Orders Construction Company, Inc.: VDOT bid record
Orders Construction Company, Inc. submitted 40 bids on Virginia DOT contracts in the data, from 27 AUG 2002 to 25 FEB 2026, and was the low bidder on 11 of them (28%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $54,545,257
- Latest bid
- 25 FEB 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 0 | 0% |
| 2005 | 2 | 1 | 50% |
| 2007 | 1 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 1 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 2 | 1 | 50% |
| 2012 | 3 | 0 | 0% |
| 2013 | 5 | 1 | 20% |
| 2015 | 6 | 3 | 50% |
| 2016 | 3 | 1 | 33% |
| 2017 | 6 | 2 | 33% |
| 2018 | 4 | 1 | 25% |
| 2019 | 1 | 1 | 100% |
| 2021 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 13 | 4 | 31% |
| Salem | 9 | 2 | 22% |
| Bristol | 9 | 2 | 22% |
| Lynchburg | 5 | 1 | 20% |
| Culpeper | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Group 2 channelizing devices | 512SD20-0024 | DAY | 32 | 18 (56%) | $0.56 | $1.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 17 | 15 (88%) | $3.40 | $8.00 |
| Concrete class A3, substruct. const. | 404SD20-0011 | CY | 16 | 11 (69%) | $560.00 | $775.00 |
| Type III barricade 8' | 24152 | EACH | 17 | 10 (59%) | $340.00 | $400.00 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 14 | 10 (71%) | $47.34 | $99.00 |
| Structure excavation const. | 401SD20-0001 | CY | 16 | 9 (56%) | $23.50 | $40.00 |
| Temporary sign | 512SD20-0014 | SF | 32 | 8 (25%) | $29.51 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 26 | 8 (31%) | $3.85 | $3.00 |
| Lime | 603SD20-0017 | TON | 22 | 8 (36%) | $165.00 | $200.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 15 | 7 (47%) | $4.59 | $5.00 |
| Warning light TY. B | 512SD20-0029 | DAY | 14 | 7 (50%) | $2.50 | $2.00 |
| Electronic arrow board | 512SD20-0026 | HR | 10 | 7 (70%) | $2.45 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Fairfield-Echols, LLC | 7 | 5 of 7 |
| Burleigh Construction Co., Inc. | 7 | 5 of 7 |
| Crossroads Bridge Inc | 6 | 5 of 6 |
| Fielder'S Choice Enterprises, Inc. | 6 | 4 of 6 |
| Elk Knob, Inc. | 5 | 4 of 5 |
| Allegheny Construction Company, Inc. | 5 | 1 of 5 |
| Hammond-Mitchell, Inc. | 4 | 2 of 4 |
| Lanford Brothers Company, Incorporated | 4 | 3 of 4 |
| Patrick Construction, Inc. | 4 | 2 of 4 |
| D. A. Brown, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 FEB 2026 | C0000117021B19 | Staunton | Sgr - bridge replacement | 5 of 5 | $3,647,950 | +32% |
| 25 AUG 2021 | C0000111282B24 | Lynchburg | Sgr - bridge replacement & approaches over appomattox river | 3 of 3 | $2,591,654 | +12% |
| 28 APR 2021 | C0000115172B01 | Bristol | Bridge rehabilitation over rte 52 & i-81 | 3 of 3 | $1,743,918 | +22% |
| 22 JAN 2019 | C00097555DB102 | Bristol | I-81 bridge replacement over rte.11,ns railroad & middle | 1 of 1 | $28,982,090 | Low |
| 19 DEC 2018 | C0000110578B79 | Bristol | Bridge rehabilitation over rte. 11 / 58 | 2 of 2 | $3,308,888 | +27% |
| 22 AUG 2018 | C0000077296B01 | Salem | Bridge replacement over mira fork creek | 3 of 3 | $1,879,386 | +34% |
| 25 APR 2018 | C0000104837B07 | Bristol | Superstructure replacement over town hill creek | 1 of 3 | $2,216,616 | Low, 4.0% under the second |
| 14 FEB 2018 | M817BRA111412 | Staunton | None0602-082-872, n501, b692 | 2 of 3 | $2,416,188 | +39% |
| 15 NOV 2017 | C0000098804B47 | Culpeper | Bridge replacement - ivy road over little ivy creek | 3 of 3 | $2,121,005 | +66% |
| 27 SEP 2017 | C0000077300B05 | Salem | Bridge replacements rte. 11 (lee hwy) over tinker creek | 1 of 3 | $5,342,054 | Low, 10% under the second |
| 22 FEB 2017 | C000101754B13 | Lynchburg | Bridge rehab on rte. 650 (mollies crk. rd.) over mollys crk. | 1 of 3 | $693,637 | Low, 1.0% under the second |
| 25 JAN 2017 | C0000090181C01 | Staunton | Bridge replacement on route 257 over dry river | 3 of 3 | $4,304,128 | +3.0% |
| 25 JAN 2017 | C0000103500B46 | Bristol | Bridge replacement on rte. 671 over valley creek road | 2 of 3 | $563,630 | +45% |
| 25 JAN 2017 | C0000110146B22 | Lynchburg | Restorative bridge maint at 5 locations | 2 of 3 | $1,367,865 | +1.0% |
| 21 DEC 2016 | C000082767B59 | Staunton | Bridge & approaches over north fork of shenandoah river | 3 of 3 | $1,819,715 | +3.0% |
| 21 DEC 2016 | C00082226B07 | Salem | Rte. 11 over beckner branch - bridge replacement | 3 of 3 | $4,096,640 | +17% |
| 23 MAR 2016 | C000082769B60B | Staunton | Br0s-085-8(071)(nfo)0663-085-310, b660, m501 | 1 of 1 | $2,111,652 | Low |
| 16 DEC 2015 | C000090185B11 | Staunton | Bridge replacement rte. 340 (main street) over south river | 2 of 2 | $7,661,630 | +9.0% |
| 16 DEC 2015 | C00077272B25 | Staunton | Bridge & approaches shenandoah river | 1 of 3 | $4,886,195 | Low, 26% under the second |
| 28 OCT 2015 | C0000095931C01 | Lynchburg | 0.546 mi. grade, drain, asp. pave and str. | 3 of 3 | $6,795,694 | +3.0% |
| 28 OCT 2015 | C0000106805N01 | Lynchburg | Br-br03(322)(nfo)brdg-963-319,n501 | 3 of 3 | $1,883,299 | +78% |
| 25 MAR 2015 | C00105981B02 | Culpeper | Latex bridge overlay (two structures) | 1 of 3 | $660,024 | Low, 1.0% under the second |
| 28 JAN 2015 | C00095114B46 | Culpeper | Rte.677 bridge over buckingham branch railroad | 1 of 3 | $3,312,796 | Low, 12% under the second |
| 20 NOV 2013 | C00090087B56 | Salem | Bridge replacement over roanoke river & approaches | 2 of 3 | $2,177,804 | +15% |
| 20 NOV 2013 | C00098285C01 | Staunton | 8 x 8 box culvert rehab. | 3 of 3 | $1,723,947 | +12% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.