VDOT contract C0000120697C01 bid tabulation
Intersection improvements / pedestrian accommodations. Let by Virginia DOT on July 22, 2026, Montgomery, Salem. 3 bids received; low bid $4,870,763 by Crossroads Bridge Inc.
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 178
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crossroads Bridge Inc | $4,870,763 | Low |
| 2 | Allegheny Construction Company, Inc. | $6,108,849 | +25% |
| 3 | Jones Road & Bridge, Inc. | $6,321,593 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crossroads Bridge Inc | 2. Allegheny Construction Company, Inc. | 3. Jones Road & Bridge, Inc. |
|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $40,000 | $12,000 | $30,000 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 12 | $1,500.00 | $2,000.00 | $800.00 |
| 0001-0030 | Clearing and grubbing (301SD20-0001) | LS | 1 | $150,000 | $370,000 | $100,000 |
| 0001-0040 | Bedding matl. aggr. no. 57 (302SD20-0002) | TON | 176.90 | $95.00 | $125.00 | $80.00 |
| 0001-0050 | Concrete class A4 box culvert (302SD20-0004) | CY | 16.90 | $9,800.00 | $3,350.00 | $4,000.00 |
| 0001-0060 | Reinf. steel (302SD20-0005) | LB | 1,467 | $3.65 | $6.00 | $8.00 |
| 0001-0070 | 18" conc. pipe (302SD20-0030) | LF | 288 | $110.00 | $320.00 | $350.00 |
| 0001-0080 | 18" storm sewer pipe (302SD20-0032) | LF | 1,028 | $110.00 | $200.00 | $350.00 |
| 0001-0090 | 24" storm sewer pipe (302SD20-0041) | LF | 24 | $200.00 | $365.00 | $350.00 |
| 0001-0100 | 18" end section ES-1 or 2 (302SD20-0200) | EACH | 2 | $2,500.00 | $1,200.00 | $3,000.00 |
| 0001-0110 | Drop inlet DI-2A (302SD20-0239) | EACH | 1 | $5,000.00 | $15,000 | $15,000 |
| 0001-0120 | Drop inlet DI-2B,L=6' (302SD20-0242) | EACH | 2 | $7,200.00 | $15,700 | $15,000 |
| 0001-0130 | Drop inlet DI-2B,L=8' (302SD20-0243) | EACH | 2 | $8,400.00 | $15,750 | $15,000 |
| 0001-0140 | Drop inlet DI-3A (302SD20-0309) | EACH | 2 | $4,500.00 | $14,600 | $15,000 |
| 0001-0150 | Drop inlet DI-3B,L=6' (302SD20-0312) | EACH | 3 | $7,500.00 | $15,000 | $15,000 |
| 0001-0160 | Drop inlet DI-3B,L=10' (302SD20-0314) | EACH | 2 | $7,500.00 | $16,000 | $15,000 |
| 0001-0170 | Drop inlet DI-3BB,L=6' (302SD20-0321) | EACH | 1 | $12,000 | $17,000 | $25,000 |
| 0001-0180 | Drop inlet DI-3C,L=6' (302SD20-0329) | EACH | 1 | $6,000.00 | $15,600 | $20,000 |
| 0001-0190 | Drop inlet DI-5 (302SD20-0446) | EACH | 1 | $5,200.00 | $15,900 | $15,000 |
| 0001-0200 | Manhole MH-1 or 2 (302SD20-0662) | LF | 28.50 | $940.00 | $2,160.00 | $1,600.00 |
| 0001-0210 | Frame & cover MH-1 (302SD20-0663) | EACH | 6 | $1,400.00 | $1,200.00 | $1,500.00 |
| 0001-0220 | Regular excavation (303SD20-0001) | CY | 2,341 | $65.00 | $100.00 | $130.00 |
| 0001-0230 | Borrow excavation (303SD20-0007) | CY | 2,391 | $110.00 | $90.00 | $130.00 |
| 0001-0240 | Geotextile embankment stab. (303SD20-0013) | SY | 130 | $11.00 | $35.00 | $5.00 |
| 0001-0250 | Minor STR. excav. box culvert (303SD20-0017) | CY | 8.90 | $100.00 | $1,200.00 | $100.00 |
