VDOT contract C0000117024B05 bid tabulation
Sgr - bridge rehabilitation. Let by Virginia DOT on April 22, 2026, Augusta, Staunton. 7 bids received; low bid $2,942,429 by Fairfield-Echols, LLC.
- Owner
- Virginia DOT
- Letting
- 22 APR 2026
- Pay items
- 72
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Fairfield-Echols, LLC | $2,942,429 | Low |
| 2 | Haymes Brothers, Inc. | $3,876,659 | +32% |
| 3 | Caton Construction Group, Inc. | $3,925,475 | +33% |
| 4 | Allegheny Construction Company, Inc. | $4,402,036 | +50% |
| 5 | TERRA SITE CONSTRUCTORS, LLC dba TERRA | $4,547,017 | +55% |
| 6 | Stonewall Bridge, Inc. | $4,680,089 | +59% |
| 7 | Burleigh Construction Co., Inc. | $4,787,445 | +63% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fairfield-Echols, LLC | 2. Haymes Brothers, Inc. | 3. Caton Construction Group, Inc. | 4. Allegheny Construction Company, Inc. | 5. TERRA SITE CONSTRUCTORS, LLC dba TERRA | 6. Stonewall Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Endwall EW-12 (302SD20-0013) | EACH | 2 | $1,042.65 | $1,000.00 | $4,255.86 | $1,200.00 | $4,820.00 | $2,500.00 |
| 0001-0020 | Endwall EW-12 (302SD20-0013) | EACH | 1 | $1,042.65 | $1,000.00 | $5,862.91 | $1,400.00 | $4,820.00 | $2,500.00 |
| 0001-0030 | 24" pipe (302SD20-0037) | LF | 64 | $175.35 | $185.00 | $199.54 | $170.00 | $330.00 | $100.00 |
| 0001-0040 | Grading (303SD20-0004) | LS | 1 | $15,540 | $100,000 | $87,000 | $150,000 | $49,300 | $50,000 |
| 0001-0050 | Borrow excavation (303SD20-0007) | CY | 115 | $78.75 | $42.00 | $74.59 | $82.00 | $170.00 | $75.00 |
| 0001-0060 | Check dam rock TY. II (303SD20-0023) | EACH | 3 | $680.40 | $350.00 | $488.08 | $900.00 | $3,520.00 | $300.00 |
| 0001-0070 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $0.01 | $500.00 | $2,977.67 | $3,500.00 | $2,520.00 | $5,000.00 |
| 0001-0080 | Siltation control excavation (303SD20-0029) | CY | 224 | $5.25 | $10.00 | $0.01 | $16.00 | $160.00 | $1.00 |
| 0001-0090 | Temp. silt fence type B (303SD20-0033) | LF | 1,270 | $6.59 | $6.00 | $14.75 | $8.50 | $7.50 | $10.00 |
| 0001-0100 | Geotextile subgrade stab. (305SD20-0009) | SY | 322 | $16.28 | $5.00 | $11.37 | $8.00 | $7.00 | $5.00 |
| 0001-0110 | Lime (306SD20-0001) | TON | 6.26 | $273.00 | $286.00 | $200.00 | $250.00 | $380.00 | $400.00 |
| 0001-0120 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 90 | $115.79 | $100.00 | $152.63 | $100.00 | $160.00 | $100.00 |
| 0001-0130 | Modified double seal (314SP20-0014) | SY | 616.30 | $70.35 | $74.00 | $29.50 | $40.00 | $150.00 | $10.00 |
| 0001-0140 | NS asphalt concrete SM- 9.5AL (315SX20-0007) | TON | 38 | $315.00 | $700.00 | $300.00 | $500.00 | $720.00 | $500.00 |
| 0001-0150 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 38 | $14.39 | $32.00 | $67.03 | $22.00 | $30.00 | $20.00 |
| 0001-0160 | Structure excavation const. (401SD20-0001) | CY | 304 | $84.78 | $100.00 | $46.46 | $100.00 | $75.00 | $100.00 |
| 0001-0170 | Select backfill abutment zone (401SD20-0002) | TON | 323 | $122.88 | $115.00 | $57.00 | $80.00 | $100.00 | $100.00 |
| 0001-0180 | Geocomposite wall drain (401SD20-0004) | SY | 16 | $71.38 | $24.00 | $32.24 | $175.00 | $88.00 | $120.00 |
| 0001-0190 | Pipe underdrain 6" const. (401SD20-0005) | LF | 166 | $11.59 | $14.00 | $14.82 | $44.00 | $73.00 | $50.00 |
| 0001-0200 | Cofferdam (401SD20-0007) | EACH | 3 | $0.01 | $28,000 | $28,000 | $18,000 | $30,000 | $12,000 |
| 0001-0210 | NS temp. causeway temp. causeway (401SX20-0002) | LS | 1 | $237,983 | $650,000 | $355,000 | $250,000 | $565,590 | $200,000 |
| 0001-0230 | Concrete class A4, substruct. const. (404SD20-0012) | CY | 128 | $2,578.10 | $1,600.00 | $2,055.00 | $3,225.00 | $2,970.00 | $2,000.00 |
| 0001-0240 | NS concrete class A3 (unreinforced) (404SX20-0001) | CY | 9.80 | $1,679.36 | $550.00 | $516.75 | $1,500.00 | $730.00 | $1,500.00 |
| 0001-0250 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 11,220 | $8.42 | $2.95 | $5.48 | $13.50 | $5.50 | $8.00 |
| 0001-0260 | NS struct. steel prefabricated steel truss superstructure (407SX20-0003) | LS | 1 | $1,228,473 | $1,350,000 | $1,600,000 | $1,675,000 | $1,567,490 | $2,250,000 |
| 0001-0270 | NS BR.superstr. wid./repair temporary pier supports (412SX20-0013) | LS | 1 | $0.01 | $210,000 | $250,000 | $135,000 | $86,670 | $30,000 |
| 0001-0280 | NS env.& worker protect. structure 6149 (413SX20-0003) | LS | 1 | $6,300.00 | $7,500.00 | $6,000.00 | $27,000 | $85,880 | $50,000 |
| 0001-0290 | NS material disposal structure 6149 (413SX20-0004) | LS | 1 | $3,150.00 | $3,500.00 | $7,317.29 | $50,000 | $36,450 | $50,000 |
| 0001-0300 | NS rem. port.of EX.STR. no. 6149 (413SX20-0005) | LS | 1 | $186,754 | $315,000 | $188,000 | $375,000 | $280,850 | $500,000 |
| 0001-0310 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 10 | $84.00 | $92.00 | $123.49 | $110.00 | $270.00 | $100.00 |
| 0001-0320 | Lumber treated, SPR. struct. const. (418SD20-0001) | MFBM | 12.40 | $22,552 | $20,500 | $24,661 | $24,750 | $26,270 | $23,500 |
| 0001-0330 | Waterproofing membrane type III (429SD20-0004) | SY | 315 | $34.01 | $42.00 | $90.42 | $55.00 | $73.00 | $35.00 |
| 0001-0340 | NS nbis access, under bridge virginia STR. 6149 (430SX20-0001) | DAY | 2 | $1,360.79 | $1,600.00 | $6,925.17 | $4,000.00 | $9,190.00 | $7,000.00 |
| 0001-0350 | Crossdrain CD-2 (501SD20-0007) | LF | 36 | $32.92 | $25.00 | $46.89 | $43.00 | $140.00 | $55.00 |
| 0001-0360 | Outlet pipe (501SD20-0009) | LF | 18 | $37.80 | $18.50 | $36.44 | $32.00 | $110.00 | $40.00 |
| 0001-0370 | Concrete class A3 misc. (504SD20-0001) | CY | 1.40 | $2,680.65 | $1,000.00 | $3,958.10 | $2,150.00 | $3,080.00 | $2,000.00 |
| 0001-0380 | Guardrail GR-MGS1 (505SD20-0011) | LF | 87.50 | $47.25 | $50.00 | $45.00 | $48.00 | $45.00 | $45.00 |
| 0001-0390 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 150 | $57.75 | $60.00 | $55.00 | $60.00 | $52.00 | $50.00 |
| 0001-0400 | Radial guardrail GR- MGS1, 9' post (505SD20-0016) | LF | 25 | $63.00 | $66.00 | $60.00 | $65.00 | $73.00 | $55.00 |
| 0001-0410 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 3 | $5,250.00 | $5,500.00 | $5,000.00 | $5,400.00 | $5,040.00 | $4,100.00 |
| 0001-0420 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $2,100.00 | $2,200.00 | $2,000.00 | $2,100.00 | $5,040.00 | $1,500.00 |
| 0001-0430 | Guardrail terminal GR-6 NCHRP 350 (505SD20-0027) | LF | 12.50 | $210.00 | $220.00 | $200.00 | $215.00 | $220.00 | $100.00 |
| 0001-0440 | Guardrail GR-2 (505SD20-0030) | LF | 12.50 | $47.25 | $50.00 | $45.00 | $50.00 | $220.00 | $40.00 |
| 0001-0450 | Guardrail ter.site preparation (505SD20-0039) | EACH | 3 | $525.00 | $1,050.00 | $250.00 | $850.00 | $5,270.00 | $1,000.00 |
| 0001-0460 | Remove existing guardrail (505SD20-0073) | LF | 435 | $8.40 | $11.00 | $10.00 | $10.00 | $7.50 | $50.00 |
