Abernathy Construction Corporation: VDOT bid record

Abernathy Construction Corporation submitted 85 bids on Virginia DOT contracts in the data, from 26 MAR 2002 to 24 JUN 2026, and was the low bidder on 24 of them (28%). When it was not low, its total sat a median +14% above the low bid.

Owner
Virginia DOT
Low bid volume
$42,917,919
Latest bid
24 JUN 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

85Bids
24Low bids
28Win rate, percent
+14%Median gap to the low bid when not low, 61 bids

By year

YearBidsLow bidsWin rate
20024250%
200312217%
20046117%
20054125%
2006600%
20075240%
2008100%
20092150%
20104375%
20115240%
20125360%
20135120%
20155120%
20166233%
2017100%
2018300%
20195240%
2020200%
202111100%
2026300%
Abernathy Construction Corporation, VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fredericksburg431126%
Richmond20840%
Hampton Roads14214%
Culpeper5240%
Northern Virginia3133%
Abernathy Construction Corporation, VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Dewatering basin EC-8303SD20-0028EACH5131 (61%)$650.00$1,000.00
Alt.breakaway cable term. GR-9505SD20-0038EACH4326 (60%)$2,290.00$2,425.00
Check dam rock TY. II303SD20-0023EACH4123 (56%)$205.00$250.00
Temp. silt fence type A303SD20-0034LF5422 (41%)$4.00$3.00
Regular seed603SD20-0003LB5122 (43%)$20.00$13.50
Flagger service512SD20-0027HR4121 (51%)$18.00$20.00
Demo. of pavement flexible508SD20-0004SY3220 (63%)$6.50$9.00
Guardrail GR-2505SD20-0030LF3818 (47%)$18.50$18.00
Siltation control excavation303SD20-0029CY5116 (31%)$10.00$3.50
Regular excavation303SD20-0001CY3815 (39%)$30.00$31.00
Borrow excavation305SD20-0001CY3415 (44%)$17.50$20.00
Group 2 channelizing devices512SD20-0024DAY5113 (25%)$1.00$1.00
Abernathy Construction Corporation, VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Bryant Contracting, Inc.158 of 15
Corman Construction, Inc.146 of 14
J. L. Kent & Sons, Inc.129 of 12
D. W. Lyle Corporation84 of 8
Howard Brothers Contractor, Inc.62 of 6
Curtis Contracting, Inc.64 of 6
Burleigh Construction Co., Inc.65 of 6
J. Sanders Construction Co.54 of 5
Infrastructure and Industrial Constructors Southeast, Inc.52 of 5
English Construction Company, Incorporated42 of 4
Abernathy Construction Corporation, VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 JUN 2026C0000121544B01RichmondSuperstructure replacement2 of 5$968,111+5.0%
25 MAR 2026C0000121531B68Hampton RoadsBridge replacement over seacock swamp4 of 7$4,946,794+24%
04 FEB 2026C0000122528N01Hampton RoadsCulvert replacement3 of 6$1,977,315+91%
20 JAN 2021C0000109988C01RichmondSgr - bridge replacement over newfound river1 of 3$986,476Low, 2.0% under the second
16 DEC 2020C0000101034C01RichmondSmart scale - intersection improvement3 of 3$7,903,057+20%
21 OCT 2020C0000111392B46FredericksburgSgr - legacy bridge replacement over south river2 of 3$1,074,780+9.0%
25 SEP 2019C0000110111B21FredericksburgSgr - sbl bridge replacement over mattaponi river3 of 3$5,906,892+3.0%
25 SEP 2019C0000110901B11FredericksburgSgr - bridge replacement over exol swamp2 of 3$1,475,159+9.0%
25 SEP 2019C000110088B13FredericksburgSgr - bridge replacement over piscataway creek2 of 2$1,232,606+13%
21 AUG 2019C0000110112B17FredericksburgSgr - bridge replacement over harrison's creek1 of 2$1,067,062Low, 12% under the second
15 JAN 2019C000114662B10Northern VirginiaRte. 634 over clarks millpond, northumberland county1 of 2$1,258,633Low, 18% under the second
28 MAR 2018C0000104965B63Hampton RoadsSgr - bridge on rte. 308 over three creek3 of 3$2,737,042+26%
01 MAR 2018CM618BEB39549FredericksburgCulvert replacement - rte. 608 over massaponax creek2 of 2$783,991+1.0%
26 JAN 20180M618BEA39521Northern VirginiaCulvert rehabilitation- rte 3 over laten's swamp3 of 3$655,089+33%
23 AUG 2017C0000104009M01Hampton RoadsBridge replacements over blackwater river3 of 3$3,971,024+21%
21 DEC 2016C0000081502B15FredericksburgBridge route 1003 (chelsea road) over sandy creek2 of 3$1,240,725+1.0%
24 AUG 2016C00101493B39Hampton RoadsProp bridge rte 35 (main st/meherrin rd) over tarrara creek1 of 3$1,797,486Low, 3.0% under the second
22 JUN 2016C0000100828B01FredericksburgBridge replacement on rte 721 over beverly creek2 of 3$1,643,455+10%
27 APR 2016C000106606D643RichmondRte 729 - replace pipe3 of 3$645,381+79%
24 FEB 2016C0000100951B32Hampton RoadsReplacement brdg. over mill swamp & over stalling creek1 of 3$1,775,519Low, 14% under the second
24 FEB 2016C0000104689M01FredericksburgRoute 360 / route 3 business pedestrian accommodations2 of 2$417,439+37%
16 DEC 2015C0000101243C01RichmondRte 604 - replace bridge over tomahawk creek3 of 3$2,047,230+26%
18 NOV 2015C0000093079B65Hampton RoadsRte. 659 bridge over flat swamp2 of 3$1,451,988+13%
28 OCT 2015C000002103C03BNorthern VirginiaIntersection reconstruction with route 2053 of 3$1,430,388+19%
20 MAY 2015C00097521B08BFredericksburgRoute 198 (dutton road) over harper creek2 of 2$1,761,224+28%
Abernathy Construction Corporation: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy