VDOT contract C0000124095M01 bid tabulation
Smart scale - road widening and improvements. Let by Virginia DOT on August 26, 2026, Montgomery, Salem. 4 bids received; low bid $4,147,707 by Allegheny Construction Company, Inc..
- Owner
- Virginia DOT
- Letting
- 26 AUG 2026
- Pay items
- 108
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Allegheny Construction Company, Inc. | $4,147,707 | Low |
| 2 | Jones Road & Bridge, Inc. | $4,491,411 | +8.0% |
| 3 | King General Contractors, Inc. | $4,926,344 | +19% |
| 4 | Caton Construction Group, Inc. | $5,033,190 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allegheny Construction Company, Inc. | 2. Jones Road & Bridge, Inc. | 3. King General Contractors, Inc. | 4. Caton Construction Group, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | Const rec docs SWM facility construction record documents SWM facility (105SP20-0002) | LS | 1 | $18,000 | $55,000 | $79,968 | $14,843 |
| 0001-0020 | Clearing and grubbing (301SD20-0002) | ACRE | 1.98 | $115,000 | $60,000 | $159,936 | $21,717 |
| 0001-0030 | Bedding matl. aggr. no. 57 (302SD20-0002) | TON | 84 | $160.00 | $80.00 | $79.97 | $152.92 |
| 0001-0040 | 18" storm sewer pipe (302SD20-0032) | LF | 619 | $420.00 | $350.00 | $110.44 | $393.82 |
| 0001-0050 | 24" conc. pipe (302SD20-0039) | LF | 35 | $460.00 | $400.00 | $213.43 | $729.96 |
| 0001-0060 | 24" storm sewer pipe (302SD20-0041) | LF | 450 | $475.00 | $375.00 | $226.63 | $470.31 |
| 0001-0070 | 30" conc. pipe (302SD20-0049) | LF | 211 | $515.00 | $400.00 | $261.10 | $633.53 |
| 0001-0080 | 30" storm sewer pipe (302SD20-0051) | LF | 183 | $515.00 | $375.00 | $261.10 | $753.28 |
| 0001-0090 | Drop inlet DI-2B,L=6' (302SD20-0242) | EACH | 1 | $18,000 | $11,000 | $12,699 | $24,748 |
| 0001-0100 | Drop inlet DI-3A (302SD20-0309) | EACH | 1 | $17,000 | $16,000 | $14,898 | $19,474 |
| 0001-0110 | Drop inlet DI-3B,L=6' (302SD20-0312) | EACH | 6 | $18,000 | $13,000 | $11,828 | $24,639 |
| 0001-0120 | Drop inlet DI-3B,L=8' (302SD20-0313) | EACH | 1 | $18,400 | $13,000 | $11,050 | $24,635 |
| 0001-0130 | Drop inlet DI-3BB,L=6' (302SD20-0321) | EACH | 2 | $20,000 | $16,000 | $16,190 | $28,745 |
| 0001-0140 | Drop inlet DI-3C,L=6' (302SD20-0329) | EACH | 1 | $17,000 | $13,000 | $11,317 | $20,968 |
| 0001-0150 | Drop inlet DI-5 (302SD20-0446) | EACH | 3 | $18,000 | $14,000 | $12,364 | $24,297 |
| 0001-0160 | Drop inlet DI-7 (302SD20-0447) | EACH | 4 | $16,500 | $12,000 | $10,229 | $20,535 |
| 0001-0170 | Manhole MH-1 or 2 (302SD20-0662) | LF | 19.20 | $1,550.00 | $1,300.00 | $1,224.85 | $1,903.36 |
| 0001-0180 | Frame & cover MH-1 (302SD20-0663) | EACH | 2 | $1,500.00 | $1,100.00 | $1,335.47 | $10,232 |
| 0001-0190 | Stormwater man.drain.STR.SWM-1 (302SD20-0673) | LF | 7 | $2,600.00 | $1,600.00 | $2,262.65 | $4,192.37 |
| 0001-0200 | NS pipe outlet pipe (302SX20-0013) | LF | 40 | $95.00 | $80.00 | $2,984.41 | $141.56 |
| 0001-0210 | NS spec. design modified UD-1 (302SX20-0016) | LF | 109 | $140.00 | $90.00 | $191.92 | $175.61 |
| 0001-0220 | Regular excavation (303SD20-0001) | CY | 1,460 | $155.00 | $150.00 | $271.89 | $127.00 |
| 0001-0230 | Check dam rock TY. II (303SD20-0023) | EACH | 19 | $1,000.00 | $1,000.00 | $1,439.42 | $987.16 |
| 0001-0240 | Dewatering basin EC-8 (303SD20-0028) | EACH | 3 | $2,400.00 | $1,000.00 | $1,919.23 | $3,281.93 |
| 0001-0250 | Siltation control excavation (303SD20-0029) | CY | 595 | $0.01 | $0.01 | $39.98 | $269.58 |
| 0001-0260 | Inlet protection type A (303SD20-0030) | EACH | 12 | $575.00 | $1,000.00 | $1,279.49 | $605.66 |
| 0001-0270 | Inlet protection type B (303SD20-0031) | EACH | 16 | $575.00 | $1,000.00 | $1,359.46 | $202.22 |
| 0001-0280 | Temp. silt fence type A (303SD20-0034) | LF | 1,923 | $5.00 | $8.00 | $11.20 | $4.23 |
| 0001-0290 | Storm water man. basin excav. (303SD20-0036) | CY | 1,165 | $45.00 | $120.00 | $191.92 | $71.98 |
| 0001-0300 | Aggr.base mat.TY. I no.21A or 21B (305SD20-0012) | TON | 1,114 | $100.00 | $120.00 | $103.96 | $152.54 |
| 0001-0310 | Aggr. matl. no. 3 (305SD20-0013) | TON | 520 | $100.00 | $110.00 | $103.96 | $129.83 |
| 0001-0320 | Crusher run aggr. no. 25 or 26 (308SX20-0003) | TON | 3 | $240.00 | $90.00 | $103.96 | $125.50 |
| 0001-0330 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 139 | $330.00 | $365.00 | $639.74 | $284.24 |
| 0001-0340 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 463 | $290.00 | $337.00 | $719.71 | $262.12 |
| 0001-0350 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 245 | $245.00 | $289.00 | $559.78 | $224.55 |
| 0001-0360 | Saw-cut asphalt concrete full depth (315SD20-0104) | LF | 1,730 | $6.00 | $10.00 | $19.19 | $1.83 |
| 0001-0370 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 4 | $250.00 | $120.00 | $255.90 | $315.51 |
| 0001-0380 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 14 | $200.00 | $120.00 | $255.90 | $315.51 |
| 0001-0390 | Dry riprap CL.I 18" (414SD20-0010) | TON | 8 | $200.00 | $120.00 | $255.90 | $335.11 |
| 0001-0400 | Outlet pipe (501SD20-0009) | LF | 14 | $85.00 | $80.00 | $287.88 | $136.24 |
| 0001-0410 | Paved ditch PG-2A (502SD20-0003) | SY | 28 | $500.00 | $500.00 | $479.81 | $503.34 |
| 0001-0420 | Comb. curb & gutter, STD. CG-7 (502SD20-0024) | LF | 1,121 | $230.00 | $225.00 | $127.95 | $58.95 |
| 0001-0430 | Comb. curb & gutter, rad. CG-7 (502SD20-0025) | LF | 11 | $350.00 | $225.00 | $127.95 | $42.27 |
| 0001-0440 | Entrance gutter CG-9D (502SD20-0029) | SY | 288 | $195.00 | $600.00 | $479.81 | $219.56 |
| 0001-0450 | Comb. curb & gutter rad. CG-11 (502SD20-0030) | LF | 36 | $450.00 | $225.00 | $127.95 | $123.71 |
| 0001-0460 | Concrete class A3 misc. (504SD20-0001) | CY | 22.90 | $1,730.00 | $4,000.00 | $959.62 | $1,530.72 |
| 0001-0470 | Geotextile drainage fabric (504SD20-0005) | SY | 619 | $5.00 | $5.00 | $6.40 | $14.44 |
| 0001-0480 | Fence FE-CL vinyl coated (507SD20-0006) | LF | 490 | $65.00 | $80.00 | $99.16 | $62.00 |
| 0001-0490 | Gate FE-CL 12' (507SD20-0013) | EACH | 1 | $3,500.00 | $5,000.00 | $4,798.08 | $3,000.00 |
| 0001-0500 | High visibility fence, 4 feet (507SD20-0027) | LF | 905 | $5.00 | $5.00 | $27.19 | $12.86 |
