Hammond-Mitchell, Inc.: VDOT bid record
Hammond-Mitchell, Inc. submitted 50 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 24 JUN 2026, and was the low bidder on 12 of them (24%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $14,443,443
- Latest bid
- 24 JUN 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 12 | 3 | 25% |
| 2003 | 5 | 1 | 20% |
| 2004 | 5 | 1 | 20% |
| 2005 | 4 | 2 | 50% |
| 2006 | 2 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 1 | 0 | 0% |
| 2011 | 2 | 0 | 0% |
| 2013 | 2 | 1 | 50% |
| 2014 | 1 | 1 | 100% |
| 2015 | 1 | 1 | 100% |
| 2016 | 4 | 1 | 25% |
| 2017 | 2 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 2 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 40 | 12 | 30% |
| Salem | 10 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Group 2 channelizing devices | 512SD20-0024 | DAY | 46 | 28 (61%) | $0.63 | $1.00 |
| Siltation control excavation | 303SD20-0029 | CY | 21 | 21 (100%) | $1.00 | $3.50 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 22 | 17 (77%) | $5,500.00 | $2,000.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 41 | 15 (37%) | $3.00 | $3.00 |
| Regular seed | 603SD20-0003 | LB | 42 | 13 (31%) | $14.03 | $13.50 |
| Lime | 603SD20-0017 | TON | 42 | 12 (29%) | $200.00 | $200.00 |
| Flagger service | 512SD20-0027 | HR | 32 | 12 (38%) | $16.50 | $20.00 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 23 | 11 (48%) | $200.00 | $250.00 |
| Overseeding | 603SD20-0004 | LB | 34 | 8 (24%) | $3.60 | $5.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 35 | 7 (20%) | $22.80 | $26.00 |
| Fertilizer(15-30-15) | 27215 | TON | 26 | 7 (27%) | $525.00 | $550.00 |
| Asphalt concrete base | 10612 | TON | 14 | 7 (50%) | $75.00 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Plecker Construction Company | 10 | 7 of 10 |
| Allegheny Construction Company, Inc. | 8 | 3 of 8 |
| Fairfield-Echols, LLC | 7 | 5 of 7 |
| F. Clayton Plecker & Sons, Inc. | 7 | 3 of 7 |
| A. R. Coffey and Sons, Inc. | 6 | 5 of 6 |
| Branch Highways, Inc. | 5 | 5 of 5 |
| Burleigh Construction Co., Inc. | 5 | 1 of 5 |
| Fort Chiswell Construction Corporation | 5 | 3 of 5 |
| Orders Construction Company, Inc. | 4 | 2 of 4 |
| DLB, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUN 2026 | C0000112964B03 | Staunton | Sgr - bridge replacement | 1 of 5 | $1,597,243 | Low, 23% under the second |
| 22 OCT 2025 | C0000125954C01 | Salem | Parking lot improvements | 4 of 5 | $833,595 | +13% |
| 22 SEP 2021 | C0000110621D16 | Salem | Stp-br02(451)0619-009-584, d616 | 3 of 3 | $1,257,420 | +6.0% |
| 16 DEC 2020 | C0000090178B02 | Staunton | Sgr - bridge replacment over eidson creek | 2 of 3 | $1,162,841 | +19% |
| 18 NOV 2020 | C000111049M501 | Staunton | Smart scale - waynesboro towne center park & ride | 3 of 3 | $1,172,545 | +15% |
| 25 SEP 2019 | C0000098957B35 | Staunton | Bridge replacement over karnes creek | 2 of 3 | $3,335,702 | +29% |
| 24 JUL 2019 | C0000080486N01 | Staunton | Construct access road and roadway improvements | 2 of 3 | $593,882 | +7.0% |
| 28 FEB 2018 | C000068089C01B | Staunton | Sidewalk, curb and gutter additions | 2 of 3 | $1,998,345 | +1.0% |
| 15 NOV 2017 | C0000090183M01 | Staunton | Route 867 over pleasant run bridg replacement | 3 of 3 | $1,842,370 | +3.0% |
| 22 FEB 2017 | C0000108057C01B | Staunton | Signal & turn lane improvements at i-64 exit 21 & rte. 1101 | 2 of 3 | $3,861,378 | +6.0% |
| 21 DEC 2016 | C000097113B19 | Staunton | Route 687 (jackson river turnpike) over cascades creek | 2 of 3 | $1,601,901 | +15% |
| 29 AUG 2016 | C000109788N01 | Staunton | I-64 emergency paved channel repair | 1 of 3 | $4,696,952 | Low, 74% under the second |
| 24 FEB 2016 | C0000077423B06 | Staunton | Bridge over little calfpasture and approaches | 2 of 3 | $757,266 | +11% |
| 03 FEB 2016 | C000089071B82 | Staunton | Route 708 - bridge replacement - gilmore's mill | 2 of 3 | $795,393 | +7.0% |
| 22 APR 2015 | C00090189D08 | Staunton | Rte.159 over crow run, box culvert replacement of bridge | 1 of 3 | $1,269,935 | Low, 8.0% under the second |
| 19 NOV 2014 | C00082764B77 | Staunton | Proposed bridge and approaches over walker creek | 1 of 3 | $813,860 | Low, 1.0% under the second |
| 18 DEC 2013 | C00088819B18 | Staunton | Bridge/approaches over cowardin run | 2 of 3 | $899,379 | +2.0% |
| 20 NOV 2013 | C00098285C01 | Staunton | 8 x 8 box culvert rehab. | 1 of 3 | $1,539,710 | Low, 1.0% under the second |
| 27 APR 2011 | C00094914N01 | Staunton | Improve rt turn flare into stuarts draft school complex | 3 of 3 | $111,162 | +49% |
| 27 APR 2011 | C00096468D01 | Salem | Stp-br02(305)(nfo)br02-962-081, d601 | 3 of 3 | $726,320 | +16% |
| 25 FEB 2009 | C00008741M01 | Staunton | Bridge and approaches christians creek | 2 of 3 | $798,359 | +3.0% |
| 25 JUN 2008 | C00085469N01B | Salem | Grade, drain, asp. pave.; decel. la. | 3 of 3 | $983,428 | +27% |
| 22 NOV 2006 | C00062149NO1 | Staunton | Oc-081-8(010) / (nfo)0011-081-111, n501 | 2 of 3 | $302,326 | +22% |
| 22 NOV 2006 | C00057721M01 | Staunton | 1.50 mi. gr., dr.,asp. pave. & bridge over thorny br. & appr | 2 of 3 | $758,994 | +17% |
| 24 AUG 2005 | C00052945M01 | Staunton | Approaches and replace bridge with pipe at unnamed stream | 1 of 3 | $395,644 | Low, 8.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.