F & B Contractors, LTD.: VDOT bid record

F & B Contractors, LTD. submitted 17 bids on Virginia DOT contracts in the data, from 27 FEB 2013 to 23 SEP 2026, and was the low bidder on 5 of them (29%). When it was not low, its total sat a median +12% above the low bid.

Owner
Virginia DOT
Low bid volume
$5,914,182
Latest bid
23 SEP 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

17Bids
5Low bids
29Win rate, percent
+12%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20132150%
2014200%
2016100%
201811100%
20213267%
2025200%
20266117%
F & B Contractors, LTD., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Salem14429%
Lynchburg2150%
Staunton100%
F & B Contractors, LTD., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Group 2 channelizing devices512SD20-0024DAY1710 (59%)$1.50$1.00
Check dam rock TY. II303SD20-0023EACH119 (82%)$350.00$250.00
Temp. silt fence type A303SD20-0034LF178 (47%)$3.50$3.00
Aggr. base matl. TY. I no. 21B308SD20-0012TON158 (53%)$50.00$26.00
Regular seed603SD20-0003LB185 (28%)$23.30$13.50
Sign panel701SD20-0001SF125 (42%)$45.00$34.00
NS saw-cut asph conc full depth315SX20-0011LF75 (71%)$7.50$5.00
Inlet protection type A303SD20-0030EACH75 (71%)$400.00$300.00
Type 3 barricade 8'512SD20-0013EACH75 (71%)$409.20$591.00
Temporary sign512SD20-0014SF174 (24%)$32.00$20.00
Siltation control excavation303SD20-0029CY154 (27%)$12.40$3.50
Flagger service512SD20-0027HR144 (29%)$29.00$20.00
F & B Contractors, LTD., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Haymes Brothers, Inc.55 of 5
Jones Road & Bridge, Inc.31 of 3
Allegheny Construction Company, Inc.33 of 3
Hammond-Mitchell, Inc.20 of 2
W. C. English, Incorporated20 of 2
L.A.S Trucking & Construction, Inc.21 of 2
Ramirez Contracting, L.L.C.21 of 2
Pearson Construction, Inc.20 of 2
Stonewall Bridge, Inc.10 of 1
Crossroads Bridge Inc11 of 1
F & B Contractors, LTD., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 SEP 2026C0000124001C01BStauntonSmart scale - pedestrian improvements3 of 4$687,870+10%
24 JUN 2026C0000123944C01LynchburgSmart scale - roadway improvements1 of 2$2,863,260Low, 33% under the second
24 JUN 2026C0000119467C01SalemSmart scale - road improvements/ lanes addition2 of 2$2,489,451+2.0%
27 MAY 2026C0000115456C01SalemSmart scale - int. improvements / acceleration lane3 of 4$4,640,342+36%
22 APR 2026C0000119165C01LynchburgSmart scale- intersection improvement2 of 2$2,248,929+9.0%
04 FEB 2026C0000119457C01SalemSmart scale - intersection improvements / lanes addition3 of 3$1,230,956+23%
17 DEC 2025C0000119452C50SalemSmart scale - intersection improvements/ lane addition4 of 5$3,250,000+31%
22 OCT 2025C0000125954C01SalemParking lot improvements3 of 5$819,138+11%
27 OCT 2021C0000106701N01SalemIntersection and safety improvements1 of 3$1,587,159Low, 18% under the second
22 SEP 2021C0000110621D16SalemStp-br02(451)0619-009-584, d6161 of 3$1,187,778Low, 1.0% under the second
22 SEP 2021C0000118341D38SalemSgr - culvert replacement3 of 3$1,099,860+15%
23 MAY 2018C000076401N501SalemPedestrian safety improvements1 of 3$116,834Low, 12% under the second
26 OCT 2016C000093277M01SalemConstruct right turn lane at rtes. 122/616 intersection3 of 3$398,393+25%
26 FEB 2014C00098460N01SalemRural rustic - grade, drain & surface treat2 of 3$199,703+7.0%
26 FEB 2014C00103189N01SalemRural rustic, grade, drain & surfact treat2 of 3$156,4060.0%
22 MAY 2013C00103930N01SalemArra salem district culvert replacements2 of 2$198,549+13%
27 FEB 2013C00103033N01SalemArra salem district culvert replacements1 of 3$159,151Low, 25% under the second
F & B Contractors, LTD.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy