Burleigh Construction Co., Inc.: VDOT bid record
Burleigh Construction Co., Inc. submitted 288 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 27 MAY 2026, and was the low bidder on 106 of them (37%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $86,117,239
- Latest bid
- 27 MAY 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 12 | 6 | 50% |
| 2003 | 13 | 3 | 23% |
| 2004 | 11 | 4 | 36% |
| 2005 | 19 | 9 | 47% |
| 2006 | 12 | 4 | 33% |
| 2007 | 18 | 3 | 17% |
| 2008 | 14 | 3 | 21% |
| 2009 | 21 | 9 | 43% |
| 2010 | 15 | 4 | 27% |
| 2011 | 21 | 6 | 29% |
| 2012 | 5 | 2 | 40% |
| 2013 | 8 | 5 | 63% |
| 2014 | 19 | 8 | 42% |
| 2015 | 14 | 7 | 50% |
| 2016 | 20 | 7 | 35% |
| 2017 | 18 | 5 | 28% |
| 2018 | 9 | 3 | 33% |
| 2019 | 12 | 5 | 42% |
| 2020 | 11 | 6 | 55% |
| 2021 | 10 | 5 | 50% |
| 2026 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lynchburg | 85 | 41 | 48% |
| Salem | 67 | 19 | 28% |
| Richmond | 49 | 14 | 29% |
| Culpeper | 33 | 11 | 33% |
| Fredericksburg | 19 | 10 | 53% |
| Staunton | 16 | 5 | 31% |
| Bristol | 7 | 1 | 14% |
| Hampton Roads | 6 | 1 | 17% |
| Northern Virginia | 6 | 4 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Siltation control excavation | 303SD20-0029 | CY | 116 | 97 (84%) | $1.00 | $3.50 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 151 | 69 (46%) | $80.00 | $99.00 |
| Flagger service | 512SD20-0027 | HR | 124 | 67 (54%) | $19.50 | $20.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 146 | 63 (43%) | $1.00 | $1.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 58 | 44 (76%) | $15.00 | $20.00 |
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 97 | 39 (40%) | $35.75 | $26.00 |
| NS BR.superstr. wid./repair replace bearing | 412SX20-0009 | EACH | 130 | 37 (28%) | $3,600.00 | $1,500.00 |
| Temporary sign | 512SD20-0014 | SF | 120 | 37 (31%) | $24.00 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 122 | 34 (28%) | $4.00 | $3.00 |
| Overseeding | 603SD20-0004 | LB | 84 | 33 (39%) | $5.65 | $5.00 |
| NS BR.superstr. wid./repair deck slab closure | 412SX20-0015 | SY | 60 | 31 (52%) | $125.00 | $125.00 |
| Patching type B | 412SD20-0033 | SY | 48 | 31 (65%) | $230.00 | $250.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lanford Brothers Company, Incorporated | 62 | 37 of 62 |
| Cleco Corporation | 30 | 12 of 30 |
| McClain & Co., Inc. | 28 | 10 of 28 |
| Corman Construction, Inc. | 25 | 9 of 25 |
| DLB, Inc. | 23 | 13 of 23 |
| Crossroads Bridge Inc | 22 | 10 of 22 |
| Deangelo Brothers, LLC | 22 | 7 of 22 |
| Haymes Brothers, Inc. | 20 | 10 of 20 |
| Fairfield-Echols, LLC | 15 | 8 of 15 |
| English Construction Company, Incorporated | 14 | 4 of 14 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 MAY 2026 | C0000118430B39 | Culpeper | Sgr - bridge replacement | 1 of 8 | $1,987,271 | Low, 8.0% under the second |
| 27 MAY 2026 | C0000107309M01 | Salem | Retaining wall and road safety improvements | 1 of 4 | $2,475,173 | Low, 9.0% under the second |
| 22 APR 2026 | C0000124151C01 | Lynchburg | Bridge maintenance - rigid overlay | 2 of 2 | $13,111,740 | +131% |
| 22 APR 2026 | C0000117024B05 | Staunton | Sgr - bridge rehabilitation | 7 of 7 | $4,787,445 | +63% |
| 22 APR 2026 | C0000120999D01 | Salem | Culvert rehabilitation | 2 of 4 | $1,216,548 | +6.0% |
| 04 FEB 2026 | C0000093091B01 | Richmond | Bridge rehabilitation | 4 of 5 | $9,499,730 | +104% |
| 15 DEC 2021 | C0000111777C01 | Culpeper | Sgr - bridge replacement over east branch thumb run | 2 of 3 | $1,777,934 | +35% |
| 22 SEP 2021 | C0000117020D36 | Salem | Sgr - culvert replacement | 1 of 3 | $1,614,158 | Low, 6.0% under the second |
| 25 AUG 2021 | C0000110623D26 | Salem | Culvert repair and replacement | 2 of 3 | $2,033,408 | +12% |
| 25 AUG 2021 | C0000111282B24 | Lynchburg | Sgr - bridge replacement & approaches over appomattox river | 1 of 3 | $2,319,861 | Low, 0.0% under the second |
| 25 AUG 2021 | C0000116173N01 | Bristol | High friction epoxy overlay & wildlife fencing improvements | 3 of 3 | $1,635,354 | +49% |
| 26 MAY 2021 | C0000111278B17 | Richmond | Bridge scour protection | 1 of 2 | $1,932,336 | Low, 2.0% under the second |
| 24 MAR 2021 | C0000116749N01 | Lynchburg | Nhpp-br0-3(343)9999-963-549, n501 | 1 of 3 | $1,947,382 | Low, 1.0% under the second |
| 24 MAR 2021 | C0000117564B40 | Salem | Bridge cleaning (secondary system) | 2 of 3 | $206,593 | +4.0% |
| 24 MAR 2021 | C0000117565B21 | Salem | Bridge cleaning (primary system) | 1 of 3 | $190,167 | Low, 4.0% under the second |
| 20 JAN 2021 | C0000116748N01 | Lynchburg | Districtwide bridge washing contract | 2 of 3 | $491,210 | +3.0% |
| 21 OCT 2020 | C0000101043B60 | Lynchburg | Bridge rehabilitation over williams run | 3 of 3 | $968,767 | +29% |
| 21 OCT 2020 | C0000101238B22 | Richmond | Bridge over deep creek replacement | 1 of 3 | $1,291,974 | Low, 7.0% under the second |
| 21 OCT 2020 | C0000110624B15 | Salem | Sgr - bridge deck replacement over nsrr | 1 of 3 | $1,782,395 | Low, 23% under the second |
| 21 OCT 2020 | C0000111392B46 | Fredericksburg | Sgr - legacy bridge replacement over south river | 1 of 3 | $990,042 | Low, 9.0% under the second |
| 21 OCT 2020 | C0000116153N01 | Fredericksburg | On-call bridge cleaning | 2 of 3 | $580,129 | +18% |
| 26 AUG 2020 | C00000104187B68 | Salem | Sgr - bridge replacement over nsrr | 1 of 3 | $2,311,168 | Low, 1.0% under the second |
| 26 AUG 2020 | C0000114712B53 | Richmond | Abutment scour repairs | 1 of 2 | $194,687 | Low, 100% under the second |
| 24 JUN 2020 | C0000114769B01 | Staunton | Stp-br07(308)brdg-967-454, n501 | 2 of 2 | $994,438 | +7.0% |
| 24 JUN 2020 | C000101246M01B | Richmond | Bridge repair over appomattox river | 1 of 3 | $1,528,324 | Low, 1.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.