VDOT contract C0000117021B19 bid tabulation
Sgr - bridge replacement. Let by Virginia DOT on February 25, 2026, Highland, Staunton. 5 bids received; low bid $2,771,355 by Freyssinet, Inc..
- Owner
- Virginia DOT
- Letting
- 25 FEB 2026
- Pay items
- 80
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Freyssinet, Inc. | $2,771,355 | Low |
| 2 | Caton Construction Group, Inc. | $2,869,080 | +4.0% |
| 3 | Fairfield-Echols, LLC | $2,993,357 | +8.0% |
| 4 | Brayman Construction Corporation | $3,368,763 | +22% |
| 5 | Orders Construction Company, Inc. | $3,647,950 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Freyssinet, Inc. | 2. Caton Construction Group, Inc. | 3. Fairfield-Echols, LLC | 4. Brayman Construction Corporation | 5. Orders Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $14,500 | $4,094.21 | $20,000 | $5,500.00 | $4,000.00 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 17 | $1,270.00 | $1,637.69 | $500.00 | $750.00 | $400.00 |
| 0001-0030 | Clearing and grubbing (301SD20-0001) | LS | 1 | $118,000 | $2,500.00 | $63,000 | $150,000 | $300,000 |
| 0001-0040 | Endwall EW-12 (302SD20-0013) | EACH | 6 | $2,980.00 | $2,438.36 | $1,627.50 | $3,100.00 | $1,700.00 |
| 0001-0050 | 15" pipe (302SD20-0023) | LF | 66 | $43.00 | $346.17 | $152.25 | $270.00 | $150.00 |
| 0001-0060 | 24" pipe (302SD20-0037) | LF | 126 | $81.00 | $270.42 | $10.50 | $175.00 | $200.00 |
| 0001-0070 | 36" pipe (302SD20-0057) | LF | 195 | $145.00 | $310.99 | $48.53 | $210.00 | $350.00 |
| 0001-0080 | Regular excavation (303SD20-0001) | CY | 1,862 | $36.00 | $48.97 | $89.25 | $60.00 | $64.00 |
| 0001-0090 | Borrow excavation (303SD20-0007) | CY | 492 | $74.00 | $176.31 | $78.75 | $95.00 | $110.00 |
| 0001-0100 | Temporary diversion dike (303SD20-0021) | LF | 134 | $52.00 | $24.55 | $44.10 | $16.00 | $26.00 |
| 0001-0110 | Check dam rock TY. II (303SD20-0023) | EACH | 17 | $230.00 | $488.14 | $787.50 | $700.00 | $280.00 |
| 0001-0120 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $99.00 | $2,730.66 | $6,032.25 | $9,500.00 | $3,900.00 |
| 0001-0130 | Siltation control excavation (303SD20-0029) | CY | 315 | $69.00 | $65.91 | $0.01 | $11.00 | $26.00 |
| 0001-0140 | Temp. silt fence type A (303SD20-0034) | LF | 1,850 | $1.50 | $7.61 | $13.65 | $25.00 | $9.00 |
| 0001-0150 | Temp.veh.watercourse crossing (303SX20-0024) | EACH | 1 | $58,100 | $32,130 | $171,111 | $180,000 | $200,000 |
| 0001-0160 | Geotextile subgrade stab. (305SD20-0009) | SY | 1,205 | $4.50 | $10.06 | $5.25 | $5.00 | $6.60 |
| 0001-0170 | Lime (306SD20-0001) | TON | 13.15 | $3,470.00 | $274.94 | $315.00 | $300.00 | $340.00 |
| 0001-0190 | Aggr. matl. no. 21B (308SD20-0007) | TON | 1,180 | $79.00 | $106.63 | $63.00 | $68.00 | $67.00 |
| 0001-0200 | Crusher run aggr. no. 25 or 26 (308SX20-0003) | TON | 82 | $84.00 | $69.89 | $68.25 | $190.00 | $110.00 |
| 0001-0210 | Asphalt concrete TY. SM- 9.5A const (315SD20-0007) | TON | 204 | $455.00 | $325.00 | $244.65 | $325.00 | $260.00 |
| 0001-0220 | Saw-cut asphalt concrete full depth (3.5 to 7 inches) (315SD20-0104) | LF | 40 | $45.00 | $48.50 | $63.00 | $100.00 | $20.00 |
| 0001-0230 | Structure excavation const. (401SD20-0001) | CY | 1,063 | $73.00 | $64.09 | $71.64 | $60.00 | $140.00 |
| 0001-0240 | Select backfill abutment zone (401SD20-0002) | TON | 1,582 | $68.00 | $74.75 | $70.95 | $60.00 | $74.00 |
| 0001-0250 | Geocomposite wall drain (401SD20-0004) | SY | 75 | $50.00 | $69.77 | $42.90 | $100.00 | $94.00 |
| 0001-0260 | Cofferdam (401SD20-0007) | EACH | 4 | $6,250.00 | $17,210 | $29,385 | $62,000 | $25,000 |
| 0001-0270 | Steel piles 12" (403SD20-0006) | LF | 430 | $455.00 | $381.17 | $110.90 | $200.00 | $160.00 |
| 0001-0280 | Pile point for 12" steel pile (403SD20-0034) | EACH | 21 | $3,630.00 | $232.39 | $248.83 | $175.00 | $460.00 |
| 0001-0290 | Dynamic pile test end bearing piles (403SX20-0001) | EACH | 2 | $7,270.00 | $13,373 | $3,636.64 | $9,000.00 | $6,000.00 |
| 0001-0300 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 151.60 | $1,150.00 | $1,951.71 | $1,700.09 | $2,400.00 | $2,000.00 |
| 0001-0310 | Shear keys (404SP20-0002) | CF | 15.30 | $1,170.00 | $934.04 | $1,910.04 | $1,200.00 | $1,300.00 |
| 0001-0320 | VA adjacent member conn. block-outs (404SP20-0003) | CF | 60.20 | $435.00 | $582.35 | $614.52 | $750.00 | $580.00 |
| 0001-0330 | NS concrete A3 (unreinforced) (404SX20-0004) | CY | 36.20 | $500.00 | $1,155.78 | $1,143.14 | $600.00 | $850.00 |
| 0001-0340 | NS prestressed concrete slab prestr. conc. slab 3'-6" X 21" X 60' (405SX20-0004) | EACH | 7 | $53,800 | $49,329 | $48,438 | $43,000 | $50,000 |
| 0001-0350 | CR reinf. steel CL. I SPR. struct. const. (406SD20-0003) | LB | 422 | $5.50 | $5.50 | $11.99 | $16.00 | $6.30 |
| 0001-0360 | Reinforcing steel substruct. const. (406SD20-0006) | LB | 9,953 | $3.00 | $2.87 | $2.61 | $6.00 | $5.80 |
| 0001-0370 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 4,344 | $5.50 | $5.69 | $6.62 | $8.00 | $7.30 |
| 0001-0380 | NS bridge incidentals temporary shoring (410SX20-0014) | LS | 1 | $2.00 | $409.42 | $24,757 | $75,000 | $1.00 |
| 0001-0390 | NS dism. & rem. exist. STR. exist. remnant STR. abut. and approaches (413SX20-0002) | LS | 1 | $4,010.00 | $32,125 | $133,202 | $30,000 | $148,000 |
| 0001-0400 | NS dism. & rem. exist. STR. exist. STR. no. 6030 (413SX20-0002) | LS | 1 | $15,700 | $73,954 | $257,169 | $102,000 | $350,000 |
| 0001-0410 | NS env.& worker protect. exist. STR. no. 6030 (413SX20-0003) | LS | 1 | $36,300 | $6,000.00 | $0.01 | $25,000 | $14,000 |
| 0001-0420 | NS material disposal exist. STR. no. 6030 (413SX20-0004) | LS | 1 | $16,300 | $16,448 | $5,250.00 | $45,000 | $2,300.00 |
| 0001-0430 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 170 | $125.00 | $137.58 | $187.00 | $210.00 | $98.00 |
| 0001-0440 | Dry riprap CL.I 26" (414SD20-0012) | TON | 850 | $115.00 | $125.07 | $101.93 | $85.00 | $100.00 |
| 0001-0450 | Dry riprap CL.II 38" (414SD20-0057) | TON | 276 | $140.00 | $147.53 | $172.97 | $125.00 | $130.00 |
| 0001-0460 | Epoxy overlay const (431SD20-0001) | SY | 164 | $290.00 | $289.78 | $190.22 | $220.00 | $270.00 |
| 0001-0470 | Crossdrain CD-2 (501SD20-0007) | LF | 72 | $11.00 | $80.87 | $105.00 | $50.00 | $110.00 |
| 0001-0480 | Outlet pipe (501SD20-0009) | LF | 23 | $16.00 | $224.50 | $105.00 | $110.00 | $76.00 |
| 0001-0490 | NS guardrail thrie beam (505SX20-0057) | LF | 164 | $430.00 | $213.18 | $259.17 | $225.00 | $110.00 |
| 0001-0500 | Demo. of PVMT. combination (508SD20-0002) | SY | 1,908 | $22.00 | $31.38 | $16.80 | $14.00 | $7.30 |
| 0001-0510 | Flowable backfill (509SD20-0001) | CY | 1 | $290.00 | $3,242.11 | $1,632.58 | $5,000.00 | $2,100.00 |
