VDOT contract C0000115512C01 bid tabulation
Smart scale - shared use path. Let by Virginia DOT on August 26, 2026, James City, Hampton Roads. 3 bids received; low bid $6,097,777 by Allan Myers Va, Inc..
- Owner
- Virginia DOT
- Letting
- 26 AUG 2026
- Pay items
- 164
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Allan Myers Va, Inc. | $6,097,777 | Low |
| 2 | Curtis Contracting, Inc. | $6,474,766 | +6.0% |
| 3 | Howard Brothers Contractor, Inc. | $7,492,955 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allan Myers Va, Inc. | 2. Curtis Contracting, Inc. | 3. Howard Brothers Contractor, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0002) | ACRE | 0.30 | $200,000 | $330,137 | $340,000 |
| 0001-0020 | Endwall EW-12 (302SD20-0013) | EACH | 1 | $2,000.00 | $1,320.55 | $1,071.00 |
| 0001-0030 | 15" storm sewer pipe (302SD20-0027) | LF | 17 | $1,000.00 | $1,085.79 | $71.00 |
| 0001-0040 | 18" storm sewer pipe (302SD20-0032) | LF | 15 | $1,025.00 | $867.47 | $71.00 |
| 0001-0050 | 24" storm sewer pipe (302SD20-0041) | LF | 33 | $825.00 | $454.92 | $81.00 |
| 0001-0060 | Drop inlet DI-2A (302SD20-0239) | EACH | 1 | $11,500 | $16,282 | $4,000.00 |
| 0001-0070 | Drop inlet DI-2B,L=6' (302SD20-0242) | EACH | 3 | $11,000 | $15,957 | $4,500.00 |
| 0001-0080 | Drop inlet DI-2C,L=16' (302SD20-0264) | EACH | 1 | $18,500 | $19,404 | $7,000.00 |
| 0001-0090 | Drop inlet DI-3B,L=14' (302SD20-0316) | EACH | 3 | $10,500 | $17,248 | $5,500.00 |
| 0001-0100 | Drop inlet DI-4B,L=14' (302SD20-0387) | EACH | 1 | $13,000 | $19,868 | $6,500.00 |
| 0001-0110 | Manhole MH-1 or 2 (302SD20-0662) | LF | 8 | $3,400.00 | $3,405.90 | $800.00 |
| 0001-0120 | Frame & cover MH-1 (302SD20-0663) | EACH | 6 | $2,900.00 | $1,391.34 | $800.00 |
| 0001-0130 | Regular excavation (303SD20-0001) | CY | 1,473 | $50.00 | $168.77 | $20.00 |
| 0001-0140 | Check dam rock TY. II (303SD20-0023) | EACH | 15 | $2,500.00 | $424.66 | $52.00 |
| 0001-0150 | Siltation control excavation (303SD20-0029) | CY | 1,082 | $0.25 | $6.96 | $0.01 |
| 0001-0160 | Inlet protection type B (303SD20-0031) | EACH | 35 | $250.00 | $376.43 | $80.00 |
| 0001-0170 | Geotextile fabric (303SD20-0032) | SY | 654 | $4.00 | $9.33 | $2.50 |
| 0001-0180 | Temp. silt fence type B (303SD20-0033) | LF | 2,732 | $12.00 | $7.92 | $5.50 |
| 0001-0190 | Temp. silt fence type A (303SD20-0034) | LF | 1,729 | $10.00 | $3.96 | $5.00 |
| 0001-0200 | NS borrow excavation CBR-10 (303SX20-0006) | CY | 719 | $48.00 | $140.05 | $10.00 |
| 0001-0210 | NS geotextile fabric geomembrane impervious barrier (303SX20-0008) | SY | 343 | $20.00 | $14.53 | $10.00 |
| 0001-0220 | Utility test pit unpaved (303SX20-0012) | EACH | 2 | $2,800.00 | $1,320.55 | $1,500.00 |
| 0001-0230 | NS aggregate material no.78 drainage stone (305SX20-0002) | TON | 230 | $110.00 | $139.54 | $91.00 |
| 0001-0240 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 1,226 | $90.00 | $103.85 | $50.00 |
| 0001-0250 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 57 | $210.00 | $396.16 | $240.00 |
| 0001-0260 | Asphalt concrete TY. SM- 9.5A const (315SD20-0007) | TON | 651 | $145.00 | $264.11 | $225.00 |
| 0001-0270 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 131 | $145.00 | $264.11 | $250.00 |
| 0001-0280 | Saw-cut asphalt concrete full depth (315SD20-0104) | LF | 3,625 | $3.00 | $6.60 | $3.00 |
| 0001-0290 | Sheet piles steel (402SD20-0001) | SF | 12,488 | $36.00 | $48.67 | $70.00 |
| 0001-0300 | Conc. CL. A4 mod. low shrink., SPR. struct. const. (404SD20-0005) | CY | 18.50 | $3,800.00 | $3,445.99 | $10,000 |
| 0001-0310 | Cover depth survey const. (404SD20-0010) | SY | 82.70 | $10.00 | $71.86 | $70.00 |
| 0001-0320 | Concrete class A4, SPR. struct. maint. (404SD20-0016) | CY | 57.20 | $1,260.00 | $1,384.31 | $4,000.00 |
| 0001-0330 | CR reinf. steel CL. I SPR. struct. const. (406SD20-0003) | LB | 4,480 | $4.00 | $5.20 | $8.00 |
| 0001-0340 | Railing CPSR 3 rail const. (410SD20-0012) | LF | 394 | $520.00 | $817.66 | $1,100.00 |
| 0001-0380 | NS BR.superstr. wid./repair BR. superstr. wid./repair temporary shoring (412SX20-0013) | LS | 1 | $463,920 | $61,007 | $220,000 |
| 0001-0390 | NS rem. port.of EX.STR. rem. port.of EX.STR. (413SX20-0005) | LS | 1 | $875,000 | $866,592 | $1,408,000 |
| 0001-0400 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 1.10 | $280.00 | $1,213.70 | $300.00 |
| 0001-0410 | Dry riprap CL. AI (414SD20-0007) | SY | 325 | $188.00 | $167.72 | $105.00 |
| 0001-0420 | Elastomeric expans. dam 0" to 2" SPRSTR const (421SD20-0001) | LF | 110 | $110.00 | $120.00 | $400.00 |
| 0001-0430 | Place latex modified concrete overlay (425SD20-0009) | SY | 232 | $110.00 | $146.42 | $272.00 |
| 0001-0440 | Type A hydro-demolition 1/2" (425SD20-0022) | SY | 253 | $145.00 | $208.79 | $250.00 |
| 0001-0450 | Underdrain UD-4 (501SD20-0004) | LF | 1,539 | $25.00 | $26.41 | $15.00 |
| 0001-0460 | Outlet pipe (501SD20-0009) | LF | 45 | $55.00 | $33.01 | $20.00 |
| 0001-0470 | Curb, STD. CG-3 (502SD20-0014) | LF | 537 | $58.00 | $42.26 | $40.00 |
| 0001-0480 | Comb. curb & gutter, STD. CG-7 (502SD20-0024) | LF | 1,778 | $60.00 | $44.90 | $40.00 |
| 0001-0490 | Comb. curb & gutter, rad. CG-7 (502SD20-0025) | LF | 223 | $60.00 | $44.90 | $40.00 |
| 0001-0500 | Median strip MS-1 (502SD20-0053) | SY | 4 | $300.00 | $535.82 | $500.00 |
| 0001-0510 | NS paved ditch flexible mat concrete (502SX20-0006) | SY | 52 | $112.00 | $297.85 | $275.00 |
| 0001-0520 | CG-12 detectable warning surface (504SD20-0002) | SY | 12 | $500.00 | $739.51 | $900.00 |
| 0001-0530 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 6 | $200.00 | $794.16 | $300.00 |
| 0001-0540 | Hydr. cement conc. sidewalk 7" (504SD20-0004) | SY | 74 | $200.00 | $256.91 | $150.00 |
| 0001-0550 | Concrete class A-3 misc (504SD20-0010) | CY | 9 | $1,500.00 | $2,178.09 | $5,000.00 |
| 0001-0560 | NS handrail HR-1 TY. III (black-powder coated) (504SX20-0003) | LF | 155 | $300.00 | $635.15 | $550.00 |
| 0001-0570 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 1 | $1,400.00 | $2,983.35 | $25,000 |
| 0001-0580 | Guardrail GR-MGS1 (505SD20-0011) | LF | 189 | $38.00 | $38.69 | $35.00 |
| 0001-0590 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 1 | $4,000.00 | $4,235.26 | $53,400 |
| 0001-0600 | Guardrail end anchorage GR-MGS3 (505SD20-0018) | EACH | 2 | $4,000.00 | $1,865.67 | $2,000.00 |
| 0001-0610 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 2 | $1,800.00 | $1,585.71 | $2,000.00 |
| 0001-0620 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 1 | $5,400.00 | $4,291.25 | $24,500 |
| 0001-0630 | Remove existing guardrail (505SD20-0073) | LF | 1,102 | $10.00 | $13.54 | $7.00 |
| 0001-0640 | NS fence FE-CL (chain link black vinyl) (507SX20-0013) | LF | 479 | $48.00 | $39.62 | $42.00 |
| 0001-0650 | NS fence temp. orange safety fence (507SX20-0013) | LF | 103 | $25.00 | $6.60 | $5.00 |
| 0001-0660 | Demo. of pavement flexible (508SD20-0004) | SY | 2,360 | $20.00 | $13.19 | $20.00 |
| 0001-0670 | Flowable backfill (509SD20-0001) | CY | 72.50 | $480.00 | $523.83 | $500.00 |
| 0001-0680 | Remove sidewalk and entrance (510SX20-0001) | SY | 17 | $300.00 | $562.99 | $100.00 |
| 0001-0690 | Remove comb. curb and gutter (510SX20-0002) | LF | 1,996 | $20.00 | $25.85 | $50.00 |
| 0001-0700 | NS remove exist. drop inlet remove existing drop inlet (510SX20-0026) | EACH | 3 | $2,400.00 | $3,723.29 | $3,000.00 |
| 0001-0710 | NS modify exist. controller cabinet (510SX20-0031) | EACH | 1 | $10,000 | $8,583.57 | $10,000 |
| 0001-0720 | NS modify exist. modify existing drop inlet (510SX20-0031) | EACH | 3 | $1,800.00 | $6,602.75 | $3,000.00 |
| 0001-0730 | NS modify exist. modify existing manhole (510SX20-0031) | EACH | 1 | $1,800.00 | $6,602.75 | $5,000.00 |
| 0001-0740 | NS modify exist. modify to manhole (510SX20-0031) | EACH | 4 | $1,800.00 | $6,602.75 | $3,000.00 |
| 0001-0750 | NS adjust exist. drop inlet adjust existing drop inlet (510SX20-0033) | EACH | 2 | $1,800.00 | $6,602.75 | $5,000.00 |
| 0001-0760 | NS remove exist. remove existing pipe (510SX20-0039) | LF | 76 | $50.00 | $275.34 | $50.00 |
| 0001-0770 | Traffic barrier service MB-11A (512SD20-0003) | LF | 756 | $200.00 | $146.88 | $100.00 |
| 0001-0780 | Impact atten.ser. TY. III TL- 2, <=45 MPH (512SD20-0009) | EACH | 1 | $40,000 | $36,188 | $10,000 |
| 0001-0790 | Type 3 barricade 4' (512SD20-0012) | EACH | 1 | $500.00 | $822.84 | $500.00 |
| 0001-0800 | Type 3 barricade 8' (512SD20-0013) | EACH | 7 | $750.00 | $936.41 | $500.00 |
| 0001-0810 | Temporary sign (512SD20-0014) | SF | 1,613 | $100.00 | $46.22 | $15.00 |
| 0001-0820 | Aggregate material no. 25 or 26 (512SD20-0015) | TON | 2 | $900.00 | $874.29 | $100.00 |
| 0001-0830 | Pedestrian barricade device (512SD20-0018) | LF | 120 | $100.00 | $39.62 | $50.00 |
| 0001-0840 | Truck mounted attenuator (512SD20-0023) | HR | 3,177 | $45.00 | $55.00 | $20.00 |
| 0001-0850 | Group 2 channelizing devices (512SD20-0024) | DAY | 39,685 | $0.50 | $0.56 | $0.35 |
| 0001-0860 | Port.changeable mess. sign (512SD20-0025) | HR | 270 | $25.00 | $45.00 | $12.00 |
| 0001-0870 | Electronic arrow board (512SD20-0026) | HR | 1,611 | $10.00 | $15.00 | $2.00 |
| 0001-0880 | Flagger service (512SD20-0027) | HR | 390 | $70.00 | $90.00 | $60.00 |
| 0001-0890 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 15 | $20.00 | $72.63 | $15.00 |
| 0001-0900 | Temp. PVMT MRKG TY. A, 6" (512SD20-0047) | LF | 4,555 | $1.00 | $0.86 | $1.00 |
| 0001-0910 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 1,033 | $1.00 | $1.98 | $1.00 |
| 0001-0920 | Temp. PVMT MRKG TY. A, 12" (512SD20-0049) | LF | 102 | $5.00 | $11.88 | $1.00 |
| 0001-0930 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 2,150 | $5.00 | $4.95 | $3.00 |
| 0001-0940 | Portable temporary rumble strip array (512SP20-0001) | DAY | 27 | $550.00 | $500.00 | $1.00 |
| 0001-0950 | Mobilization (513SD20-0001) | LS | 1 | $265,000 | $353,000 | $749,296 |
| 0001-0960 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 4,885 | $2.50 | $8.11 | $14.80 |
| 0001-0970 | Construction surveying constr. (517SD20-0001) | LS | 1 | $64,311 | $52,822 | $283,162 |
| 0001-0980 | 3/4" water service line (520SD20-0002) | LF | 44 | $265.00 | $467.55 | $239.00 |
| 0001-0990 | 6" DI water main (520SD20-0014) | LF | 49 | $750.00 | $295.47 | $220.00 |
| 0001-1000 | 16" DI water main (520SD20-0024) | LF | 616 | $800.00 | $602.33 | $782.00 |
| 0001-1010 | 24" DI water main (520SD20-0030) | LF | 399 | $1,260.00 | $1,038.71 | $880.00 |
| 0001-1020 | 16" bend (520SD20-0041) | EACH | 12 | $3,925.00 | $3,604.73 | $4,000.00 |
| 0001-1030 | 24" bend (520SD20-0044) | EACH | 5 | $6,650.00 | $7,358.82 | $8,000.00 |
| 0001-1040 | 16" branch (520SD20-0049) | EACH | 2 | $3,850.00 | $4,070.73 | $5,000.00 |
| 0001-1050 | 24" branch (520SD20-0052) | EACH | 1 | $17,500 | $21,371 | $25,000 |
| 0001-1060 | 24" reducer (520SD20-0068) | EACH | 1 | $5,660.00 | $7,560.50 | $5,000.00 |
| 0001-1070 | 6" gate valve & box (520SD20-0089) | EACH | 2 | $3,275.00 | $3,588.32 | $2,000.00 |
| 0001-1080 | 16" butterfly valve & box (520SD20-0098) | EACH | 1 | $11,600 | $12,786 | $15,000 |
| 0001-1090 | 24" butterfly valve & box (520SD20-0110) | EACH | 2 | $20,500 | $14,204 | $21,000 |
| 0001-1100 | Fire hydrant (520SD20-0162) | EACH | 2 | $8,200.00 | $28,457 | $8,000.00 |
| 0001-1110 | NS water utility 16" solid sleeve (520SX20-0086) | EACH | 3 | $7,500.00 | $4,754.00 | $5,000.00 |
| 0001-1120 | NS water utility 24" solid sleeve (520SX20-0086) | EACH | 3 | $10,000 | $8,048.28 | $10,000 |
| 0001-1130 | Topsoil class B (602SD20-0004) | CY | 411 | $66.00 | $135.22 | $25.00 |
| 0001-1140 | Temporary seed (603SD20-0002) | LB | 102 | $30.00 | $26.41 | $5.00 |
| 0001-1150 | Regular seed (603SD20-0003) | LB | 185 | $12.00 | $26.41 | $5.00 |
| 0001-1160 | Overseeding (603SD20-0004) | LB | 148 | $12.00 | $26.41 | $5.00 |
| 0001-1170 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 4,538 | $1.25 | $1.32 | $0.30 |
| 0001-1180 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 6,570 | $1.25 | $1.32 | $0.90 |
| 0001-1190 | Sediment retention roll 18" min (603SD20-0011) | LF | 846 | $15.00 | $36.32 | $10.00 |
| 0001-1200 | Fertilizer nitrogen - N (603SD20-0014) | LB | 102 | $7.00 | $6.60 | $2.50 |
| 0001-1210 | Fertilizer phosphorous - P (603SD20-0015) | LB | 71 | $7.00 | $6.60 | $2.50 |
| 0001-1220 | Fertilizer potassium - K (603SD20-0016) | LB | 71 | $7.00 | $6.60 | $2.50 |
| 0001-1230 | Lime (603SD20-0017) | TON | 5.61 | $140.00 | $396.17 | $350.00 |
| 0001-1240 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 357 | $5.00 | $6.60 | $1.00 |
| 0001-1250 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 19 | $42.00 | $474.20 | $500.00 |
| 0001-1260 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 82 | $24.00 | $48.66 | $20.00 |
| 0001-1270 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 30 | $29.00 | $55.55 | $25.00 |
| 0001-1280 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 67 | $30.00 | $55.56 | $25.00 |
| 0001-1290 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 35 | $27.00 | $55.52 | $25.00 |
| 0001-1300 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 11 | $500.00 | $974.26 | $500.00 |
| 0001-1310 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 5 | $600.00 | $1,683.39 | $500.00 |
| 0001-1320 | Conc. found. STP-1, TY. E (700SD20-0042) | EACH | 1 | $400.00 | $1,404.84 | $500.00 |
| 0001-1330 | Pedestal pole PF-2, 12' (700SD20-0067) | EACH | 2 | $4,000.00 | $3,032.72 | $3,000.00 |
| 0001-1340 | Conc. found. PF-2 (700SD20-0069) | EACH | 2 | $3,500.00 | $2,222.18 | $2,750.00 |
| 0001-1350 | 14/4 conductor cable (700SD20-0112) | LF | 525 | $7.00 | $6.00 | $5.00 |
| 0001-1360 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 1,500 | $6.00 | $5.04 | $4.00 |
| 0001-1370 | 14/2 conductor cable shielded (700SD20-0120) | LF | 1,325 | $6.00 | $5.05 | $4.00 |
| 0001-1380 | Electrical service SE-3, TY. B (700SD20-0133) | EACH | 1 | $8,000.00 | $9,483.97 | $6,525.00 |
