VDOT contract C0000121000D04 bid tabulation
Culvert rehabilitation. Let by Virginia DOT on December 17, 2025, Carroll, Salem. 2 bids received; low bid $3,040,970 by Crossroads Bridge Inc.
- Owner
- Virginia DOT
- Letting
- 17 DEC 2025
- Pay items
- 39
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crossroads Bridge Inc | $3,040,970 | Low |
| 2 | Curtis Contracting, Inc. | $5,518,774 | +81% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crossroads Bridge Inc | 2. Curtis Contracting, Inc. |
|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $100,000 | $132,077 |
| 0001-0020 | Grading (303SD20-0004) | LS | 1 | $250,000 | $651,769 |
| 0001-0030 | Check dam rock TY. II (303SD20-0023) | EACH | 15 | $700.00 | $542.98 |
| 0001-0040 | Dewatering basin EC-8 (303SD20-0028) | EACH | 16 | $5,200.00 | $4,426.47 |
| 0001-0050 | Siltation control excavation (303SD20-0029) | CY | 306 | $0.01 | $5.97 |
| 0001-0060 | Temp. silt fence type A (303SD20-0034) | LF | 1,763 | $7.00 | $14.53 |
| 0001-0070 | Cofferdam (401SD20-0007) | EACH | 16 | $27,500 | $14,000 |
| 0001-0080 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 8 | $8,500.00 | $13,242 |
| 0001-0090 | Concrete class A3 substruct. maint. undermining repair (404SD20-0021) | CY | 4 | $3,000.00 | $9,905.82 |
| 0001-0100 | Reinforcing steel substruct. maint. (406SD20-0019) | LB | 34 | $25.00 | $142.64 |
| 0001-0110 | Crack repair type B (412SD20-0013) | LF | 955 | $64.00 | $269.94 |
| 0001-0120 | Concrete substruct. surface repair (412SD20-0061) | SY | 573.20 | $1,850.00 | $4,931.21 |
| 0001-0130 | NS BR. substr. wid./repair culvert debris removal (STR. 04574) (412SX20-0022) | LS | 1 | $35,000 | $132,077 |
| 0001-0140 | NS BR. substr. wid./repair culvert debris removal (STR. 04591) (412SX20-0022) | LS | 1 | $85,000 | $132,077 |
| 0001-0150 | NS BR. substr. wid./repair culvert debris removal (STR. 04592) (412SX20-0022) | LS | 1 | $150,000 | $66,039 |
| 0001-0160 | NS BR. substr. wid./repair culvert debris removal (STR. 04593) (412SX20-0022) | LS | 1 | $30,000 | $66,039 |
| 0001-0170 | Erosion CTRL. stone CL. II, EC-1 (414SD20-0005) | TON | 428.90 | $100.00 | $495.27 |
| 0001-0180 | Guardrail GR-2 (505SD20-0030) | LF | 100 | $120.00 | $65.71 |
| 0001-0190 | Remove existing guardrail (505SD20-0073) | LF | 200 | $12.00 | $18.15 |
| 0001-0200 | Fence FE-W1 (507SD20-0001) | LF | 200 | $70.00 | $99.06 |
| 0001-0210 | Line brace unit FE-W1 or FE-W2 (507SD20-0003) | EACH | 2 | $1,750.00 | $660.39 |
| 0001-0220 | Corner brace unit FE-W1 or FE-W2 (507SD20-0004) | EACH | 1 | $1,750.00 | $660.39 |
| 0001-0230 | NS reset exist. guardrail various locations (510SX20-0017) | LF | 100 | $80.00 | $75.01 |
| 0001-0240 | Temporary sign (512SD20-0014) | SF | 200 | $40.00 | $59.43 |
| 0001-0250 | Truck mounted attenuator (512SD20-0023) | HR | 5,760 | $30.00 | $6.60 |
| 0001-0260 | Group 2 channelizing devices (512SD20-0024) | DAY | 3,600 | $7.00 | $2.80 |
| 0001-0270 | Flagger service (512SD20-0027) | HR | 3,600 | $20.00 | $9.72 |
| 0001-0280 | Mobilization (513SD20-0001) | LS | 1 | $180,000 | $300,000 |
| 0001-0290 | Topsoil class B (602SD20-0004) | CY | 424 | $150.00 | $193.58 |
| 0001-0300 | Temporary seed (603SD20-0002) | LB | 231 | $20.00 | $26.42 |
| 0001-0310 | Regular seed (603SD20-0003) | LB | 313 | $20.00 | $26.42 |
| 0001-0320 | Overseeding (603SD20-0004) | LB | 250 | $16.00 | $26.42 |
| 0001-0330 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 4,538 | $1.20 | $1.32 |
| 0001-0340 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 6,595 | $1.50 | $1.32 |
| 0001-0350 | Fertilizer nitrogen - N (603SD20-0014) | LB | 101 | $2.50 | $6.60 |
| 0001-0360 | Fertilizer phosphorous - P (603SD20-0015) | LB | 71 | $2.50 | $6.60 |
| 0001-0370 | Fertilizer potassium - K (603SD20-0016) | LB | 71 | $2.50 | $6.60 |
| 0001-0380 | Lime (603SD20-0017) | TON | 5.60 | $175.00 | $396.23 |
| 0001-0390 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 765 | $6.00 | $6.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of December 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.