| 0001-0470 | Guardrail, thrie beam (505SD20-0074) | LF | 350 | $2.05 | $135.00 | $125.00 | $165.00 | $110.00 | $330.00 |
| 0001-0480 | NS guardrail top mounted post (505SX20-0004) | EACH | 12 | $525.00 | $550.00 | $500.00 | $5,500.00 | $330.00 | $1,300.00 |
| 0001-0490 | NS guardrail W-beam to thrie beam transition section (505SX20-0058) | EACH | 4 | $1,050.00 | $1,100.00 | $1,000.00 | $1,100.00 | $7,200.00 | $1,100.00 |
| 0001-0500 | High visibility fence, 4 feet (507SD20-0027) | LF | 85 | $8.40 | $6.00 | $45.00 | $5.00 | $15.00 | $20.00 |
| 0001-0510 | Demo. of PVMT. combination (508SD20-0002) | SY | 322 | $27.83 | $14.00 | $30.00 | $16.00 | $30.00 | $20.00 |
| 0001-0520 | Flowable backfill (509SD20-0001) | CY | 5 | $1,143.45 | $700.00 | $3,225.00 | $450.00 | $510.00 | $300.00 |
| 0001-0530 | NS remove exist. remove and salvage existing detour sign (510SX20-0040) | EACH | 12 | $265.19 | $125.00 | $363.67 | $175.00 | $120.00 | $250.00 |
| 0001-0540 | Traffic barrier service MB-11A (512SD20-0003) | LF | 48 | $40.51 | $50.00 | $120.00 | $50.00 | $180.00 | $100.00 |
| 0001-0550 | Type 3 barricade 4' (512SD20-0012) | EACH | 5 | $159.11 | $350.00 | $434.90 | $450.00 | $340.00 | $300.00 |
| 0001-0560 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $198.89 | $375.00 | $493.86 | $500.00 | $410.00 | $500.00 |
| 0001-0570 | Temporary sign (512SD20-0014) | SF | 360 | $19.95 | $1.00 | $5.00 | $26.00 | $32.00 | $30.00 |
| 0001-0580 | Mobilization (513SD20-0001) | LS | 1 | $177,121 | $170,000 | $196,200 | $185,555 | $136,610 | $250,000 |
| 0001-0590 | Field office TY.I (514SD20-0001) | MO | 12 | $1,450.00 | $3,200.00 | $6,623.75 | $4,000.00 | $10,990 | $3,000.00 |
| 0001-0600 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 21.50 | $9.97 | $520.00 | $9.50 | $75.60 | $160.00 | $20.00 |
| 0001-0610 | Construction surveying constr. (517SD20-0001) | LS | 1 | $11,970 | $35,000 | $22,400 | $50,000 | $42,830 | $50,000 |
| 0001-0620 | Mailbox post, single (521SD20-0001) | EACH | 2 | $525.00 | $400.00 | $667.11 | $500.00 | $220.00 | $500.00 |
| 0001-0630 | Topsoil class B (602SD20-0004) | CY | 536 | $76.40 | $110.00 | $108.93 | $150.00 | $230.00 | $65.00 |
| 0001-0640 | Temporary seed (603SD20-0002) | LB | 80 | $12.56 | $12.50 | $3.00 | $22.00 | $6.00 | $5.00 |
| 0001-0650 | Regular seed (603SD20-0003) | LB | 532 | $7.82 | $8.00 | $3.00 | $18.00 | $8.50 | $7.00 |
| 0001-0660 | Overseeding (603SD20-0004) | LB | 426 | $7.31 | $7.70 | $3.00 | $5.00 | $7.00 | $8.00 |
| 0001-0670 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 5,990 | $0.47 | $0.50 | $0.45 | $1.00 | $0.50 | $5.00 |
| 0001-0680 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 3,872 | $0.68 | $0.71 | $0.81 | $1.50 | $0.50 | $6.00 |
| 0001-0690 | Hydraulic erosion control product type 4 (603SD20-0010) | SY | 2,057 | $1.03 | $1.10 | $2.31 | $2.00 | $0.50 | $7.00 |
| 0001-0700 | Fertilizer nitrogen - N (603SD20-0014) | LB | 122 | $1.26 | $1.32 | $8.00 | $4.00 | $2.50 | $5.00 |
| 0001-0710 | Fertilizer phosphorous - P (603SD20-0015) | LB | 83 | $1.26 | $1.32 | $8.00 | $4.00 | $2.50 | $6.00 |
| 0001-0720 | Fertilizer potassium - K (603SD20-0016) | LB | 83 | $1.26 | $1.32 | $8.00 | $4.00 | $2.50 | $6.00 |
| 0001-0730 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 382 | $2.36 | $2.50 | $2.25 | $5.00 | $23.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of April 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.