| 0001-0520 | NS remove exist. pipe (510SX20-0039) | LF | 36 | $9.50 | $104.50 | $52.50 | $250.00 | $120.00 |
| 0001-0530 | Allaying dust (511SD20-0001) | HR | 60 | $91.00 | $291.67 | $0.01 | $76.00 | $240.00 |
| 0001-0540 | Type 3 barricade 8' (512SD20-0013) | EACH | 8 | $570.00 | $275.00 | $194.60 | $275.00 | $1,300.00 |
| 0001-0550 | Temporary sign (512SD20-0014) | SF | 642.40 | $25.00 | $19.99 | $27.94 | $20.00 | $35.00 |
| 0001-0560 | Group 2 channelizing devices (512SD20-0024) | DAY | 7,250 | $1.00 | $0.15 | $0.28 | $0.15 | $2.50 |
| 0001-0570 | Port.changeable mess. sign (512SD20-0025) | HR | 1,008 | $4.50 | $2.55 | $7.32 | $27.00 | $8.00 |
| 0001-0580 | Flagger service (512SD20-0027) | HR | 200 | $73.00 | $59.00 | $72.45 | $65.00 | $79.00 |
| 0001-0590 | Warning light TY. B (512SD20-0029) | DAY | 1,460 | $6.50 | $0.30 | $2.28 | $1.00 | $3.80 |
| 0001-0600 | Traffic barrier service conc. (512SD20-0066) | LF | 68 | $135.00 | $73.16 | $9.23 | $130.00 | $130.00 |
| 0001-0610 | Mobilization (513SD20-0001) | LS | 1 | $135,000 | $143,466 | $179,665 | $192,000 | $210,000 |
| 0001-0620 | Field office TY.II (514SD20-0002) | MO | 18 | $3,180.00 | $3,957.00 | $1,900.00 | $4,000.00 | $3,000.00 |
| 0001-0630 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 20 | $7.50 | $486.06 | $100.80 | $375.00 | $110.00 |
| 0001-0640 | Construction surveying constr. (517SD20-0001) | LS | 1 | $36,300 | $25,300 | $33,600 | $150,000 | $100,000 |
| 0001-0650 | Topsoil class B (602SD20-0004) | CY | 964 | $43.00 | $181.20 | $131.25 | $60.00 | $110.00 |
| 0001-0660 | Temporary seed (603SD20-0002) | LB | 239 | $14.00 | $12.73 | $4.67 | $4.45 | $5.00 |
| 0001-0670 | Regular seed (603SD20-0003) | LB | 120 | $20.00 | $11.29 | $6.04 | $5.75 | $6.50 |
| 0001-0680 | Overseeding (603SD20-0004) | LB | 96 | $19.00 | $7.42 | $8.14 | $7.75 | $8.70 |
| 0001-0690 | Legume seed (603SD20-0005) | LB | 30 | $22.00 | $60.28 | $8.14 | $7.75 | $8.70 |
| 0001-0700 | Legume overseeding (603SD20-0006) | LB | 24 | $24.00 | $60.28 | $10.24 | $9.75 | $11.00 |
| 0001-0710 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 2,057 | $5.50 | $0.53 | $0.47 | $0.45 | $0.51 |
| 0001-0720 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 23,970 | $5.50 | $0.73 | $0.65 | $0.62 | $0.70 |
| 0001-0730 | Fertilizer nitrogen - N (603SD20-0014) | LB | 239 | $14.00 | $1.27 | $1.68 | $1.60 | $1.80 |
| 0001-0740 | Fertilizer phosphorous - P (603SD20-0015) | LB | 167 | $14.00 | $1.27 | $1.68 | $1.60 | $1.80 |
| 0001-0750 | Fertilizer potassium - K (603SD20-0016) | LB | 167 | $15.00 | $1.27 | $1.68 | $1.60 | $1.80 |
| 0001-0760 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 838 | $18.00 | $2.64 | $2.89 | $2.75 | $3.10 |
| 0001-0770 | Rolled erosion CTRL product EC-2 type 4 (606SD20-0004) | SY | 1,032 | $18.00 | $3.19 | $3.99 | $3.80 | $4.30 |
| 0001-0780 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 40 | $33.00 | $18.00 | $18.90 | $70.00 | $20.00 |
| 0001-0790 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 4 | $1,260.00 | $692.00 | $726.60 | $1,100.00 | $780.00 |
| 0001-0800 | Sign panel (701SD20-0001) | SF | 12 | $51.00 | $28.00 | $29.40 | $100.00 | $32.00 |
| 0001-0810 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 24 | $490.00 | $270.83 | $78.75 | $270.83 | $300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of February 25, 2026. Compiled by Mirage Metrics.