| 0001-0510 | Demo. of pavement flexible (508SD20-0004) | SY | 1,236 | $27.00 | $33.00 | $44.78 | $48.91 |
| 0001-0520 | Flowable backfill (509SD20-0001) | CY | 63 | $500.00 | $330.00 | $639.74 | $904.37 |
| 0001-0530 | Adjust exist frame & cover (510SD20-0050) | EACH | 1 | $2,500.00 | $2,000.00 | $3,998.40 | $3,669.76 |
| 0001-0540 | NS modify exist. drop inlet (510SX20-0031) | EACH | 1 | $4,000.00 | $5,000.00 | $3,998.40 | $5,086.75 |
| 0001-0550 | Allaying dust (511SD20-0001) | HR | 2,300 | $0.01 | $20.00 | $23.99 | $70.00 |
| 0001-0560 | Type 3 barricade 8' (512SD20-0013) | EACH | 2 | $600.00 | $800.00 | $1,439.42 | $865.23 |
| 0001-0570 | Temporary sign (512SD20-0014) | SF | 550 | $25.00 | $35.00 | $71.97 | $24.00 |
| 0001-0580 | Group 2 longitudinal channelizing device (512SD20-0022) | LF | 30 | $100.00 | $20.00 | $271.89 | $332.18 |
| 0001-0590 | Group 2 channelizing devices (512SD20-0024) | DAY | 14,315 | $3.00 | $0.50 | $3.20 | $0.46 |
| 0001-0600 | Port.changeable mess. sign (512SD20-0025) | HR | 4,600 | $5.00 | $3.00 | $15.99 | $10.51 |
| 0001-0610 | Flagger service (512SD20-0027) | HR | 8,400 | $35.00 | $25.00 | $35.19 | $77.65 |
| 0001-0620 | Warning light TY. B (512SD20-0029) | DAY | 702 | $4.00 | $1.00 | $5.60 | $3.00 |
| 0001-0630 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 3,490 | $3.75 | $4.50 | $2.00 | $3.34 |
| 0001-0640 | Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052) | EACH | 28 | $330.00 | $267.00 | $127.95 | $205.50 |
| 0001-0650 | Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061) | LF | 6,500 | $5.00 | $5.00 | $7.60 | $3.92 |
| 0001-0660 | Portable temporary rumble strip array (512SP20-0001) | DAY | 415 | $30.00 | $100.00 | $87.96 | $262.66 |
| 0001-0670 | Mobilization (513SD20-0001) | LS | 1 | $220,000 | $240,000 | $235,906 | $285,000 |
| 0001-0680 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 4,038 | $15.00 | $12.00 | $19.19 | $9.24 |
| 0001-0690 | Construction surveying min. plan (517SD20-0002) | LS | 1 | $100,000 | $481,000 | $119,952 | $61,127 |
| 0001-0700 | 1" water service line (520SD20-0003) | LF | 18 | $70.00 | $100.00 | $140.07 | $733.50 |
| 0001-0710 | 2" water service line (520SD20-0006) | LF | 33 | $115.00 | $100.00 | $192.85 | $586.20 |
| 0001-0720 | 6" DI water main (520SD20-0014) | LF | 783 | $315.00 | $250.00 | $247.90 | $245.00 |
| 0001-0730 | 8" DI water main (520SD20-0016) | LF | 331 | $330.00 | $300.00 | $327.87 | $490.00 |
| 0001-0740 | 6" gate valve & box (520SD20-0089) | EACH | 4 | $4,050.00 | $7,000.00 | $6,397.44 | $7,273.48 |
| 0001-0750 | 8" gate valve & box (520SD20-0090) | EACH | 2 | $5,150.00 | $8,000.00 | $7,516.99 | $9,431.91 |
| 0001-0760 | Fire hydrant (520SD20-0162) | EACH | 1 | $8,900.00 | $15,000 | $11,995 | $16,736 |
| 0001-0770 | 2" air release valve & box (520SD20-0165) | EACH | 4 | $6,200.00 | $5,000.00 | $10,716 | $17,383 |
| 0001-0780 | 1" water meter box & yoke (520SD20-0168) | EACH | 3 | $4,000.00 | $4,000.00 | $4,878.05 | $6,103.29 |
| 0001-0790 | 12" steel encase. pipe (520SD20-0291) | LF | 40 | $485.00 | $400.00 | $639.74 | $1,022.77 |
| 0001-0800 | NS sanitary sewer 2" force main (520SX20-0009) | LF | 48 | $135.00 | $400.00 | $159.94 | $224.64 |
| 0001-0810 | Mailbox post, single (521SD20-0001) | EACH | 7 | $300.00 | $500.00 | $719.71 | $1,218.20 |
| 0001-0820 | Storm water management low permeability liner (523SP20-0002) | SY | 264 | $83.00 | $55.00 | $20.79 | $91.59 |
| 0001-0830 | NS topsoil class B, 4" (602SX20-0006) | CY | 1,020 | $110.00 | $160.00 | $63.97 | $185.00 |
| 0001-0840 | Temporary seed (603SD20-0002) | LB | 207 | $25.00 | $16.00 | $63.97 | $6.65 |
| 0001-0850 | Regular seed (603SD20-0003) | LB | 351 | $18.00 | $16.00 | $63.97 | $5.83 |
| 0001-0860 | Overseeding (603SD20-0004) | LB | 281 | $18.00 | $16.00 | $63.97 | $6.56 |
| 0001-0870 | Hydraulic erosion control product type 1 (603SD20-0007) | SY | 81 | $1.50 | $0.78 | $14.39 | $1.46 |
| 0001-0880 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 190 | $1.75 | $0.78 | $12.79 | $1.75 |
| 0001-0890 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 404 | $2.00 | $1.00 | $12.79 | $1.89 |
| 0001-0900 | Fertilizer nitrogen - N (603SD20-0014) | LB | 190 | $2.50 | $3.00 | $31.99 | $8.01 |
| 0001-0910 | Fertilizer phosphorous - P (603SD20-0015) | LB | 140 | $2.50 | $3.00 | $31.99 | $8.01 |
| 0001-0920 | Fertilizer potassium - K (603SD20-0016) | LB | 140 | $2.50 | $3.00 | $31.99 | $8.01 |
| 0001-0930 | Lime (603SD20-0017) | TON | 13 | $300.00 | $182.00 | $799.68 | $174.86 |
| 0001-0940 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 9,539 | $4.00 | $5.50 | $8.00 | $2.48 |
| 0001-0950 | Rolled erosion CTRL product EC-3 type 2 (606SD20-0006) | SY | 42 | $8.00 | $10.00 | $63.97 | $8.74 |
| 0001-0960 | Mowing (608SD20-0001) | HR | 75 | $90.00 | $10.00 | $31.99 | $255.00 |
| 0001-0970 | Gabions (610SD20-0001) | CY | 14 | $740.00 | $120.00 | $639.74 | $1,289.49 |
| 0001-0980 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 5 | $415.00 | $166.00 | $1,119.55 | $127.37 |
| 0001-0990 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 1 | $200.00 | $130.00 | $399.84 | $98.29 |
| 0001-1000 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 81 | $24.00 | $29.00 | $63.97 | $22.20 |
| 0001-1010 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 6 | $50.00 | $61.00 | $159.94 | $47.12 |
| 0001-1020 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 15 | $45.00 | $52.00 | $111.96 | $40.11 |
| 0001-1030 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 14 | $35.00 | $41.00 | $111.96 | $31.45 |
| 0001-1040 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 7 | $825.00 | $813.00 | $1,759.30 | $625.39 |
| 0001-1050 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 1 | $1,400.00 | $1,767.00 | $1,919.23 | $1,358.72 |
| 0001-1060 | Sign panel (701SD20-0001) | SF | 76.20 | $65.00 | $78.00 | $63.97 | $60.33 |
| 0001-1070 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 3,150 | $3.00 | $3.00 | $2.40 | $2.41 |
| 0001-1080 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 8 | $495.00 | $465.00 | $639.74 | $357.14 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of August 26, 2026. Compiled by Mirage Metrics.