VDOT contract C0000121544B01 bid tabulation
Superstructure replacement. Let by Virginia DOT on June 24, 2026, Henrico, Richmond. 5 bids received; low bid $924,275 by Freyssinet, Inc..
- Owner
- Virginia DOT
- Letting
- 24 JUN 2026
- Pay items
- 55
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Freyssinet, Inc. | $924,275 | Low |
| 2 | Abernathy Construction Corporation | $968,111 | +5.0% |
| 3 | Gemstone, LLC | $981,010 | +6.0% |
| 4 | Caton Construction Group, Inc. | $987,241 | +7.0% |
| 5 | TERRA SITE CONSTRUCTORS, LLC dba TERRA | $1,194,441 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Freyssinet, Inc. | 2. Abernathy Construction Corporation | 3. Gemstone, LLC | 4. Caton Construction Group, Inc. | 5. TERRA SITE CONSTRUCTORS, LLC dba TERRA |
|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Regular excavation (303SD20-0001) | CY | 25 | $178.60 | $900.00 | $232.00 | $150.00 | $458.00 |
| 0001-0020 | Borrow excavation (303SD20-0007) | CY | 10 | $114.24 | $600.00 | $232.00 | $250.00 | $352.00 |
| 0001-0030 | Siltation control excavation (303SD20-0029) | CY | 53 | $26.28 | $30.00 | $232.00 | $20.00 | $163.00 |
| 0001-0040 | Temp. silt fence type A (303SD20-0034) | LF | 310 | $12.57 | $8.00 | $11.11 | $15.00 | $10.40 |
| 0001-0050 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 88 | $114.07 | $140.00 | $46.30 | $95.00 | $161.00 |
| 0001-0060 | Asphalt concrete TY. IM- 19.0D const (315SD20-0005) | TON | 18 | $761.61 | $310.00 | $833.00 | $130.00 | $551.00 |
| 0001-0070 | Asphalt concrete TY. SM- 9.5D const (315SD20-0008) | TON | 57 | $618.80 | $315.00 | $833.00 | $140.00 | $473.00 |
| 0001-0080 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 13 | $666.40 | $320.00 | $833.00 | $120.00 | $630.00 |
| 0001-0090 | Saw-cut asphalt concrete (full depth) (315SD20-0104) | LF | 60 | $148.76 | $60.00 | $23.15 | $20.00 | $33.00 |
| 0001-0100 | Structure excavation const. (401SD20-0001) | CY | 34 | $362.28 | $110.00 | $232.00 | $100.00 | $222.00 |
| 0001-0110 | Cofferdam (401SD20-0007) | EACH | 1 | $27,006 | $6,200.00 | $70,000 | $11,000 | $44,900 |
| 0001-0120 | Concrete class A3, substruct. const. (404SD20-0011) | CY | 0.40 | $10,441 | $36,600 | $5,555.00 | $4,800.00 | $35,260 |
| 0001-0130 | Shear keys (404SP20-0002) | CF | 12.90 | $641.17 | $820.00 | $787.00 | $1,100.00 | $969.00 |
| 0001-0140 | VA adjacent member conn. block-outs (404SP20-0003) | CF | 64 | $641.17 | $820.00 | $787.00 | $350.00 | $552.00 |
| 0001-0150 | Prest. conc. slab 4' X 18" X(+40'-45') (405SD20-0026) | EACH | 7 | $41,004 | $25,000 | $46,300 | $41,000 | $46,890 |
| 0001-0160 | NS prestressed concrete slab 4'-9" X 18" X (+40'-45') (405SX20-0004) | EACH | 2 | $32,031 | $25,000 | $42,000 | $50,000 | $57,250 |
| 0001-0170 | CR reinf. steel CL. I SPR. struct. const. (406SD20-0003) | LB | 460 | $5.58 | $3.40 | $9.26 | $7.00 | $11.80 |
| 0001-0180 | CR reinf. steel CL. I substruct. const. (406SD20-0008) | LB | 100 | $5.58 | $3.50 | $9.26 | $30.00 | $6.10 |
| 0001-0190 | Railing kansas corral 32" W/out curb const. (410SD20-0010) | LF | 86 | $109.76 | $760.00 | $510.00 | $700.00 | $541.00 |
| 0001-0200 | Crack repair type B (412SD20-0013) | LF | 54 | $74.89 | $1,300.00 | $204.00 | $270.00 | $149.00 |
| 0001-0210 | Embedded galvanic anodes (412SD20-0017) | EACH | 15 | $53.53 | $360.00 | $65.00 | $60.00 | $101.00 |
| 0001-0220 | Concrete substruct. surface repair (412SD20-0061) | SY | 4 | $2,686.08 | $8,200.00 | $3,700.00 | $580.00 | $2,510.00 |
| 0001-0230 | NS env.& worker protect. (VA. STR. no. 043-5054) (413SX20-0003) | LS | 1 | $11,424 | $4,900.00 | $23.00 | $6,300.00 | $5,890.00 |
