 | $10.50 | $50.00 | $63.70 | $50.00 |
| 0001-0450 | Flowable backfill (509SD20-0001) | CY | 257 | $335.00 | $200.00 | $454.50 | $500.00 |
| 0001-0460 | NS relocate - relocate existing sign and structure (510SX20-0042) | EACH | 1 | $5,977.00 | $1,500.00 | $4,225.00 | $5,000.00 |
| 0001-0470 | Allaying dust (511SD20-0001) | HR | 80 | $96.00 | $20.00 | $65.00 | $80.00 |
| 0001-0480 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $515.00 | $3,000.00 | $409.20 | $1,000.00 |
| 0001-0490 | Temporary sign (512SD20-0014) | SF | 1,382 | $20.25 | $25.00 | $38.50 | $55.00 |
| 0001-0500 | Truck mounted attenuator (512SD20-0023) | HR | 4,548 | $38.00 | $15.00 | $75.00 | $100.00 |
| 0001-0510 | Group 2 channelizing devices (512SD20-0024) | DAY | 27,385 | $3.10 | $2.20 | $1.50 | $5.00 |
| 0001-0520 | Port.changeable mess. sign (512SD20-0025) | HR | 2,328 | $4.25 | $20.00 | $16.50 | $9.00 |
| 0001-0530 | Electronic arrow board (512SD20-0026) | HR | 4,548 | $13.25 | $20.00 | $6.75 | $6.00 |
| 0001-0540 | Flagger service (512SD20-0027) | HR | 528 | $77.00 | $40.00 | $65.00 | $40.00 |
| 0001-0550 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 5,002 | $5.25 | $3.30 | $3.90 | $5.00 |
| 0001-0560 | NS police patrol uniformed flaggers (512SX20-0040) | HR | 100 | $120.00 | $100.00 | $100.00 | $120.00 |
| 0001-0570 | Mobilization (513SD20-0001) | LS | 1 | $164,656 | $150,000 | $262,068 | $300,000 |
| 0001-0580 | Field office TY.I (514SD20-0001) | MO | 15 | $7,720.00 | $1,500.00 | $3,819.20 | $6,000.00 |
| 0001-0590 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 4,630 | $12.00 | $10.95 | $12.80 | $30.00 |
| 0001-0600 | Flexible pave. planing above 2"-4" (515SD20-0005) | SY | 268 | $64.00 | $58.30 | $66.30 | $100.00 |
| 0001-0610 | Construction surveying constr. (517SD20-0001) | LS | 1 | $116,740 | $49,500 | $69,893 | $100,000 |
| 0001-0620 | Manhole frame & cover F & C-1 (520SD20-0274) | EACH | 1 | $989.00 | $5,000.00 | $1,250.00 | $2,000.00 |
| 0001-0630 | NS topsoil 3" topsoil class B (602SX20-0005) | ACRE | 0.26 | $100,305 | $20,000 | $34,383 | $50,000 |
| 0001-0640 | NS topsoil 3" topsoil type A (602SX20-0005) | ACRE | 0.52 | $10,035 | $20,000 | $33,006 | $50,000 |
| 0001-0650 | Temporary seed (603SD20-0002) | LB | 84 | $7.25 | $6.60 | $24.20 | $25.00 |
| 0001-0660 | Regular seed (603SD20-0003) | LB | 140 | $7.25 | $6.60 | $51.00 | $25.00 |
| 0001-0670 | Overseeding (603SD20-0004) | LB | 112 | $7.25 | $6.60 | $25.50 | $25.00 |
| 0001-0680 | Legume seed (603SD20-0005) | LB | 7 | $37.00 | $34.10 | $35.50 | $50.00 |
| 0001-0690 | Legume overseeding (603SD20-0006) | LB | 5 | $37.00 | $34.10 | $35.50 | $50.00 |
| 0001-0700 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 1,452 | $1.25 | $1.16 | $2.10 | $5.00 |
| 0001-0710 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 5,760 | $1.35 | $1.27 | $2.30 | $6.00 |
| 0001-0720 | Sediment retention roll 18" min (603SD20-0011) | LF | 53 | $16.75 | $15.40 | $43.60 | $100.00 |
| 0001-0730 | Fertilizer nitrogen - N (603SD20-0014) | LB | 58 | $7.25 | $6.60 | $7.00 | $6.00 |
| 0001-0740 | Fertilizer phosphorous - P (603SD20-0015) | LB | 43 | $7.25 | $6.60 | $7.00 | $6.00 |
| 0001-0750 | Fertilizer potassium - K (603SD20-0016) | LB | 43 | $7.25 | $6.60 | $7.00 | $6.00 |
| 0001-0760 | Mowing (608SD20-0001) | HR | 40 | $209.00 | $192.50 | $65.00 | $100.00 |
| 0001-0770 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 3 | $897.00 | $236.50 | $475.50 | $800.00 |
| 0001-0780 | Remove existing 2 post sign structure (700SD20-0004) | EACH | 1 | $1,195.00 | $320.10 | $946.70 | $1,600.00 |
| 0001-0790 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 74 | $47.75 | $27.50 | $25.30 | $40.00 |
| 0001-0800 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 42 | $59.75 | $35.50 | $30.50 | $50.00 |
| 0001-0810 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 62 | $53.75 | $30.00 | $27.90 | $40.00 |
| 0001-0820 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 7 | $1,315.00 | $745.80 | $681.70 | $1,300.00 |
| 0001-0830 | Concrete foundation STP-2, type B (700SD20-0202) | EACH | 8 | $1,435.00 | $1,375.00 | $1,093.00 | $1,900.00 |
| 0001-0840 | Sign panel (701SD20-0001) | SF | 208.90 | $48.00 | $45.62 | $35.90 | $80.00 |
| 0001-0850 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 5,021 | $4.50 | $2.75 | $4.10 | $6.00 |
| 0001-0860 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 125 | $52.50 | $33.00 | $38.50 | $90.00 |
| 0001-0870 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 58 | $201.00 | $126.50 | $147.80 | $300.00 |
| 0001-0880 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 5 | $701.00 | $440.00 | $504.20 | $900.00 |
| 0001-0890 | Symb MRKG lane reduction arr TY B CL II (704SD20-0060) | EACH | 3 | $1,752.00 | $1,100.00 | $1,254.25 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of May 27, 2026. Compiled by Mirage Metrics.