Curtis Contracting, Inc.: VDOT bid record
Curtis Contracting, Inc. submitted 292 bids on Virginia DOT contracts in the data, from 26 FEB 2002 to 23 SEP 2026, and was the low bidder on 99 of them (34%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $267,004,927
- Latest bid
- 23 SEP 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 3 | 1 | 33% |
| 2003 | 6 | 1 | 17% |
| 2004 | 11 | 5 | 45% |
| 2005 | 2 | 0 | 0% |
| 2006 | 6 | 2 | 33% |
| 2007 | 3 | 1 | 33% |
| 2008 | 13 | 5 | 38% |
| 2009 | 3 | 1 | 33% |
| 2010 | 7 | 2 | 29% |
| 2011 | 11 | 5 | 45% |
| 2012 | 11 | 4 | 36% |
| 2013 | 15 | 5 | 33% |
| 2014 | 11 | 7 | 64% |
| 2015 | 18 | 9 | 50% |
| 2016 | 23 | 8 | 35% |
| 2017 | 23 | 7 | 30% |
| 2018 | 31 | 13 | 42% |
| 2019 | 22 | 10 | 45% |
| 2020 | 33 | 6 | 18% |
| 2021 | 23 | 4 | 17% |
| 2025 | 3 | 0 | 0% |
| 2026 | 14 | 3 | 21% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Hampton Roads | 156 | 52 | 33% |
| Richmond | 64 | 25 | 39% |
| Fredericksburg | 39 | 12 | 31% |
| Culpeper | 11 | 3 | 27% |
| Lynchburg | 6 | 2 | 33% |
| Northern Virginia | 6 | 1 | 17% |
| Staunton | 5 | 2 | 40% |
| Salem | 4 | 1 | 25% |
| Bristol | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS pipe pipe rehabilitation 30" category A or B | 302SX20-0013 | LF | 426 | 259 (61%) | $461.00 | $450.00 |
| NS guardrail post leave out | 505SX20-0058 | EACH | 578 | 194 (34%) | $357.57 | $250.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 102 | 64 (63%) | $0.89 | $1.00 |
| NS guardrail radial thrie beam rail | 505SX20-0057 | LF | 172 | 63 (37%) | $23.18 | $25.00 |
| Flagger service | 512SD20-0027 | HR | 101 | 43 (43%) | $25.00 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 114 | 38 (33%) | $3.80 | $3.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 105 | 38 (36%) | $36.00 | $20.00 |
| Electronic arrow board | 512SD20-0026 | HR | 101 | 37 (37%) | $5.77 | $5.00 |
| NS traffic sign solar powered sequential dynamic curve warning system (chevron) | 700SX20-0021 | EACH | 70 | 37 (53%) | $38,917 | $17,950 |
| Guardrail GR-2 | 505SD20-0030 | LF | 63 | 34 (54%) | $17.57 | $18.00 |
| Agr. base mat. TY.I or II no. 21A or 21B | 305SP20-0003 | TON | 61 | 34 (56%) | $40.95 | $33.78 |
| Guardrail terminal GR- MGS2 | 505SD20-0017 | EACH | 46 | 33 (72%) | $2,556.36 | $3,400.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Branscome Inc. | 34 | 14 of 34 |
| L. S. Lee, Inc. | 33 | 20 of 33 |
| Allan Myers Va, Inc. | 31 | 20 of 31 |
| Denton Concrete Services Company | 28 | 20 of 28 |
| Howard Brothers Contractor, Inc. | 25 | 14 of 25 |
| Makco, Incorporated | 19 | 3 of 19 |
| M. D. Miller Co., Inc. | 19 | 14 of 19 |
| Burleigh Construction Co., Inc. | 12 | 9 of 12 |
| Lanford Brothers Company, Incorporated | 11 | 9 of 11 |
| Adams Construction Company | 11 | 5 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | C0000119597C01B | Richmond | Smart scale - safety improvements | 1 of 1 | $5,992,427 | Low |
| 23 SEP 2026 | C0000123290C01 | Richmond | Roundabout | 2 of 5 | $5,132,377 | +1.0% |
| 26 AUG 2026 | C0000115512C01 | Hampton Roads | Smart scale - shared use path | 2 of 3 | $6,474,766 | +6.0% |
| 22 JUL 2026 | C0000129036N01 | Hampton Roads | On call - guardrail hits repair | 2 of 3 | $393,911 | +16% |
| 27 MAY 2026 | C0000123889C01B | Fredericksburg | Smart scale - intersection improvements / r-cuts | 3 of 3 | $3,850,221 | +34% |
| 27 MAY 2026 | C0000113412C01B | Fredericksburg | Intersection improvement | 4 of 4 | $3,499,093 | +20% |
| 25 MAR 2026 | CM526PMT127804B | Hampton Roads | 2026 concrete repair - interstate | 2 of 2 | $3,473,325 | +41% |
| 25 MAR 2026 | CM526PMP127782B | Hampton Roads | 2026 concrete repair - interstate | 2 of 2 | $8,986,981 | +44% |
| 25 MAR 2026 | C0000128009N01 | Hampton Roads | On-call guardrail repairs and replacement | 1 of 3 | $826,781 | Low, 17% under the second |
| 25 FEB 2026 | C0000117418B28 | Hampton Roads | Bridge rehabilitation | 3 of 4 | $2,889,865 | +52% |
| 04 FEB 2026 | C0000126720N01 | Fredericksburg | On-call concrete repairs | 2 of 3 | $1,852,400 | +46% |
| 04 FEB 2026 | C0000126721N01 | Fredericksburg | On-call joint repair | 2 of 4 | $1,442,750 | +20% |
| 04 FEB 2026 | C0000127189N01 | Hampton Roads | On-call structural repair | 2 of 2 | $4,488,236 | 0.0% |
| 14 JAN 2026 | CM526PMZ128165 | Hampton Roads | 2026 concrete repair - primary | 1 of 2 | $8,433,021 | Low, 28% under the second |
| 17 DEC 2025 | C0000126242N01 | Fredericksburg | On-call guardrail replacement | 2 of 3 | $823,525 | +15% |
| 17 DEC 2025 | C0000107430C01 | Hampton Roads | Soundwall repair | 3 of 4 | $6,233,542 | +8.0% |
| 17 DEC 2025 | C0000121000D04 | Salem | Culvert rehabilitation | 2 of 2 | $5,518,774 | +81% |
| 15 DEC 2021 | C0000120041N01 | Hampton Roads | On-call guardrail hits repair | 1 of 3 | $335,758 | Low, 16% under the second |
| 17 NOV 2021 | C0000106670C01 | Fredericksburg | Smart scale - roadway widening | 3 of 3 | $14,516,870 | +36% |
| 17 NOV 2021 | C0000119105N01 | Fredericksburg | On-call signs & structures replacement | 2 of 3 | $1,760,665 | +2.0% |
| 17 NOV 2021 | C0000119252N01 | Fredericksburg | On-call guardrail replacement | 3 of 3 | $1,286,730 | +33% |
| 17 NOV 2021 | C0000119505N01 | Hampton Roads | On-call structural repairs (williamsburg / franklin) | 3 of 3 | $2,832,525 | +68% |
| 17 NOV 2021 | CM521000118502 | Hampton Roads | Nhpp-pm05(473)9999-046-730, c501 | 3 of 3 | $777,517 | +41% |
| 27 OCT 2021 | C0000118978N01 | Northern Virginia | On-call bridge maintenance | 3 of 3 | $4,304,000 | +80% |
| 27 OCT 2021 | C0000119068B29 | Hampton Roads | Bridge rehab. over blackwater river | 1 of 3 | $2,871,963 | Low, 0.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.