VDOT contract C0000117111B62 bid tabulation
Sgr - bridge replacement. Let by Virginia DOT on June 24, 2026, Wythe, Bristol. 3 bids received; low bid $1,627,637 by King General Contractors, Inc..
- Owner
- Virginia DOT
- Letting
- 24 JUN 2026
- Pay items
- 51
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | King General Contractors, Inc. | $1,627,637 | Low |
| 2 | Crossroads Bridge Inc | $1,905,119 | +17% |
| 3 | Jones Road & Bridge, Inc. | $1,953,410 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. King General Contractors, Inc. | 2. Crossroads Bridge Inc | 3. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $51,120 | $30,000 | $50,000 |
| 0001-0020 | Regular excavation (303SD20-0001) | CY | 165 | $83.07 | $220.00 | $60.00 |
| 0001-0030 | Erosion control mulch (303SD20-0019) | SY | 472 | $0.96 | $1.00 | $5.00 |
| 0001-0040 | Dewatering basin EC-8 (303SD20-0028) | EACH | 2 | $1,635.84 | $6,000.00 | $10,000 |
| 0001-0050 | Siltation control excavation (303SD20-0029) | CY | 12.70 | $5.75 | $0.01 | $40.00 |
| 0001-0060 | Temp. silt fence type B (303SD20-0033) | LF | 381 | $14.70 | $7.00 | $12.00 |
| 0001-0070 | Rock excavation (303SX20-0005) | CY | 50 | $334.84 | $100.00 | $200.00 |
| 0001-0080 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 270 | $168.70 | $90.00 | $60.00 |
| 0001-0090 | Aggr. matl. no. 1 (309SD20-0001) | TON | 52 | $154.00 | $110.00 | $65.00 |
| 0001-0100 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 57 | $605.07 | $600.00 | $600.00 |
| 0001-0110 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 50 | $14.06 | $9.00 | $10.00 |
| 0001-0120 | Structure excavation const. (401SD20-0001) | CY | 570 | $76.68 | $100.00 | $100.00 |
| 0001-0130 | Select backfill abutment zone (401SD20-0002) | TON | 570 | $77.32 | $70.00 | $60.00 |
| 0001-0140 | Geocomposite wall drain (401SD20-0004) | SY | 60 | $74.89 | $40.00 | $30.00 |
| 0001-0150 | Pipe underdrain 6" const. (401SD20-0005) | LF | 50 | $46.65 | $40.00 | $50.00 |
| 0001-0160 | Cofferdam (401SD20-0007) | EACH | 2 | $47,925 | $120,000 | $65,000 |
| 0001-0170 | NS temp support of excavation temporary support of excavation (402SX20-0002) | LS | 1 | $92,655 | $250,000 | $30,000 |
| 0001-0180 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 161 | $812.53 | $1,650.00 | $2,000.00 |
| 0001-0190 | Reinforcing steel substruct. const. (406SD20-0006) | LB | 11,540 | $4.58 | $2.50 | $7.00 |
| 0001-0200 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 7,690 | $5.47 | $3.85 | $7.00 |
| 0001-0210 | NS bridge superstructure precast concrete slabs 3.375' X 21" X 31' (410SX20-0007) | LS | 1 | $537,234 | $415,000 | $615,000 |
| 0001-0220 | NS bridge incidentals construction access (410SX20-0014) | LS | 1 | $23,217 | $60,000 | $65,000 |
| 0001-0230 | NS dism. & rem. exist. STR. VA. STR. no. 6275 (413SX20-0002) | LS | 1 | $37,062 | $55,000 | $50,000 |
| 0001-0240 | Dry riprap CL.I 26" (414SD20-0012) | TON | 63 | $130.82 | $100.00 | $100.00 |
| 0001-0250 | Dry riprap CL.II 24" (414SD20-0014) | TON | 380 | $132.09 | $100.00 | $150.00 |
| 0001-0260 | Waterproofing – epoxy resin type EP-3B/EP-3T (416SD20-0003) | SY | 70 | $93.29 | $120.00 | $75.00 |
| 0001-0270 | Waterproofing membrane type III (429SD20-0004) | SY | 26 | $55.27 | $100.00 | $100.00 |
| 0001-0280 | Guardrail, thrie beam (505SD20-0074) | LF | 231 | $108.63 | $85.00 | $300.00 |
| 0001-0290 | High visibility fence, 4 feet (507SD20-0027) | LF | 365 | $11.26 | $6.00 | $5.00 |
| 0001-0300 | Demo. of pavement flexible (508SD20-0004) | SY | 31 | $47.93 | $90.00 | $35.00 |
| 0001-0310 | Maintenance of traffic (structure no. 6275) (512SP20-0002) | LS | 1 | $34,123 | $25,000 | $30,000 |
| 0001-0320 | Mobilization (513SD20-0001) | LS | 1 | $121,410 | $126,000 | $107,000 |
| 0001-0330 | Construction surveying constr. (517SD20-0001) | LS | 1 | $38,340 | $25,000 | $50,000 |
| 0001-0340 | Topsoil class A (602SD20-0002) | CY | 4 | $231.32 | $100.00 | $100.00 |
| 0001-0350 | Topsoil class B (602SD20-0004) | CY | 4 | $263.27 | $100.00 | $200.00 |
| 0001-0360 | Temporary seed (603SD20-0002) | LB | 150 | $27.53 | $17.00 | $20.00 |
| 0001-0370 | Regular seed (603SD20-0003) | LB | 21 | $23.06 | $17.00 | $20.00 |
| 0001-0380 | Overseeding (603SD20-0004) | LB | 17 | $23.06 | $12.00 | $20.00 |
| 0001-0390 | Legume seed (603SD20-0005) | LB | 1 | $34.57 | $25.00 | $50.00 |
| 0001-0400 | Legume overseeding (603SD20-0006) | LB | 1 | $34.57 | $18.00 | $50.00 |
| 0001-0410 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 424 | $1.15 | $1.00 | $1.00 |
| 0001-0420 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 5,022 | $1.44 | $1.10 | $1.00 |
| 0001-0430 | Sediment retention roll 18" min (603SD20-0011) | LF | 108 | $20.19 | $150.00 | $10.00 |
| 0001-0440 | Fertilizer nitrogen - N (603SD20-0014) | LB | 28 | $4.32 | $3.00 | $3.00 |
| 0001-0450 | Fertilizer phosphorous - P (603SD20-0015) | LB | 25 | $4.32 | $3.00 | $3.00 |
| 0001-0460 | Fertilizer potassium - K (603SD20-0016) | LB | 25 | $4.32 | $3.00 | $3.00 |
| 0001-0470 | Lime (603SD20-0017) | TON | 2.35 | $268.92 | $170.00 | $100.00 |
| 0001-0480 | Rolled erosion CTRL product EC-2 type 3 (606SD20-0003) | SY | 235 | $9.12 | $5.50 | $3.00 |
| 0001-0490 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 197 | $49.84 | $30.00 | $30.00 |
| 0001-0500 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 15 | $817.28 | $900.00 | $500.00 |
| 0001-0510 | Sign panel (701SD20-0001) | SF | 105 | $80.51 | $50.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of June 24, 2026. Compiled by Mirage Metrics.