Howard Brothers Contractor, Inc. submitted 126 bids on Virginia DOT contracts in the data, from 29 JAN 2002 to 28 OCT 2026, and was the low bidder on 56 of them (44%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $40,830,902
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 10 | 6 | 60% |
| 2003 | 12 | 5 | 42% |
| 2004 | 11 | 5 | 45% |
| 2005 | 1 | 0 | 0% |
| 2006 | 1 | 1 | 100% |
| 2007 | 7 | 3 | 43% |
| 2008 | 7 | 2 | 29% |
| 2009 | 7 | 4 | 57% |
| 2010 | 13 | 4 | 31% |
| 2011 | 4 | 1 | 25% |
| 2012 | 10 | 7 | 70% |
| 2013 | 7 | 4 | 57% |
| 2014 | 5 | 2 | 40% |
| 2015 | 6 | 3 | 50% |
| 2016 | 4 | 2 | 50% |
| 2017 | 3 | 1 | 33% |
| 2018 | 3 | 2 | 67% |
| 2019 | 2 | 1 | 50% |
| 2020 | 4 | 3 | 75% |
| 2021 | 5 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Hampton Roads | 47 | 16 | 34% |
| Richmond | 46 | 23 | 50% |
| Fredericksburg | 31 | 16 | 52% |
| Culpeper | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Aggr. base matl. TY. I no. 21B | 308SD20-0012 | TON | 81 | 41 (51%) | $28.00 | $26.00 |
| Check dam rock TY. II | 303SD20-0023 | EACH | 80 | 41 (51%) | $150.00 | $250.00 |
| NS traffic signalization APS pedestrian actuation (PA-2) | 700SX20-0010 | EACH | 69 | 39 (57%) | $2,100.00 | $2,000.00 |
| Lime | 603SD20-0017 | TON | 77 | 38 (49%) | $260.00 | $200.00 |
| Temporary sign | 512SD20-0014 | SF | 72 | 38 (53%) | $15.00 | $20.00 |
| Overseeding | 603SD20-0004 | LB | 41 | 37 (90%) | $1.00 | $5.00 |
| Regular seed | 603SD20-0003 | LB | 80 | 32 (40%) | $15.00 | $13.50 |
| Temp. silt fence type A | 303SD20-0034 | LF | 64 | 30 (47%) | $2.50 | $3.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 50 | 29 (58%) | $0.50 | $1.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 61 | 25 (41%) | $3.00 | $5.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 46 | 21 (46%) | $6.50 | $9.00 |
| Asphalt concrete TY. IM-19.0A | 315SD20-0004 | TON | 34 | 19 (56%) | $89.50 | $98.85 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Curtis Contracting, Inc. | 25 | 11 of 25 |
| J. L. Kent & Sons, Inc. | 20 | 8 of 20 |
| Branscome Inc. | 15 | 5 of 15 |
| George Nice & Sons, Inc. | 15 | 5 of 15 |
| Henry S. Branscome, L.L.C. | 14 | 7 of 14 |
| Blakemore Construction Corporation | 12 | 4 of 12 |
| Ultra Services, Inc. | 8 | 5 of 8 |
| The Blair Brothers, Inc. | 7 | 3 of 7 |
| Abernathy Construction Corporation | 6 | 4 of 6 |
| E. V. Williams, Inc. | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000128987B24 | Fredericksburg | Bridge scour rehabilitation | 3 of 3 | $1,593,465 | +45% |
| 26 AUG 2026 | C0000115512C01 | Hampton Roads | Smart scale - shared use path | 3 of 3 | $7,492,955 | +23% |
| 27 MAY 2026 | C0000113412C01B | Fredericksburg | Intersection improvement | 2 of 4 | $3,166,254 | +9.0% |
| 04 FEB 2026 | C0000122528N01 | Hampton Roads | Culvert replacement | 4 of 6 | $2,267,444 | +120% |
| 15 DEC 2021 | C0000112638C01 | Hampton Roads | Curve safety improvements | 2 of 2 | $812,683 | +22% |
| 27 OCT 2021 | C000110902M501 | Fredericksburg | Smart scale - intersection improvements | 3 of 3 | $794,653 | +10% |
| 28 JUL 2021 | C0000092652M01 | Richmond | Smart scale - shoulder widening & pavement overlay | 2 of 3 | $3,014,318 | +35% |
| 23 JUN 2021 | C000111683M501 | Fredericksburg | Sharon road and loretta road park and rides | 3 of 3 | $691,199 | +55% |
| 26 MAY 2021 | C0000111278B17 | Richmond | Bridge scour protection | 2 of 2 | $1,978,748 | +2.0% |
| 21 OCT 2020 | C0000082892M01 | Richmond | Sight distance improvement and trench widening | 1 of 3 | $464,284 | Low, 20% under the second |
| 22 APR 2020 | C0000109471C01 | Fredericksburg | Smart scale - intersection improvements | 3 of 3 | $947,095 | +25% |
| 25 MAR 2020 | C0000109466M01 | Fredericksburg | Smart scale - intersection improvements | 1 of 3 | $1,399,908 | Low, 0.0% under the second |
| 25 MAR 2020 | C0000109468M01 | Fredericksburg | Smart scale - pedestrian improvements | 1 of 3 | $601,608 | Low, 2.0% under the second |
| 18 DEC 2019 | C0000082849M01 | Richmond | Smart scale - intersection improvement | 2 of 3 | $1,680,150 | +13% |
| 18 DEC 2019 | C0000097688C01 | Richmond | Construct shared-use path | 1 of 3 | $932,318 | Low, 0.0% under the second |
| 25 JUL 2018 | C0000109578N01 | Fredericksburg | Smart scale - improve rappahannock college site access | 1 of 2 | $368,027 | Low, 48% under the second |
| 28 MAR 2018 | C0000104847C01 | Richmond | Rte 156 - add left turn lane | 3 of 3 | $618,006 | +6.0% |
| 24 JAN 2018 | C0000104337C01 | Hampton Roads | Hsip-5a03(652)(nfo)0143-099-s31, c501 | 1 of 3 | $997,342 | Low, 7.0% under the second |
| 15 NOV 2017 | C0000106841N01 | Hampton Roads | Pipe culvert repairs | 3 of 3 | $1,056,063 | +28% |
| 25 OCT 2017 | C000102948M01B | Hampton Roads | Rte 199 intersection improvements at brookwood drive | 3 of 3 | $359,999 | +1.0% |
| 23 AUG 2017 | C00087865C01C | Fredericksburg | Route 14-drainage improvements at mathews courthouse | 1 of 3 | $2,032,350 | Low, 10% under the second |
| 21 DEC 2016 | C000085337C01 | Richmond | Rte 609 reconstruction | 1 of 3 | $889,792 | Low, 5.0% under the second |
| 16 NOV 2016 | C00059166C502 | Richmond | Rte. 607 minor widening | 1 of 3 | $928,170 | Low, 15% under the second |
| 27 JUL 2016 | C000106842N501 | Hampton Roads | Slope repair projects | 2 of 2 | $617,938 | +30% |
| 03 FEB 2016 | C00090930M01 | Richmond | Rte. 613 - widening | 2 of 3 | $377,689 | +12% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.