| 0001-1390 | 8 conductor cable (700SD20-0144) | LF | 475 | $4.00 | $4.49 | $3.00 |
| 0001-1400 | 8 conductor cable egc (700SD20-0148) | LF | 890 | $4.00 | $4.12 | $3.00 |
| 0001-1410 | Conc. found. LF-1, TY. A (700SD20-0149) | EACH | 1 | $4,250.00 | $5,572.16 | $4,000.00 |
| 0001-1420 | Lighting pole LP-2 type E (700SD20-0157) | EACH | 1 | $9,000.00 | $11,764 | $10,000 |
| 0001-1430 | Junction box JB-S2 (700SD20-0178) | EACH | 4 | $3,500.00 | $3,589.35 | $3,000.00 |
| 0001-1440 | Junction box JB-S3 (700SD20-0179) | EACH | 1 | $5,500.00 | $3,981.41 | $4,000.00 |
| 0001-1450 | Conduit PVC 1" (700SD20-0182) | LF | 80 | $25.00 | $38.95 | $18.00 |
| 0001-1460 | Bored conduit 2" (700SD20-0191) | LF | 220 | $48.00 | $67.64 | $35.00 |
| 0001-1470 | Bored conduit 3" (700SD20-0192) | LF | 375 | $50.00 | $67.64 | $38.00 |
| 0001-1480 | Conduit PVC 2" (700SD20-0194) | LF | 95 | $24.00 | $35.27 | $18.00 |
| 0001-1490 | Conduit PVC 3" (700SD20-0195) | LF | 70 | $31.00 | $48.39 | $22.50 |
| 0001-1500 | Trench excavation eci-1 (700SD20-0197) | LF | 95 | $20.00 | $49.92 | $15.00 |
| 0001-1510 | Sign post STP-2, 4", 8 gauge (700SD20-0200) | LF | 17 | $125.00 | $80.30 | $100.00 |
| 0001-1520 | Concrete foundation STP-2, type A (700SD20-0201) | EACH | 1 | $2,000.00 | $4,966.14 | $10,000 |
| 0001-1530 | Sign panel (701SD20-0001) | SF | 202 | $42.00 | $52.22 | $35.00 |
| 0001-1540 | Flexible post delineator (702SD20-0002) | EACH | 125 | $89.00 | $145.26 | $100.00 |
| 0001-1550 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 15 | $500.00 | $438.13 | $500.00 |
| 0001-1560 | Pedestrian actuation PA-2 (703SD20-0011) | EACH | 2 | $2,200.00 | $2,132.69 | $2,000.00 |
| 0001-1570 | Hanger assembly SMB-2, one way (703SD20-0037) | EACH | 2 | $300.00 | $307.95 | $225.00 |
| 0001-1580 | Loop saw cut 3/8" (703SD20-0042) | LF | 400 | $48.00 | $43.97 | $50.00 |
| 0001-1590 | Loop saw cut 5/8" (703SD20-0043) | LF | 40 | $66.00 | $132.54 | $50.00 |
| 0001-1600 | Remove existing signal head (703SD20-0046) | EACH | 15 | $340.00 | $644.69 | $250.00 |
| 0001-1610 | Pedestrian signal head SP-9 (703SD20-0061) | EACH | 2 | $1,300.00 | $2,206.84 | $1,000.00 |
| 0001-1620 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 2,230 | $2.40 | $1.78 | $2.00 |
| 0001-1630 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 249 | $6.00 | $33.01 | $5.00 |
| 0001-1640 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 21 | $235.00 | $99.04 | $200.00 |
| 0001-1650 | PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047) | EACH | 1 | $225.00 | $330.14 | $200.00 |
| 0001-1660 | NS luminaire luminaire 101W LED pole-mount (705SX20-0001) | EACH | 1 | $1,000.00 | $1,217.81 | $1,000.00 |
| 0001-1670 | Furn latex mod concrete 1-1/4" - 1-3/4" (425SD20-0007) | CY | 3.30 | $2,500.00 | $13,499 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.