Howard Brothers Contractor, Inc.: VDOT bid record

Howard Brothers Contractor, Inc. submitted 126 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 28 OCT 2026, and was the low bidder on 56 of them (44%). When it was not low, its total sat a median +14% above the low bid.

Owner
Virginia DOT
Low bid volume
$40,830,902
Latest bid
28 OCT 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

126Bids
56Low bids
44Win rate, percent
+14%Median gap to the low bid when not low, 70 bids

By year

YearBidsLow bidsWin rate
200210660%
200312542%
200411545%
2005100%
200611100%
20077343%
20087229%
20097457%
201013431%
20114125%
201210770%
20137457%
20145240%
20156350%
20164250%
20173133%
20183267%
20192150%
20204375%
2021500%
2026400%
Howard Brothers Contractor, Inc., VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Hampton Roads471634%
Richmond462350%
Fredericksburg311652%
Culpeper2150%
Howard Brothers Contractor, Inc., VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Aggr. base matl. TY. I no. 21B308SD20-0012TON8141 (51%)$28.00$26.00
Check dam rock TY. II303SD20-0023EACH8041 (51%)$150.00$250.00
NS traffic signalization APS pedestrian actuation (PA-2)700SX20-0010EACH6939 (57%)$2,100.00$2,000.00
Lime603SD20-0017TON7738 (49%)$260.00$200.00
Temporary sign512SD20-0014SF7238 (53%)$15.00$20.00
Overseeding603SD20-0004LB4137 (90%)$1.00$5.00
Regular seed603SD20-0003LB8032 (40%)$15.00$13.50
Temp. silt fence type A303SD20-0034LF6430 (47%)$2.50$3.00
Group 2 channelizing devices512SD20-0024DAY5029 (58%)$0.50$1.00
NS saw-cut asph conc full depth315SX20-0011LF6125 (41%)$3.00$5.00
Demo. of pavement flexible508SD20-0004SY4621 (46%)$6.50$9.00
Asphalt concrete TY. IM-19.0A315SD20-0004TON3419 (56%)$89.50$98.85
Howard Brothers Contractor, Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Curtis Contracting, Inc.2511 of 25
J. L. Kent & Sons, Inc.208 of 20
Branscome Inc.155 of 15
George Nice & Sons, Inc.155 of 15
Henry S. Branscome, L.L.C.147 of 14
Blakemore Construction Corporation124 of 12
Ultra Services, Inc.85 of 8
The Blair Brothers, Inc.73 of 7
Abernathy Construction Corporation64 of 6
E. V. Williams, Inc.62 of 6
Howard Brothers Contractor, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026C0000128987B24FredericksburgBridge scour rehabilitation3 of 3$1,593,465+45%
26 AUG 2026C0000115512C01Hampton RoadsSmart scale - shared use path3 of 3$7,492,955+23%
27 MAY 2026C0000113412C01BFredericksburgIntersection improvement2 of 4$3,166,254+9.0%
04 FEB 2026C0000122528N01Hampton RoadsCulvert replacement4 of 6$2,267,444+120%
15 DEC 2021C0000112638C01Hampton RoadsCurve safety improvements2 of 2$812,683+22%
27 OCT 2021C000110902M501FredericksburgSmart scale - intersection improvements3 of 3$794,653+10%
28 JUL 2021C0000092652M01RichmondSmart scale - shoulder widening & pavement overlay2 of 3$3,014,318+35%
23 JUN 2021C000111683M501FredericksburgSharon road and loretta road park and rides3 of 3$691,199+55%
26 MAY 2021C0000111278B17RichmondBridge scour protection2 of 2$1,978,748+2.0%
21 OCT 2020C0000082892M01RichmondSight distance improvement and trench widening1 of 3$464,284Low, 20% under the second
22 APR 2020C0000109471C01FredericksburgSmart scale - intersection improvements3 of 3$947,095+25%
25 MAR 2020C0000109466M01FredericksburgSmart scale - intersection improvements1 of 3$1,399,908Low, 0.0% under the second
25 MAR 2020C0000109468M01FredericksburgSmart scale - pedestrian improvements1 of 3$601,608Low, 2.0% under the second
18 DEC 2019C0000082849M01RichmondSmart scale - intersection improvement2 of 3$1,680,150+13%
18 DEC 2019C0000097688C01RichmondConstruct shared-use path1 of 3$932,318Low, 0.0% under the second
25 JUL 2018C0000109578N01FredericksburgSmart scale - improve rappahannock college site access1 of 2$368,027Low, 48% under the second
28 MAR 2018C0000104847C01RichmondRte 156 - add left turn lane3 of 3$618,006+6.0%
24 JAN 2018C0000104337C01Hampton RoadsHsip-5a03(652)(nfo)0143-099-s31, c5011 of 3$997,342Low, 7.0% under the second
15 NOV 2017C0000106841N01Hampton RoadsPipe culvert repairs3 of 3$1,056,063+28%
25 OCT 2017C000102948M01BHampton RoadsRte 199 intersection improvements at brookwood drive3 of 3$359,999+1.0%
23 AUG 2017C00087865C01CFredericksburgRoute 14-drainage improvements at mathews courthouse1 of 3$2,032,350Low, 10% under the second
21 DEC 2016C000085337C01RichmondRte 609 reconstruction1 of 3$889,792Low, 5.0% under the second
16 NOV 2016C00059166C502RichmondRte. 607 minor widening1 of 3$928,170Low, 15% under the second
27 JUL 2016C000106842N501Hampton RoadsSlope repair projects2 of 2$617,938+30%
03 FEB 2016C00090930M01RichmondRte. 613 - widening2 of 3$377,689+12%
Howard Brothers Contractor, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy