Drop inlet DI-2B,L=6', VDOT 302SD20-0242

Low bidders on VDOT contracts carried a median of $11,028 per EACH for this item, over the 24 months to 28 OCT 2026, across 10 low bids. Half of all 29 bids fell between $10,741 and $16,000.

Owner
Virginia DOT
Item
302SD20-0242
Unit
EACH
Data through
28 OCT 2026

VDOT prints this item as “DROP INLET DI-2B,L=6'”.

VDOT has bid this work under more than one code: 6748 on lettings from 23 APR 2002 to 27 OCT 2021 (258 bids); 302SD20-0242 on lettings from 25 FEB 2026 to 23 SEP 2026 (29 bids). They are combined here into one trend.

$11,028Low bidder's median, per EACH
$12,699Median of all bids, per EACH
10Contracts in the window

By year of letting

Drop inlet DI-2B,L=6', VDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
200222$2,925.006$3,100.00
200333$2,550.009$2,550.00
200477$3,200.0016$3,200.00
200544$3,750.0010$3,800.00
200688$4,893.5724$4,500.00
200799$4,134.0026$4,172.00
200822$2,681.106$2,806.00
200933$4,200.009$3,342.41
201066$3,214.7118$3,020.83
201111$4,285.003$4,500.00
201233$3,700.009$3,600.00
20131010$4,350.0029$4,588.26
201477$4,500.0019$5,029.00
201577$4,500.0019$5,000.00
201676$5,804.1915$6,590.00
201733$5,950.008$6,300.00
201833$7,226.599$6,100.00
201911$8,000.003$9,056.25
202044$4,584.5012$4,959.50
202133$6,157.468$6,328.73
20261010$11,02829$12,699

Bid prices as published, not adjusted for inflation.

Who is lowest on this line

BidderLines bidLowest on the line
General Excavation, Inc.165 (31%)
J. L. Kent & Sons, Inc.115 (45%)
Tavares Concrete Co., Inc.74 (57%)
Jones Road & Bridge, Inc.54 (80%)
W-L Construction & Paving, Inc.73 (43%)
Howard Brothers Contractor, Inc.73 (43%)
Drop inlet DI-2B,L=6', VDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianBidsLow bidderSource
23 SEP 2026C0000124001C01BStaunton1$5,125.00$14,3834Richardson-Wayland-Ferreira, LLCVDOT
23 SEP 2026C0000123290C01Richmond1$18,088$16,5005Caton Construction Group, Inc.VDOT
26 AUG 2026C0000124095M01Salem1$18,000$15,3494Allegheny Construction Company, Inc.VDOT
26 AUG 2026C0000115512C01Hampton Roads3$11,000$11,0003Allan Myers Va, Inc.VDOT
22 JUL 2026C0000120697C01Salem2$7,200.00$15,0003Crossroads Bridge IncVDOT
22 JUL 2026C0000120710C01Lynchburg1$12,000$9,000.002Caton Construction Group, Inc.VDOT
22 JUL 2026C0000115403C01CRichmond1$11,055$12,5003MCC ACQUISITION, LC dba VIRGINIA-CAROLINAVDOT
24 JUN 2026C0000108810C01Staunton2$8,452.00$9,596.502A & J Development and Excavation, Inc.VDOT
22 APR 2026C0000118863C01Culpeper2$10,109$10,1091Caton Construction Group, Inc.VDOT
25 FEB 2026C0000119431C01BBristol2$11,254$10,6272King General Contractors, Inc.VDOT
27 OCT 2021C000109550C01BLynchburg8$6,500.00$6,533.002Caton Construction Group, Inc.VDOT
24 FEB 2021C0000107055M01Salem2$3,000.00$5,500.003Jones Road & Bridge, Inc.VDOT
24 FEB 2021C000113630M501Fredericksburg1$6,157.46$7,500.003Phillips Construction, LLC of Ky(Use In Va By:Phillips ConstVDOT
18 NOV 2020C000111049M501Staunton1$4,250.00$4,500.003Plecker Construction CompanyVDOT
25 MAR 2020C0000109466M01Fredericksburg3$2,800.00$4,170.003Howard Brothers Contractor, Inc.VDOT
Latest VDOT contracts carrying Drop inlet DI-2B,L=6'

Filter this item by your own quantity, district and period, or check your price against it, in the VDOT explorer.

How these prices were read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are VDOT's own: this item is compared with VDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the VDOT letting of 28 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.