| 0001-0260 | Slope drain (303SD20-0018) | EACH | 1 | $3,000.00 | $2,500.00 | $3,000.00 |
| 0001-0270 | Check dam rock TY. I (303SD20-0022) | EACH | 19 | $1,000.00 | $1,400.00 | $1,000.00 |
| 0001-0280 | Check dam rock TY. II (303SD20-0023) | EACH | 19 | $1,000.00 | $1,400.00 | $1,000.00 |
| 0001-0290 | Dewatering basin EC-8 (303SD20-0028) | EACH | 1 | $5,200.00 | $8,300.00 | $5,000.00 |
| 0001-0300 | Siltation control excavation (303SD20-0029) | CY | 440 | $0.01 | $25.00 | $0.01 |
| 0001-0310 | Inlet protection type A (303SD20-0030) | EACH | 1 | $900.00 | $650.00 | $1,000.00 |
| 0001-0320 | Inlet protection type B (303SD20-0031) | EACH | 16 | $900.00 | $650.00 | $1,000.00 |
| 0001-0330 | Geotextile fabric (303SD20-0032) | SY | 229 | $7.50 | $42.00 | $5.00 |
| 0001-0340 | Temp. silt fence type B (303SD20-0033) | LF | 630 | $8.00 | $11.00 | $10.00 |
| 0001-0350 | Temp. silt fence type A (303SD20-0034) | LF | 566 | $8.00 | $8.00 | $10.00 |
| 0001-0360 | NS geotextile fabric geosynthetic reinforcement (303SX20-0008) | SY | 114 | $6.50 | $15.00 | $25.00 |
| 0001-0370 | Utility test pit asphalt concrete (303SX20-0013) | EACH | 5 | $1,000.00 | $1,800.00 | $850.00 |
| 0001-0380 | NS reinforced soil slope TY. A 1H:2V (303SX20-0017) | SF | 1,955 | $160.00 | $150.00 | $550.00 |
| 0001-0390 | Aggr. matl. no. 1 (305SD20-0010) | TON | 909 | $75.00 | $70.00 | $95.00 |
| 0001-0400 | Manual shoulders restoration (305SP20-0006) | LF | 35 | $100.00 | $115.00 | $100.00 |
| 0001-0410 | Aggr. matl. no. 1 (308SD20-0001) | TON | 3.80 | $250.00 | $80.00 | $95.00 |
| 0001-0420 | Aggr. matl. no. 21A or 21B (308SD20-0006) | TON | 98.60 | $125.00 | $80.00 | $100.00 |
| 0001-0430 | Aggr. matl. no. 21B (308SD20-0007) | TON | 91 | $110.00 | $100.00 | $100.00 |
| 0001-0440 | Aggr. base matl. TY. I no. 21B (309SD20-0010) | TON | 730 | $90.00 | $125.00 | $100.00 |
| 0001-0450 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 169 | $285.00 | $275.00 | $288.00 |
| 0001-0460 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 1,141 | $300.00 | $280.00 | $306.00 |
| 0001-0470 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 444 | $275.00 | $265.00 | $275.00 |
| 0001-0480 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 2,286 | $7.00 | $6.00 | $5.00 |
| 0001-0490 | NS saw-cut hydr.cem.conc.pave. . (316SX20-0010) | LF | 14 | $40.00 | $40.00 | $5.00 |
| 0001-0500 | NS temp support of excavation temporary shoring (402SX20-0002) | LS | 1 | $225,000 | $150,000 | $125,000 |
| 0001-0510 | Steel piles 10" (403SD20-0005) | LF | 423 | $200.00 | $155.00 | $125.00 |
| 0001-0520 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 133 | $100.00 | $100.00 | $98.00 |
| 0001-0530 | Dry riprap CL. AI (414SD20-0007) | SY | 81 | $100.00 | $120.00 | $125.00 |
| 0001-0540 | Curb, STD. CG-2 (502SD20-0011) | LF | 631 | $65.00 | $200.00 | $120.00 |
| 0001-0550 | Curb, radial CG-2 (502SD20-0012) | LF | 292 | $70.00 | $210.00 | $120.00 |
| 0001-0560 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 428 | $90.00 | $230.00 | $125.00 |
| 0001-0570 | Comb. curb & gutter, rad. CG-6 (502SD20-0023) | LF | 176 | $100.00 | $245.00 | $125.00 |
| 0001-0580 | NS comb. curb & gutter . (502SX20-0008) | LF | 76 | $110.00 | $250.00 | $125.00 |
| 0001-0590 | R/W monument RM-2 (503SD20-0002) | EACH | 12 | $100.00 | $700.00 | $500.00 |
| 0001-0600 | Concrete class A3 misc. (504SD20-0001) | CY | 12.10 | $1,350.00 | $1,600.00 | $2,600.00 |
| 0001-0610 | CG-12 detectable warning surface (504SD20-0002) | SY | 16 | $700.00 | $1,500.00 | $2,300.00 |
| 0001-0620 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 385 | $110.00 | $260.00 | $150.00 |
| 0001-0630 | Handrail HR-1 type II (504SD20-0014) | LF | 115 | $360.00 | $525.00 | $600.00 |
| 0001-0640 | Remove EX. guardrail terminal (505SD20-0009) | EACH | 1 | $500.00 | $800.00 | $600.00 |
| 0001-0650 | Guardrail GR-MGS1 (505SD20-0011) | LF | 307 | $42.00 | $50.00 | $42.00 |
| 0001-0660 | Guardrail GR-MGS1, 9' post (505SD20-0013) | LF | 13 | $60.00 | $70.00 | $60.00 |
| 0001-0670 | Radial guardrail GR-MGS1 (505SD20-0014) | LF | 74 | $45.00 | $50.00 | $45.00 |
| 0001-0680 | Guardrail terminal GR- MGS2 (505SD20-0017) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0001-0690 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $1,750.00 | $2,100.00 | $1,800.00 |
| 0001-0700 | Remove existing guardrail (505SD20-0073) | LF | 362 | $8.00 | $15.00 | $12.00 |
| 0001-0710 | Retaining wall RW-3 (506SD20-0002) | CY | 27 | $1,200.00 | $2,400.00 | $3,000.00 |
| 0001-0720 | Retaining wall excavation (506SD20-0007) | CY | 76 | $120.00 | $160.00 | $100.00 |
| 0001-0730 | High visibility fence, 4 feet (507SD20-0027) | LF | 294 | $10.00 | $5.00 | $5.00 |
| 0001-0740 | Demo. of pavement flexible (508SD20-0004) | SY | 995 | $40.00 | $12.00 | $30.00 |
| 0001-0750 | Flowable backfill (509SD20-0001) | CY | 15.60 | $600.00 | $1,000.00 | $400.00 |
| 0001-0760 | Adjust exist. valve & box (510SD20-0038) | EACH | 2 | $750.00 | $1,500.00 | $2,000.00 |
| 0001-0770 | NS remove exist. mast arm (510SX20-0040) | EACH | 1 | $2,500.00 | $2,000.00 | $4,000.00 |
| 0001-0780 | Allaying dust (511SD20-0001) | HR | 730 | $1.00 | $90.00 | $20.00 |
| 0001-0790 | Traffic barrier service MB-11A (512SD20-0003) | LF | 330 | $90.00 | $100.00 | $80.00 |
| 0001-0800 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 4 | $22,000 | $33,500 | $20,000 |
| 0001-0810 | Type 3 barricade 8' (512SD20-0013) | EACH | 14 | $650.00 | $600.00 | $800.00 |
| 0001-0820 | Temporary sign (512SD20-0014) | SF | 371 | $45.00 | $26.00 | $35.00 |
| 0001-0830 | Aggregate material no. 25 or 26 (512SD20-0015) | TON | 81 | $90.00 | $100.00 | $90.00 |
| 0001-0840 | Truck mounted attenuator (512SD20-0023) | HR | 2,544 | $25.00 | $90.00 | $35.00 |
| 0001-0850 | Group 2 channelizing devices (512SD20-0024) | DAY | 21,188 | $4.00 | $3.00 | $2.00 |
| 0001-0860 | Port.changeable mess. sign (512SD20-0025) | HR | 6,048 | $15.00 | $12.00 | $8.00 |