| 0001-0240 | NS material disposal (VA. STR. no. 043-5054) (413SX20-0004) | LS | 1 | $5,712.04 | $9,100.00 | $23.00 | $4,400.00 | $26,350 |
| 0001-0250 | NS rem. port.of EX.STR. (VA. STR. no. 043-5054) (413SX20-0005) | LS | 1 | $113,703 | $116,000 | $23.00 | $186,637 | $206,770 |
| 0001-0260 | Waterproofing – epoxy resin type EP-3B/EP-3T (416SD20-0003) | SY | 63 | $180.39 | $330.00 | $148.00 | $315.00 | $394.00 |
| 0001-0270 | Crossdrain CD-2 (501SD20-0007) | LF | 72 | $42.46 | $40.00 | $121.00 | $150.00 | $148.00 |
| 0001-0280 | Outlet pipe (501SD20-0009) | LF | 28 | $42.46 | $65.00 | $463.00 | $80.00 | $133.00 |
| 0001-0290 | Demo. of pavement flexible (508SD20-0004) | SY | 56 | $111.99 | $51.00 | $46.00 | $150.00 | $96.60 |
| 0001-0300 | Type 3 barricade 4' (512SD20-0012) | EACH | 1 | $428.40 | $700.00 | $292.50 | $1,000.00 | $491.00 |
| 0001-0310 | Type 3 barricade 8' (512SD20-0013) | EACH | 5 | $523.60 | $1,010.00 | $357.50 | $1,300.00 | $624.00 |
| 0001-0320 | Temporary sign (512SD20-0014) | SF | 708 | $41.89 | $71.00 | $28.60 | $48.00 | $34.50 |
| 0001-0330 | Group 2 channelizing devices (512SD20-0024) | DAY | 996 | $0.48 | $3.90 | $0.33 | $3.00 | $1.30 |
| 0001-0340 | Port.changeable mess. sign (512SD20-0025) | HR | 2,688 | $3.67 | $8.90 | $9.57 | $18.00 | $3.70 |
| 0001-0350 | Traffic barrier ser. conc. MB-7D PC (512SD20-0031) | LF | 40 | $119.80 | $86.00 | $110.00 | $190.00 | $183.00 |
| 0001-0360 | Mobilization (513SD20-0001) | LS | 1 | $63,823 | $86,000 | $115,000 | $50,000 | $85,000 |
| 0001-0370 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 221 | $28.56 | $72.00 | $84.00 | $21.00 | $17.40 |
| 0001-0380 | Construction surveying constr. (517SD20-0001) | LS | 1 | $36,557 | $19,500 | $6,000.00 | $11,000 | $16,340 |
| 0001-0390 | Topsoil class B 2" (602SD20-0003) | ACRE | 0.10 | $11,424 | $31,300 | $50.00 | $110,000 | $221,590 |
| 0001-0400 | Temporary seed (603SD20-0002) | LB | 5 | $47.60 | $205.00 | $4.80 | $13.00 | $44.30 |
| 0001-0410 | Regular seed (603SD20-0003) | LB | 13 | $95.20 | $390.00 | $4.80 | $18.00 | $15.30 |
| 0001-0420 | Overseeding (603SD20-0004) | LB | 11 | $95.20 | $390.00 | $4.80 | $16.00 | $37.30 |
| 0001-0430 | Legume seed (603SD20-0005) | LB | 1 | $476.00 | $760.00 | $6.00 | $13.00 | $198.00 |
| 0001-0440 | Legume overseeding (603SD20-0006) | LB | 1 | $476.00 | $771.00 | $6.00 | $13.00 | $198.00 |
| 0001-0450 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 303 | $19.99 | $9.00 | $2.40 | $4.00 | $4.90 |
| 0001-0460 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 242 | $30.46 | $9.20 | $3.60 | $4.00 | $4.90 |
| 0001-0470 | Fertilizer nitrogen - N (603SD20-0014) | LB | 5 | $66.64 | $23.00 | $6.00 | $15.00 | $41.70 |
| 0001-0480 | Fertilizer phosphorous - P (603SD20-0015) | LB | 4 | $66.64 | $23.00 | $6.00 | $20.00 | $19.60 |
| 0001-0490 | Fertilizer potassium - K (603SD20-0016) | LB | 4 | $66.64 | $23.00 | $6.00 | $20.00 | $19.60 |
| 0001-0500 | Lime (603SD20-0017) | TON | 0.28 | $1,904.01 | $1,300.00 | $120.00 | $2,500.00 | $1,080.00 |
| 0001-0510 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 4 | $238.00 | $340.00 | $162.50 | $180.00 | $125.00 |
| 0001-0520 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 32 | $47.60 | $61.00 | $32.50 | $20.00 | $45.00 |
| 0001-0530 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 6 | $2,380.02 | $1,100.00 | $1,625.00 | $700.00 | $512.00 |
| 0001-0540 | Sign panel (701SD20-0001) | SF | 24 | $114.24 | $80.00 | $78.00 | $30.00 | $46.60 |
| 0001-0550 | Type A PVMT line MRKG 4" (704SD20-0001) | LF | 512 | $36.18 | $8.00 | $24.70 | $8.00 | $17.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of June 24, 2026. Compiled by Mirage Metrics.