VDOT contract C0000116160B01 bid tabulation
Decel lane extension & bridge widening. Let by Virginia DOT on November 19, 2025, Smyth, Bristol. 3 bids received; low bid $11,793,134 by Caton Construction Group, Inc..
- Owner
- Virginia DOT
- Letting
- 19 NOV 2025
- Pay items
- 125
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Caton Construction Group, Inc. | $11,793,134 | Low |
| 2 | Crossroads Bridge Inc | $13,463,217 | +14% |
| 3 | Brayman Construction Corporation | $13,922,441 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Caton Construction Group, Inc. | 2. Crossroads Bridge Inc | 3. Brayman Construction Corporation |
|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $10,000 | $25,000 | $25,000 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 22 | $1,000.00 | $1,500.00 | $575.00 |
| 0001-0030 | Clearing and grubbing (301SD20-0001) | LS | 1 | $150,000 | $150,000 | $75,000 |
| 0001-0040 | Endwall EW-12 (302SD20-0013) | EACH | 3 | $1,450.00 | $2,000.00 | $4,000.00 |
| 0001-0050 | 15" storm sewer pipe (302SD20-0027) | LF | 39 | $155.00 | $200.00 | $210.00 |
| 0001-0060 | Drop inlet DI-13 TY.II (302SD20-0656) | EACH | 1 | $20,000 | $15,000 | $15,000 |
| 0001-0070 | Regular excavation (303SD20-0001) | CY | 4,312 | $85.00 | $75.00 | $30.00 |
| 0001-0080 | Temporary diversion dike (EC-9) (303SD20-0021) | LF | 232 | $13.00 | $20.00 | $8.00 |
| 0001-0090 | Check dam rock TY. II (303SD20-0023) | EACH | 18 | $452.50 | $625.00 | $355.00 |
| 0001-0100 | Dewatering basin EC-8 (303SD20-0028) | EACH | 4 | $3,500.00 | $5,500.00 | $5,500.00 |
| 0001-0110 | Siltation control excavation (303SD20-0029) | CY | 513 | $46.00 | $0.01 | $5.00 |
| 0001-0120 | Inlet protection type A (303SD20-0030) | EACH | 4 | $380.00 | $1,000.00 | $3,000.00 |
| 0001-0130 | Inlet protection type B (303SD20-0031) | EACH | 1 | $107.00 | $1,000.00 | $3,000.00 |
| 0001-0140 | Geotextile fabric (303SD20-0032) | SY | 103 | $14.50 | $8.00 | $9.00 |
| 0001-0150 | Temp. silt fence type A (303SD20-0034) | LF | 2,984 | $5.25 | $8.00 | $40.00 |
| 0001-0160 | NS geotextile fabric (geogrid) (303SX20-0008) | SY | 5,913 | $25.50 | $17.50 | $7.00 |
| 0001-0170 | NS access road (construction access) (303SX20-0010) | LS | 1 | $25,000 | $250,000 | $325,000 |
| 0001-0180 | Utility test pit unpaved (303SX20-0012) | EACH | 3 | $2,551.00 | $1,000.00 | $3,000.00 |
| 0001-0190 | Aggr. matl. no. 1 (308SD20-0001) | TON | 29,198 | $57.75 | $62.00 | $52.00 |
| 0001-0200 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 2,703 | $65.50 | $65.00 | $52.00 |
| 0001-0210 | Tack coat (310SD20-0001) | GAL | 2,051 | $5.58 | $6.50 | $5.50 |
| 0001-0220 | Asphalt concrete TY. SM- 12.5E const (315SD20-0003) | TON | 2,698 | $178.98 | $200.00 | $176.30 |
| 0001-0230 | Asphalt concrete TY. IM- 19.0E const (315SD20-0006) | TON | 562 | $171.57 | $195.00 | $169.00 |
| 0001-0240 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 1,808 | $146.45 | $165.00 | $144.25 |
| 0001-0250 | Rumble strip cylindrical asphalt (315SD20-0015) | LF | 5,874 | $3.22 | $2.85 | $2.46 |
| 0001-0260 | Liquid asphalt coating (rumble strip) (315SD20-0016) | SY | 979 | $5.08 | $2.85 | $2.27 |
| 0001-0270 | NS saw-cut asph conc (full depth) (315SX20-0011) | LF | 4,331 | $2.21 | $8.50 | $7.00 |
| 0001-0280 | Conc. CL. A4 bridge appr. slab const. (316SD20-0035) | CY | 164.10 | $657.50 | $1,100.00 | $1,100.00 |
| 0001-0290 | Reinf. steel bridge appr. slab const. (316SD20-0036) | LB | 29,290 | $4.00 | $4.50 | $3.00 |
| 0001-0300 | Structure excavation const. (401SD20-0001) | CY | 320 | $50.00 | $50.00 | $20.00 |
| 0001-0310 | Select backfill abutment zone (401SD20-0002) | TON | 1,266 | $54.50 | $72.00 | $55.00 |
| 0001-0320 | Geocomposite wall drain (401SD20-0004) | SY | 176 | $75.25 | $40.00 | $87.00 |
| 0001-0330 | Pipe underdrain 6" const. (401SD20-0005) | LF | 199 | $20.00 | $42.00 | $40.00 |
| 0001-0340 | NS bridge substructure (temporary shoring) (401SX20-0011) | LS | 1 | $625,000 | $1,500,000 | $1,725,000 |
| 0001-0350 | Steel piles 12" (403SD20-0006) | LF | 1,134 | $120.00 | $125.00 | $250.00 |
| 0001-0360 | NS preboring pile for steel piles (403SX20-0016) | LF | 352 | $638.72 | $520.00 | $190.00 |
| 0001-0370 | Conc. CL. A4 mod. low shrink., SPR. struct. const. (404SD20-0005) | CY | 396.10 | $1,540.00 | $1,450.00 | $2,100.00 |
| 0001-0380 | Bridge deck grooving const. (404SD20-0009) | SY | 1,176 | $6.75 | $11.00 | $5.75 |
| 0001-0390 | Cover depth survey const. (404SD20-0010) | SY | 868 | $7.42 | $10.00 | $7.42 |
| 0001-0400 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 54.41 | $1,300.00 | $1,500.00 | $2,800.00 |
| 0001-0410 | NS elastic inclusion 15" (404SP20-0004) | SY | 27 | $875.00 | $960.00 | $1,200.00 |
| 0001-0420 | Prest.conc.beam,bulb- T69"DPTH +110'-120' (405SD20-0072) | EACH | 6 | $119,495 | $85,000 | $70,000 |
| 0001-0430 | CR reinf. steel CL. III SPR. struct. const. (406SD20-0005) | LB | 63,890 | $6.00 | $5.20 | $5.00 |
| 0001-0440 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 7,760 | $4.00 | $3.75 | $5.00 |
| 0001-0450 | Concrete parapet BPB-4 (410SD20-0056) | LF | 244 | $530.00 | $560.00 | $700.00 |
| 0001-0460 | NS architectural treatment for MSE panels (410SX20-0001) | SY | 1,009 | $38.03 | $60.00 | $40.00 |
| 0001-0470 | NS env. prot. & health & safety NS environmental protection and health and safety (411SX20-0005) | LS | 1 | $50,000 | $17,500 | $70,000 |
| 0001-0480 | NS dism. & rem. exist. STR. NS dismantle and remove existing structure (STR. no. 2804) (413SX20-0002) | LS | 1 | $269,856 | $275,000 | $290,000 |
| 0001-0490 | NS material disposal NS disposal of material (413SX20-0004) | LS | 1 | $35,500 | $1,750.00 | $70,000 |
| 0001-0500 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 3 | $132.50 | $200.00 | $500.00 |
| 0001-0510 | Dry riprap CL. AI (414SD20-0007) | SY | 103 | $92.75 | $92.00 | $140.00 |
| 0001-0520 | Dry riprap CL.II 38" (414SD20-0057) | TON | 249 | $85.00 | $92.00 | $100.00 |
| 0001-0530 | Conc. slab slope protection 4" (415SD20-0004) | SY | 165 | $190.00 | $200.00 | $400.00 |
| 0001-0540 | NS BRG. conduit system (bridge) (419SX20-0008) | LS | 1 | $53,367 | $15,000 | $35,000 |
| 0001-0550 | Underdrain UD-4 (501SD20-0004) | LF | 482 | $33.25 | $42.00 | $25.00 |
| 0001-0560 | Outlet pipe (501SD20-0009) | LF | 14 | $83.46 | $52.00 | $100.00 |
| 0001-0570 | Paved ditch PG-6A (502SD20-0006) | SY | 59 | $120.00 | $200.00 | $500.00 |
| 0001-0580 | Curb, STD. CG-3 (502SD20-0014) | LF | 109 | $65.14 | $75.00 | $130.00 |