| 0001-0870 | Flagger service (512SD20-0027) | HR | 600 | $40.00 | $85.00 | $45.00 |
| 0001-0880 | Traffic barrier ser. conc. MB-7D PC (512SD20-0031) | LF | 142 | $80.00 | $75.00 | $80.00 |
| 0001-0890 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 19,787 | $1.25 | $1.50 | $1.30 |
| 0001-0900 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 285 | $10.50 | $12.00 | $10.77 |
| 0001-0910 | Portable temporary rumble strip array (512SP20-0001) | DAY | 730 | $10.00 | $125.00 | $10.00 |
| 0001-0920 | NS police patrol uniformed flaggers (512SX20-0040) | HR | 100 | $100.00 | $100.00 | $100.00 |
| 0001-0930 | NS temp. traffic control signal int. 1 (512SX20-0050) | LS | 1 | $180,000 | $120,000 | $150,000 |
| 0001-0940 | Mobilization (513SD20-0001) | LS | 1 | $272,000 | $340,000 | $290,000 |
| 0001-0950 | Field office TY.III (514SD20-0003) | MO | 14 | $5,000.00 | $4,000.00 | $3,000.00 |
| 0001-0960 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 7,906 | $8.50 | $9.00 | $8.10 |
| 0001-0970 | Flexible pavement planing above 4" (515SD20-0015) | SY | 222 | $150.00 | $150.00 | $144.00 |
| 0001-0980 | Construction surveying constr. (517SD20-0001) | LS | 1 | $85,000 | $59,000 | $100,000 |
| 0001-0990 | 3/4" water service line (520SD20-0002) | LF | 165 | $40.00 | $45.00 | $100.00 |
| 0001-1000 | 1" water service line (520SD20-0003) | LF | 71 | $50.00 | $45.00 | $100.00 |
| 0001-1010 | 2" water service line (520SD20-0006) | LF | 12 | $200.00 | $320.00 | $100.00 |
| 0001-1020 | 16" DI water main (520SD20-0024) | LF | 108 | $200.00 | $460.00 | $1,500.00 |
| 0001-1030 | 16" bend (520SD20-0041) | EACH | 6 | $5,000.00 | $4,300.00 | $3,000.00 |
| 0001-1040 | 16" branch (520SD20-0049) | EACH | 1 | $9,500.00 | $6,800.00 | $5,000.00 |
| 0001-1050 | 16" plug or cap (520SD20-0057) | EACH | 1 | $5,500.00 | $1,400.00 | $2,000.00 |
| 0001-1060 | 6" offset exist.pipe (520SD20-0073) | LF | 11 | $625.00 | $700.00 | $900.00 |
| 0001-1070 | 16" gate valve & box (520SD20-0096) | EACH | 1 | $26,500 | $20,000 | $18,000 |
| 0001-1080 | 5/8" water meter box & yoke (520SD20-0167) | EACH | 2 | $3,050.00 | $4,700.00 | $5,500.00 |
| 0001-1090 | NS sewer utility 16" solid sleeve (520SX20-0008) | EACH | 2 | $6,000.00 | $4,400.00 | $10,000 |
| 0001-1100 | Topsoil class B (602SD20-0004) | CY | 532 | $85.00 | $260.00 | $135.00 |
| 0001-1110 | Temporary seed (603SD20-0002) | LB | 173 | $20.00 | $24.00 | $15.00 |
| 0001-1120 | Regular seed (603SD20-0003) | LB | 288 | $20.00 | $20.00 | $15.00 |
| 0001-1130 | Overseeding (603SD20-0004) | LB | 230 | $12.00 | $20.00 | $15.00 |
| 0001-1140 | Legume seed (603SD20-0005) | LB | 14 | $30.00 | $50.00 | $23.00 |
| 0001-1150 | Legume overseeding (603SD20-0006) | LB | 12 | $18.00 | $50.00 | $23.00 |
| 0001-1160 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 5,990 | $0.75 | $1.50 | $1.00 |
| 0001-1170 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 6,546 | $1.00 | $2.00 | $1.00 |
| 0001-1180 | Sediment retention roll 18" min (603SD20-0011) | LF | 239 | $20.00 | $25.00 | $20.00 |
| 0001-1190 | Fertilizer nitrogen - N (603SD20-0014) | LB | 115 | $3.00 | $4.00 | $3.00 |
| 0001-1200 | Fertilizer phosphorous - P (603SD20-0015) | LB | 81 | $3.00 | $4.00 | $3.00 |
| 0001-1210 | Fertilizer potassium - K (603SD20-0016) | LB | 81 | $3.00 | $4.00 | $3.00 |
| 0001-1220 | Lime (603SD20-0017) | TON | 6.33 | $175.00 | $300.00 | $300.00 |
| 0001-1230 | Rolled erosion CTRL product EC-3 type 1 (606SD20-0005) | SY | 558 | $7.50 | $8.00 | $8.00 |
| 0001-1240 | Mowing (608SD20-0001) | HR | 20 | $50.00 | $100.00 | $10.00 |
| 0001-1250 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 16 | $40.00 | $26.00 | $21.50 |
| 0001-1260 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 44 | $45.00 | $42.00 | $26.00 |
| 0001-1270 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 10 | $40.00 | $35.00 | $24.00 |
| 0001-1280 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 3 | $1,000.00 | $1,000.00 | $710.00 |
| 0001-1290 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 4 | $1,250.00 | $1,500.00 | $1,078.00 |
| 0001-1300 | Electrical service SE-5 (700SD20-0060) | EACH | 1 | $75.00 | $9,000.00 | $9,768.00 |
| 0001-1310 | Pedestal pole PF-2, 12' (700SD20-0067) | EACH | 2 | $2,200.00 | $2,100.00 | $2,250.00 |
| 0001-1320 | Conc. found. PF-8 (700SD20-0068) | CY | 20 | $1,200.00 | $2,000.00 | $1,168.00 |
| 0001-1330 | Conc. found. PF-2 (700SD20-0069) | EACH | 2 | $1,600.00 | $1,465.00 | $1,359.00 |
| 0001-1340 | Signal mast arm pole MP- 3, TY. A (700SD20-0090) | EACH | 1 | $26,000 | $28,000 | $26,311 |
| 0001-1350 | Signal mast arm pole MP- 3, TY. C (700SD20-0093) | EACH | 1 | $37,000 | $38,000 | $37,545 |
| 0001-1360 | Mast arm 49' (700SD20-0100) | EACH | 2 | $14,000 | $16,400 | $13,844 |
| 0001-1370 | Mast arm 70' (700SD20-0103) | EACH | 1 | $22,000 | $23,600 | $21,755 |
| 0001-1380 | 14/4 conductor cable (700SD20-0112) | LF | 2,475 | $6.00 | $5.80 | $6.34 |
| 0001-1390 | 14/7 conductor cable (700SD20-0114) | LF | 650 | $7.00 | $6.60 | $7.21 |
| 0001-1400 | Cat 5E direct burial cable (700SD20-0124) | LF | 625 | $5.50 | $5.30 | $5.74 |
| 0001-1410 | Electrical service work pad (700SD20-0174) | EACH | 1 | $1,525.00 | $1,470.00 | $1,602.00 |
| 0001-1420 | Junction box JB-S2 (700SD20-0178) | EACH | 7 | $3,500.00 | $3,850.00 | $3,615.00 |
| 0001-1430 | Junction box JB-S3 (700SD20-0179) | EACH | 1 | $3,850.00 | $3,950.00 | $3,969.00 |
| 0001-1440 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 5 | $230.00 | $220.00 | $239.00 |
| 0001-1450 | Bored conduit 2" (700SD20-0191) | LF | 230 | $52.00 | $70.00 | $55.00 |
| 0001-1460 | Bored conduit 3" (700SD20-0192) | LF | 330 | $62.00 | $75.00 | $64.00 |
| 0001-1470 | Conduit PVC 2" (700SD20-0194) | LF | 1,100 | $9.00 | $8.00 | $9.28 |
| 0001-1480 | Conduit PVC 3" (700SD20-0195) | LF | 30 | $10.75 | $10.00 | $11.12 |
| 0001-1490 | Trench excavation eci-1 (700SD20-0197) | LF | 1,075 | $10.50 | $15.00 | $11.00 |
| 0001-1500 | Test bore (700SD20-0199) | EACH | 2 | $9,000.00 | $10,000 | $9,477.00 |
| 0001-1510 | NS traffic signalization atc cabinet 4-door configuration (700SX20-0010) | EACH | 1 | $65,000 | $65,000 | $67,481 |
| 0001-1520 | NS traffic signalization atc cabinet type II 16- outputs (700SX20-0010) | EACH | 1 | $65,000 | $65,000 | $67,841 |
| 0001-1530 | NS traffic signalization install video detection system, type II (700SX20-0010) | EACH | 1 | $1,900.00 | $5,500.00 | $1,969.00 |
| 0001-1540 | NS traffic signalization install video sensor unit, type II (700SX20-0010) | EACH | 4 | $1,000.00 | $1,900.00 | $1,026.00 |
| 0001-1550 | NS conc foundation CF-5 (700SX20-0022) | EACH | 1 | $3,250.00 | $3,100.00 | $3,380.00 |
| 0001-1560 | Sign panel (701SD20-0001) | SF | 149 | $85.00 | $80.00 | $89.00 |
| 0001-1570 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 36 | $650.00 | $600.00 | $664.00 |
| 0001-1580 | Pedestrian actuation PA-2 (703SD20-0011) | EACH | 2 | $2,050.00 | $2,000.00 | $2,122.00 |
| 0001-1590 | Evp detection system 4- way (703SD20-0023) | EACH | 1 | $20,000 | $22,000 | $1,988.00 |
| 0001-1600 | Evp detector cable (703SD20-0024) | LF | 625 | $8.00 | $7.50 | $8.33 |
| 0001-1610 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 7 | $800.00 | $750.00 | $815.00 |
| 0001-1620 | Hanger assembly SMB-2, one way (703SD20-0037) | EACH | 2 | $720.00 | $680.00 | $745.00 |
| 0001-1630 | Remove existing pole (703SD20-0044) | EACH | 1 | $3,900.00 | $8,000.00 | $4,069.00 |
| 0001-1640 | Remove existing foundation (703SD20-0045) | EACH | 2 | $4,500.00 | $6,000.00 | $4,595.00 |
| 0001-1650 | Remove existing controller (703SD20-0047) | EACH | 1 | $520.00 | $4,200.00 | $538.00 |
| 0001-1660 | Uninterrupt. PWR supply type 2 (703SD20-0053) | EACH | 1 | $11,500 | $14,700 | $11,751 |
| 0001-1670 | Uninterrupt. PWR supply battery pac (703SD20-0054) | EACH | 1 | $5,300.00 | $5,000.00 | $5,510.00 |
| 0001-1680 | Pedestrian signal head SP-8 (703SD20-0060) | EACH | 2 | $1,900.00 | $1,800.00 | $1,976.00 |
| 0001-1690 | Type A PVMT line MRKG 6" (704SD20-0002) | LF | 4,351 | $2.50 | $3.00 | $2.40 |
| 0001-1700 | Type A PVMT line MRKG 8" (704SD20-0003) | LF | 10,261 | $2.50 | $3.25 | $2.44 |
| 0001-1710 | Type A PVMT line MRKG 24" (704SD20-0005) | LF | 100 | $8.50 | $10.00 | $8.68 |
| 0001-1720 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 6,050 | $2.00 | $2.00 | $1.90 |
| 0001-1730 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 3,900 | $2.20 | $2.50 | $2.10 |
| 0001-1740 | Type B class II PVMT line MRKG 8" (704SD20-0013) | LF | 100 | $7.25 | $7.00 | $7.50 |
| 0001-1750 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 115 | $25.00 | $25.00 | $25.50 |
| 0001-1760 | PVMT symb MRKG SGL turn arrow TY A (704SD20-0046) | EACH | 10 | $100.00 | $100.00 | $102.00 |
| 0001-1770 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 14 | $420.00 | $400.00 | $426.00 |
| 0001-1780 | PVMT MSG. mark. “school” TY B, CL II, 8’ (704SD20-0111) | EACH | 1 | $1,250.00 | $1,500.00 | $1,289.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.