Crossroads Bridge Inc: VDOT bid record
Crossroads Bridge Inc submitted 112 bids on Virginia DOT contracts in the data, from 27 JUL 2011 to 28 OCT 2026, and was the low bidder on 35 of them (31%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $45,528,283
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2011 | 3 | 3 | 100% |
| 2012 | 8 | 2 | 25% |
| 2013 | 15 | 4 | 27% |
| 2014 | 13 | 3 | 23% |
| 2015 | 11 | 2 | 18% |
| 2016 | 18 | 5 | 28% |
| 2017 | 3 | 2 | 67% |
| 2018 | 10 | 4 | 40% |
| 2019 | 6 | 2 | 33% |
| 2020 | 2 | 1 | 50% |
| 2021 | 12 | 3 | 25% |
| 2025 | 3 | 2 | 67% |
| 2026 | 8 | 2 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bristol | 45 | 13 | 29% |
| Salem | 36 | 10 | 28% |
| Lynchburg | 14 | 4 | 29% |
| Staunton | 9 | 3 | 33% |
| Culpeper | 5 | 3 | 60% |
| Richmond | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Flagger service | 512SD20-0027 | HR | 71 | 49 (69%) | $19.50 | $20.00 |
| NS BR.superstr. wid./repair replace bearing | 412SX20-0009 | EACH | 62 | 27 (44%) | $1,320.00 | $1,500.00 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 82 | 22 (27%) | $83.50 | $99.00 |
| Temporary sign | 512SD20-0014 | SF | 79 | 21 (27%) | $25.00 | $20.00 |
| Lime | 603SD20-0017 | TON | 43 | 21 (49%) | $175.00 | $200.00 |
| Concrete class A3, substruct. const. | 404SD20-0011 | CY | 31 | 21 (68%) | $650.00 | $775.00 |
| Concrete substruct. surface repair | 412SD20-0061 | SY | 46 | 20 (43%) | $1,000.00 | $1,000.00 |
| Structure excavation const. | 401SD20-0001 | CY | 38 | 20 (53%) | $30.00 | $40.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 71 | 19 (27%) | $1.50 | $1.00 |
| Overseeding | 603SD20-0004 | LB | 42 | 19 (45%) | $13.25 | $5.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 41 | 18 (44%) | $7.00 | $5.00 |
| Flexible pave.planing 0"-2" | 515SD20-0004 | SY | 45 | 17 (38%) | $16.00 | $9.11 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Burleigh Construction Co., Inc. | 22 | 12 of 22 |
| Elk Knob, Inc. | 19 | 12 of 19 |
| Lanford Brothers Company, Incorporated | 16 | 8 of 16 |
| Patrick Construction, Inc. | 16 | 9 of 16 |
| Ken Construction Co., Inc. | 14 | 8 of 14 |
| Haymes Brothers, Inc. | 10 | 5 of 10 |
| Allegheny Construction Company, Inc. | 10 | 2 of 10 |
| Jones Road & Bridge, Inc. | 9 | 5 of 9 |
| Cleco Corporation | 9 | 2 of 9 |
| Fairfield-Echols, LLC | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000127207B70 | Salem | Bridge rehab | 3 of 4 | $564,579 | +23% |
| 26 AUG 2026 | C0000124370N01B | Bristol | Bridge joint repair | 1 of 3 | $902,546 | Low, 1.0% under the second |
| 26 AUG 2026 | C0000128603B82 | Bristol | Bridge rehabilitation | 3 of 6 | $11,467,571 | +35% |
| 22 JUL 2026 | C0000120697C01 | Salem | Intersection improvements / pedestrian accommodations | 1 of 3 | $4,870,763 | Low, 25% under the second |
| 24 JUN 2026 | C0000117111B62 | Bristol | Sgr - bridge replacement | 2 of 3 | $1,905,119 | +17% |
| 22 APR 2026 | C0000120999D01 | Salem | Culvert rehabilitation | 4 of 4 | $1,423,993 | +24% |
| 25 MAR 2026 | C0000121244B67 | Bristol | Bridge rehabilitation | 6 of 7 | $6,867,564 | +46% |
| 25 FEB 2026 | C0000128511B24 | Salem | Bridge rehabilitation - beam replacement | 2 of 4 | $653,237 | +25% |
| 17 DEC 2025 | C0000119452C50 | Salem | Smart scale - intersection improvements/ lane addition | 1 of 5 | $2,487,557 | Low, 4.0% under the second |
| 17 DEC 2025 | C0000121000D04 | Salem | Culvert rehabilitation | 1 of 2 | $3,040,970 | Low, 81% under the second |
| 19 NOV 2025 | C0000116160B01 | Bristol | Decel lane extension & bridge widening | 2 of 3 | $13,463,217 | +14% |
| 15 DEC 2021 | C0000113885N01 | Bristol | Sgr - bridge rehab over north fork holston river | 1 of 3 | $396,860 | Low, 26% under the second |
| 15 DEC 2021 | C0000117347B23 | Bristol | Bridge rehabilitation over clinch river | 3 of 3 | $4,517,454 | +26% |
| 17 NOV 2021 | CM119LMA115175 | Bristol | Bridge deck replacement over norfolk southern railroad | 2 of 3 | $1,531,118 | +20% |
| 27 OCT 2021 | C0000112877B10 | Salem | Sgr - bridge replacement over meadow creek | 2 of 3 | $2,027,148 | +3.0% |
| 25 AUG 2021 | C0000110620B36 | Salem | Sgr - superstructure replacement over roanoke river | 3 of 3 | $1,769,291 | +10% |
| 25 AUG 2021 | C0000110623D26 | Salem | Culvert repair and replacement | 1 of 3 | $1,818,920 | Low, 12% under the second |
| 28 JUL 2021 | C0000110001B54 | Culpeper | Sgr - bridge replacement over lickinghole creek | 2 of 3 | $1,123,402 | +1.0% |
| 28 JUL 2021 | C0000110796M01 | Bristol | Smart scale - intersection improvements | 2 of 3 | $1,375,782 | +8.0% |
| 28 APR 2021 | C0000110795C01 | Bristol | Smartscale - add lane to rte 107 under i-81 exit 35 | 3 of 3 | $1,158,903 | +2.0% |
| 28 APR 2021 | C0000115172B01 | Bristol | Bridge rehabilitation over rte 52 & i-81 | 1 of 3 | $1,429,360 | Low, 14% under the second |
| 24 FEB 2021 | C0000104828B73 | Bristol | Bridge replacement over laurel creek | 3 of 3 | $1,466,977 | +19% |
| 24 FEB 2021 | C0000117348B63 | Bristol | Stp-br01 (366)0622-086-841, b663 | 3 of 3 | $1,645,223 | +33% |
| 22 APR 2020 | C0000094725B58 | Salem | Bridge replacement over craig branch | 1 of 3 | $971,649 | Low, 4.0% under the second |
| 26 FEB 2020 | C0000097709B63 | Salem | Bridge replacement over south fork roanoke river | 2 of 3 | $1,764,716 | 0.0% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.