| 0001-0590 | Concrete class A3 misc. (504SD20-0001) | CY | 0.52 | $5,068.00 | $4,800.00 | $10,500 |
| 0001-0600 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 2 | $1,500.00 | $1,000.00 | $500.00 |
| 0001-0610 | Guardrail GR-MGS1 (505SD20-0011) | LF | 1,382 | $27.00 | $32.00 | $32.00 |
| 0001-0620 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 330 | $48.00 | $55.00 | $42.00 |
| 0001-0630 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 2 | $5,000.00 | $5,700.00 | $3,500.00 |
| 0001-0640 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 1 | $2,000.00 | $2,250.00 | $1,500.00 |
| 0001-0650 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 3 | $2,000.00 | $2,250.00 | $1,500.00 |
| 0001-0660 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 4 | $5,000.00 | $5,700.00 | $4,000.00 |
| 0001-0670 | Remove existing guardrail (505SD20-0073) | LF | 2,354 | $3.50 | $5.00 | $5.00 |
| 0001-0680 | NS guardrail (ST'D BR-GR- 4D) (505SX20-0057) | LF | 200 | $200.00 | $250.00 | $350.00 |
| 0001-0690 | NS wall mechanically stabilized earth wall (506SX20-0002) | SF | 11,397 | $198.50 | $200.00 | $260.00 |
| 0001-0700 | Fence FE-W1 (507SD20-0001) | LF | 435 | $20.00 | $60.00 | $30.00 |
| 0001-0710 | Line brace unit FE-W1 or FE-W2 (507SD20-0003) | EACH | 4 | $1,500.00 | $1,350.00 | $250.00 |
| 0001-0720 | Corner brace unit FE-W1 or FE-W2 (507SD20-0004) | EACH | 2 | $1,500.00 | $1,350.00 | $250.00 |
| 0001-0730 | Demo. of pavement flexible (508SD20-0004) | SY | 5,166 | $28.00 | $18.00 | $13.00 |
| 0001-0740 | NS remove exist. fence (roadway) (510SX20-0016) | LF | 763 | $7.00 | $5.00 | $28.00 |
| 0001-0750 | Allaying dust (511SD20-0001) | HR | 90 | $157.50 | $0.01 | $80.00 |
| 0001-0760 | Traffic barrier service MB-11A (512SD20-0003) | LF | 4,021 | $57.80 | $75.00 | $60.16 |
| 0001-0770 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 4 | $10,000 | $30,000 | $9,500.00 |
| 0001-0780 | Impact atten.ser. TY. I TL-2, <40 MPH (512SD20-0008) | EACH | 4 | $8,500.00 | $23,000 | $7,500.00 |
| 0001-0790 | Type 3 barricade 8' (512SD20-0013) | EACH | 2 | $275.00 | $700.00 | $1,500.00 |
| 0001-0800 | Temporary sign (512SD20-0014) | SF | 5,410 | $16.00 | $38.00 | $21.00 |
| 0001-0810 | Truck mounted attenuator (512SD20-0023) | HR | 2,264 | $20.00 | $45.00 | $20.83 |
| 0001-0820 | Group 2 channelizing devices (512SD20-0024) | DAY | 14,308 | $0.15 | $4.00 | $10.00 |
| 0001-0830 | Port.changeable mess. sign (512SD20-0025) | HR | 672 | $3.75 | $25.00 | $20.00 |
| 0001-0840 | Electronic arrow board (512SD20-0026) | HR | 1,160 | $3.25 | $5.50 | $5.21 |
| 0001-0850 | Flagger service (512SD20-0027) | HR | 4,000 | $54.00 | $35.00 | $65.00 |
| 0001-0860 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 5,995 | $1.50 | $1.80 | $1.50 |
| 0001-0870 | Temp. pave. marker 1 way (512SD20-0044) | EACH | 301 | $12.00 | $15.00 | $12.00 |
| 0001-0880 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 9,700 | $3.42 | $4.00 | $3.52 |
| 0001-0890 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 11,649 | $4.48 | $5.10 | $4.48 |
| 0001-0900 | Mobilization (513SD20-0001) | LS | 1 | $589,800 | $698,000 | $700,000 |
| 0001-0910 | Field office TY.I (514SD20-0001) | MO | 22 | $3,355.00 | $5,000.00 | $3,000.00 |
| 0001-0920 | Flexible pave.planing 0"-2" (515SD20-0013) | SY | 7,926 | $2.84 | $8.00 | $6.65 |
| 0001-0930 | Construction surveying constr. (517SD20-0001) | LS | 1 | $36,000 | $85,000 | $200,000 |
| 0001-0940 | Topsoil class A (3 in.) (602SD20-0002) | CY | 404 | $110.00 | $145.00 | $30.00 |
| 0001-0950 | Topsoil class B (3 in.) (602SD20-0004) | CY | 404 | $225.00 | $165.00 | $65.00 |
| 0001-0960 | Temporary seed (603SD20-0002) | LB | 300 | $15.00 | $20.00 | $15.00 |
| 0001-0970 | Regular seed (603SD20-0003) | LB | 425 | $16.00 | $20.00 | $16.00 |
| 0001-0980 | Overseeding (603SD20-0004) | LB | 340 | $16.00 | $16.00 | $16.00 |
| 0001-0990 | Legume seed (603SD20-0005) | LB | 13 | $25.00 | $30.00 | $25.00 |
| 0001-1000 | Legume overseeding (603SD20-0006) | LB | 10 | $25.00 | $25.00 | $25.00 |
| 0001-1010 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 6,050 | $0.85 | $1.00 | $0.85 |
| 0001-1020 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 9,680 | $1.00 | $1.20 | $1.00 |
| 0001-1030 | Hydraulic erosion control product type 4 (603SD20-0010) | SY | 6,050 | $1.25 | $1.50 | $1.25 |
| 0001-1040 | Fertilizer nitrogen - N (603SD20-0014) | LB | 200 | $2.00 | $2.50 | $2.00 |
| 0001-1050 | Fertilizer phosphorous - P (603SD20-0015) | LB | 140 | $2.00 | $2.50 | $2.00 |
| 0001-1060 | Fertilizer potassium - K (603SD20-0016) | LB | 140 | $2.00 | $2.50 | $2.00 |
| 0001-1070 | Lime (603SD20-0017) | TON | 11 | $140.00 | $165.00 | $140.00 |
| 0001-1080 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 425 | $4.50 | $5.20 | $4.50 |
| 0001-1090 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 3 | $375.00 | $400.00 | $375.00 |
| 0001-1100 | Remove existing 2 post sign structure (700SD20-0004) | EACH | 2 | $750.00 | $600.00 | $750.00 |
| 0001-1110 | Via sign post W14 X 26 (700SD20-0025) | LF | 48 | $300.00 | $350.00 | $250.00 |
| 0001-1120 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 31 | $18.00 | $42.00 | $18.00 |
| 0001-1130 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 28 | $22.00 | $52.00 | $22.00 |
| 0001-1140 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 14 | $20.00 | $48.00 | $20.00 |
| 0001-1150 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 3 | $592.00 | $1,000.00 | $592.00 |
| 0001-1160 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 2 | $994.00 | $1,650.00 | $994.00 |
| 0001-1170 | Conc. found. SSP-via, 3' dia. X 7' deep (700SD20-0049) | EACH | 2 | $6,235.30 | $8,500.00 | $12,000 |
| 0001-1180 | Junction box JB-S4 (700SD20-0180) | EACH | 4 | $8,301.60 | $10,000 | $700.00 |
| 0001-1190 | Conduit PVC 2" (700SD20-0194) | LF | 100 | $5.94 | $7.00 | $50.00 |
| 0001-1200 | Sign panel (701SD20-0001) | SF | 203 | $28.00 | $50.00 | $60.00 |
| 0001-1210 | Type B class VI PVMT line MRKG 6" (704SD20-0027) | LF | 4,867 | $7.09 | $8.00 | $7.09 |
| 0001-1220 | Type B class VI PVMT line MRKG 12" (704SD20-0029) | LF | 346 | $11.99 | $15.00 | $11.99 |
| 0001-1230 | Type B class VI contrast PVMT line MRKG 6" (704SD20-0031) | LF | 415 | $12.33 | $15.00 | $12.33 |
| 0001-1240 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 48 | $135.42 | $155.00 | $135.42 |
| 0001-1250 | Removal of SRPM (704SP20-0001) | EACH | 29 | $35.99 | $20.00 | $94.61 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.