Plecker Construction Company: VDOT bid record
Plecker Construction Company submitted 45 bids on Virginia DOT contracts in the data, from 23 APR 2002 to 24 JUN 2026, and was the low bidder on 23 of them (51%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $12,074,043
- Latest bid
- 24 JUN 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 10 | 3 | 30% |
| 2003 | 5 | 3 | 60% |
| 2004 | 4 | 2 | 50% |
| 2005 | 2 | 1 | 50% |
| 2006 | 4 | 1 | 25% |
| 2007 | 3 | 1 | 33% |
| 2010 | 4 | 2 | 50% |
| 2011 | 3 | 2 | 67% |
| 2012 | 5 | 5 | 100% |
| 2013 | 1 | 1 | 100% |
| 2014 | 1 | 0 | 0% |
| 2016 | 1 | 1 | 100% |
| 2020 | 1 | 1 | 100% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 39 | 20 | 51% |
| Culpeper | 4 | 2 | 50% |
| Lynchburg | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Lime | 603SD20-0017 | TON | 39 | 27 (69%) | $100.00 | $200.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 39 | 19 (49%) | $1.00 | $1.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 35 | 19 (54%) | $16.39 | $26.00 |
| Borrow excavation | 305SD20-0001 | CY | 23 | 13 (57%) | $10.00 | $20.00 |
| 15" pipe | 1150 | LF | 22 | 11 (50%) | $25.00 | $35.00 |
| Overseeding | 603SD20-0004 | LB | 20 | 11 (55%) | $3.25 | $5.00 |
| Flagger service | 512SD20-0027 | HR | 35 | 10 (29%) | $17.00 | $20.00 |
| Temp. filter barrier | 27506 | LF | 31 | 10 (32%) | $3.00 | $2.50 |
| Erosion CTRL. stone CL. I, EC-1 | 414SD20-0003 | TON | 20 | 10 (50%) | $39.00 | $54.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 12 | 10 (83%) | $3.80 | $9.00 |
| Regular seed | 603SD20-0003 | LB | 39 | 9 (23%) | $12.00 | $13.50 |
| Temp. silt fence type A | 303SD20-0034 | LF | 31 | 9 (29%) | $3.00 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| F. Clayton Plecker & Sons, Inc. | 19 | 8 of 19 |
| Hammond-Mitchell, Inc. | 10 | 3 of 10 |
| A. R. Coffey and Sons, Inc. | 7 | 3 of 7 |
| General Excavation, Inc. | 6 | 3 of 6 |
| Haley, Chisholm & Morris, Incorporated | 6 | 1 of 6 |
| A & J Development and Excavation, Inc. | 3 | 1 of 3 |
| DLB, Inc. | 3 | 0 of 3 |
| Fielder'S Choice Enterprises, Inc. | 3 | 2 of 3 |
| Fort Chiswell Construction Corporation | 2 | 1 of 2 |
| Robertson-Fowler Company | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUN 2026 | C0000115715C01 | Staunton | Smart scale - roundabout / intersection imp | 2 of 2 | $4,045,656 | +5.0% |
| 18 NOV 2020 | C000111049M501 | Staunton | Smart scale - waynesboro towne center park & ride | 1 of 3 | $1,020,026 | Low, 2.0% under the second |
| 21 DEC 2016 | C0000094879M01 | Staunton | Reconstruct 0.35 mi of rte 727 to fix curve | 1 of 3 | $498,178 | Low, 18% under the second |
| 27 AUG 2014 | C00093347M01 | Staunton | Add turn lanes rte 608 and648 | 3 of 3 | $1,090,301 | +40% |
| 23 JAN 2013 | C00015311N01 | Culpeper | Rte. 634 box culver over swift run (upper crossing) | 1 of 3 | $299,889 | Low, 12% under the second |
| 27 JUN 2012 | C00094844N01 | Staunton | Construct third lane and improve drainage | 1 of 3 | $462,872 | Low, 8.0% under the second |
| 28 MAR 2012 | C00077422M01 | Staunton | Bridge replacement over linville creek | 1 of 3 | $2,879,933 | Low, 4.0% under the second |
| 28 MAR 2012 | C00094911N01 | Staunton | Rte 699 - rural rustic | 1 of 3 | $577,963 | Low, 4.0% under the second |
| 28 MAR 2012 | C00096250N01 | Staunton | Rte 688 - rural rustic road | 1 of 3 | $566,667 | Low, 6.0% under the second |
| 25 JAN 2012 | C0082274N01 | Culpeper | Install box and rebuild approaches | 1 of 3 | $244,923 | Low, 0.0% under the second |
| 22 JUN 2011 | C00050075M01 | Staunton | Realign rt 640 at rt 250 to improve sight distance | 3 of 3 | $1,569,227 | +19% |
| 27 APR 2011 | C00094914N01 | Staunton | Improve rt turn flare into stuarts draft school complex | 1 of 3 | $74,465 | Low, 4.0% under the second |
| 26 JAN 2011 | C00093388N01 | Staunton | Extend right and left turn lanes on us 33 | 1 of 3 | $138,229 | Low, 6.0% under the second |
| 25 AUG 2010 | C00054034N01 | Staunton | Rte 906 - rural rustic (middle river) | 2 of 3 | $517,859 | +5.0% |
| 28 APR 2010 | C00058240N01 | Staunton | Relocate rte 699 to improve intersection sight distance | 1 of 3 | $153,127 | Low, 3.0% under the second |
| 24 MAR 2010 | C00090220N01 | Lynchburg | Grade, drain,& asphalt pave | 1 of 3 | $408,091 | Low, 3.0% under the second |
| 24 FEB 2010 | C00079742M01 | Staunton | Bridge replacement and realignment | 2 of 3 | $1,033,008 | +9.0% |
| 22 AUG 2007 | C00058478M501 | Staunton | Ltl on eb & wb at rte. 276 & ltl fr w rte. 276 to r/r | 2 of 3 | $896,657 | +29% |
| 27 JUN 2007 | C00083467N01 | Staunton | Grade and asp. pave | 2 of 3 | $247,571 | +4.0% |
| 23 MAY 2007 | 00076042N01 | Staunton | 0.15 mi. grade, drain, asp. conc. pave., pave. planing, | 1 of 3 | $336,856 | Low, 10% under the second |
| 22 NOV 2006 | C00062149NO1 | Staunton | Oc-081-8(010) / (nfo)0011-081-111, n501 | 1 of 3 | $247,550 | Low, 22% under the second |
| 25 OCT 2006 | C00071738N01 | Staunton | 2.1 mi. shoulder widening & 0.07 mi. turn lane const. | 2 of 2 | $760,249 | +9.0% |
| 26 JUL 2006 | C00018060N01 | Staunton | Reconstruct & surf. treat. rural rustic rd. | 2 of 2 | $676,074 | +17% |
| 24 MAY 2006 | C00077099N02 | Staunton | Settlement repair, drain. improve., & turnlane | 2 of 2 | $383,865 | +14% |
| 23 NOV 2005 | C00072908N02 | Staunton | Grade, drain & asp. s. t. pave | 2 of 3 | $1,028,185 | +25% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.