Gemstone, LLC: VDOT bid record

Gemstone, LLC submitted 25 bids on Virginia DOT contracts in the data, from 23 SEP 2009 to 28 OCT 2026, and was the low bidder on 6 of them (24%). When it was not low, its total sat a median +49% above the low bid.

Owner
Virginia DOT
Low bid volume
$9,125,642
Latest bid
28 OCT 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

25Bids
6Low bids
24Win rate, percent
+49%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
2009100%
201044100%
2011300%
2012100%
2013100%
202615213%
Gemstone, LLC, VDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Northern Virginia6233%
Fredericksburg500%
Richmond3133%
Hampton Roads3133%
Lynchburg2150%
Culpeper2150%
Staunton200%
Salem100%
Bristol100%
Gemstone, LLC, VDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Group 2 channelizing devices512SD20-0024DAY116 (55%)$1.00$1.00
Temporary sign512SD20-0014SF86 (75%)$22.52$20.00
Electronic arrow board512SD20-0026HR104 (40%)$5.36$5.00
Truck mounted attenuator512SD20-0023HR93 (33%)$40.63$20.00
Temp. silt fence type A303SD20-0034LF52 (40%)$9.00$3.00
Port.changeable mess. sign512SD20-0025HR91 (11%)$9.57$8.00
Flagger service512SD20-0027HR61 (17%)$82.80$20.00
Bridge deck grooving maint.404SD20-0020SY61 (17%)$31.50$8.00
Embedded galvanic anodes412SD20-0017EACH61 (17%)$61.50$44.50
Flexible pave.planing 0"-2"515SD20-0004SY51 (20%)$70.00$9.11
H.E.S. patching type C412SD20-0036SY51 (20%)$3,400.00$2,500.00
Gemstone, LLC, VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Southern Road & Bridge, LLC73 of 7
Freyssinet, Inc.64 of 6
M. D. Miller Co., Inc.55 of 5
ELITE CONTRACTORS, INC (Use in Va: ELITE41 of 4
Saffo Contractors, Inc.42 of 4
Blastech Enterprises, Inc.41 of 4
Burleigh Construction Co., Inc.31 of 3
Manolis Painting, Inc.32 of 3
Titan Industrial Services, Inc.32 of 3
Structural Technologies, LLC of Maryland32 of 3
Gemstone, LLC, VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026C0000128800N01BFredericksburgOn-call structure recoating6 of 6$9,512,080+122%
26 AUG 2026C0000125143B35Hampton RoadsBridge repairs5 of 9$8,549,980+92%
22 JUL 2026C0000126560B40Northern VirginiaBridge rehabilitation4 of 7$6,227,316+35%
24 JUN 2026C0000127213B53CulpeperBridge deck repair4 of 4$1,320,474+49%
24 JUN 2026C0000126561B48Northern VirginiaBridge rehabilitation4 of 6$2,273,059+23%
24 JUN 2026C0000121544B01RichmondSuperstructure replacement3 of 5$981,010+6.0%
24 JUN 2026C0000128696N01StauntonOn-call bridge repair and preventative maintenance3 of 3$12,897,044+27%
22 APR 2026C0000124151C01LynchburgBridge maintenance - rigid overlay1 of 2$5,669,242Low, 131% under the second
25 MAR 2026C0000124667B70Northern VirginiaBridge painting3 of 4$1,971,000+64%
25 FEB 2026C0000124682B18Northern VirginiaBridge recoating3 of 6$2,030,000+57%
25 FEB 2026C0000120996B89SalemBridge rehabilitation4 of 5$2,395,762+66%
04 FEB 2026C0000093091B01RichmondBridge rehabilitation2 of 5$5,556,893+20%
04 FEB 2026C0000126720N01FredericksburgOn-call concrete repairs3 of 3$2,406,030+90%
04 FEB 2026C0000126721N01FredericksburgOn-call joint repair3 of 4$1,929,904+61%
04 FEB 2026C0000126722N01RichmondOn-call bridge coating1 of 6$1,061,400Low, 25% under the second
27 FEB 2013C00092204B12FredericksburgProposed bridge painting2 of 3$434,024+52%
21 NOV 2012C00101615N22BStauntonRecoat 38 exist. bridges on secondary system3 of 3$3,354,700+121%
21 DEC 2011C00098138N01FredericksburgRecoat five (5) bridges: rte 195 nb over rte 64 rampb/rte 952 of 3$954,000+7.0%
27 JUL 2011C00093400B39LynchburgProposed bridge rehabilitation3 of 3$269,735+21%
27 APR 2011C00097385B02Hampton RoadsBridge painting (3 structures)3 of 3$1,822,000+40%
15 DEC 2010C00097515Northern VirginiaRecoat existing structure1 of 3$134,000Low, 1.0% under the second
15 DEC 2010C00097518Northern VirginiaRecoating existing structures (2)1 of 3$238,000Low, 28% under the second
23 JUN 2010CM0092378N501CulpeperPaint rte. 20 bridge over james river1 of 3$998,000Low, 27% under the second
27 JAN 2010C00093881NO1Hampton RoadsClean and repaint 5 existing structures1 of 3$1,025,000Low, 26% under the second
23 SEP 2009C00089374N01BristolBridge painting (8) structures3 of 3$1,054,000+26%
Gemstone, LLC: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy