VDOT contract C0000126561B48 bid tabulation
Bridge rehabilitation. Let by Virginia DOT on June 24, 2026, Fairfax, Northern Virginia. 6 bids received; low bid $1,855,207 by Rba Engineering International, PLLC.
- Owner
- Virginia DOT
- Letting
- 24 JUN 2026
- Pay items
- 63
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rba Engineering International, PLLC | $1,855,207 | Low |
| 2 | Fort Myer Construction Corporation | $1,896,541 | +2.0% |
| 3 | Martins Construction Corp. | $1,986,541 | +7.0% |
| 4 | Gemstone, LLC | $2,273,059 | +23% |
| 5 | Freyssinet, Inc. | $2,554,894 | +38% |
| 6 | Southern Road & Bridge, LLC | $3,313,355 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rba Engineering International, PLLC | 2. Fort Myer Construction Corporation | 3. Martins Construction Corp. | 4. Gemstone, LLC | 5. Freyssinet, Inc. | 6. Southern Road & Bridge, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001-0010 | Baseline progress schedule (108SP20-0001) | LS | 1 | $14,234 | $27,500 | $30,000 | $5,000.00 | $5,290.00 | $8,500.00 |
| 0001-0020 | Progress schedule updates (108SP20-0002) | EACH | 15 | $713.00 | $750.00 | $100.00 | $550.00 | $1,320.00 | $1,000.00 |
| 0001-0030 | Inlet protection type A (303SD20-0030) | EACH | 1 | $212.00 | $450.00 | $1,200.00 | $700.00 | $1,500.00 | $250.00 |
| 0001-0040 | Temp. silt fence type A (303SD20-0034) | LF | 636 | $6.00 | $18.00 | $13.00 | $9.00 | $7.50 | $5.00 |
| 0001-0050 | NS geotextile fabric EC- 11 (303SX20-0008) | SY | 550 | $24.00 | $6.00 | $2.50 | $20.00 | $7.50 | $7.00 |
| 0001-0060 | Utility test pit unpaved (303SX20-0012) | EACH | 3 | $570.00 | $750.00 | $350.00 | $2,500.00 | $450.00 | $950.00 |
| 0001-0070 | Bridge deck grooving maint. (404SD20-0020) | SY | 773 | $10.00 | $22.00 | $21.00 | $38.00 | $19.00 | $65.00 |
| 0001-0080 | Pier protection system 54", const (410SX20-0011) | LF | 142 | $510.00 | $1,100.00 | $1,100.00 | $190.00 | $425.00 | $1,250.00 |
| 0001-0090 | NS pre. & spot coat EX. STR. STR. no. 2188, type B (411SX20-0001) | SF | 6,396 | $34.00 | $21.64 | $26.00 | $22.00 | $49.00 | $88.00 |
| 0001-0100 | NS zone coat. EX. STR. STR. no. 2188, type B (411SX20-0002) | LS | 1 | $284,690 | $229,152 | $250,000 | $102,000 | $276,000 | $225,000 |
| 0001-0110 | NS disposal of material STR. no. 2188, type B (411SX20-0006) | LS | 1 | $1,899.00 | $5,768.00 | $30,000 | $15,000 | $24,600 | $100,000 |
| 0001-0120 | Crack repair type B (412SD20-0013) | LF | 11 | $117.00 | $132.00 | $120.00 | $400.00 | $95.00 | $185.00 |
| 0001-0130 | Embedded galvanic anodes (412SD20-0017) | EACH | 1,042 | $48.00 | $33.00 | $30.00 | $45.00 | $46.00 | $85.00 |
| 0001-0140 | Embedded galvanic anodes (412SD20-0017) | EACH | 363 | $48.00 | $33.00 | $30.00 | $45.00 | $46.00 | $85.00 |
| 0001-0150 | Patching type B (412SD20-0033) | SY | 23 | $577.00 | $550.00 | $600.00 | $1,600.00 | $1,840.00 | $3,200.00 |
| 0001-0160 | Patching type C (412SD20-0035) | SY | 13 | $853.00 | $1,320.00 | $600.00 | $2,200.00 | $3,560.00 | $4,850.00 |
| 0001-0170 | Expansion joint reconstruction (hes) (412SD20-0041) | LF | 88 | $570.00 | $220.00 | $310.00 | $1,200.00 | $385.00 | $125.00 |
| 0001-0180 | Reconstruct bridge seat type A (412SD20-0062) | EACH | 1 | $1,483.00 | $1,100.00 | $3,850.00 | $5,500.00 | $375.00 | $28,500 |
| 0001-0190 | NS BR.superstr. wid./repair concrete superstructure surface repair (412SX20-0015) | SY | 23 | $875.00 | $1,430.00 | $1,600.00 | $2,400.00 | $1,500.00 | $3,000.00 |
| 0001-0200 | NS BR. substr. wid./repair concrete substructure surface repair (412SX20-0024) | SY | 75 | $802.00 | $1,320.00 | $1,700.00 | $2,200.00 | $2,380.00 | $3,250.00 |
| 0001-0210 | NS env.& worker protect. STR. no. 2188 (413SX20-0003) | LS | 1 | $66,428 | $7,567.00 | $30,000 | $70,000 | $147,000 | $25,000 |
| 0001-0220 | Waterproofing - NS epoxy resin substructure (416SX20-0001) | SY | 355 | $27.00 | $77.00 | $65.00 | $200.00 | $100.00 | $85.00 |
| 0001-0230 | Waterproofing - NS epoxy resin superstructure (416SX20-0001) | SY | 45 | $33.00 | $77.00 | $90.00 | $250.00 | $100.00 | $85.00 |
| 0001-0240 | Adhesive based JT. sealer CL. I, 2" const. (420SD20-0003) | LF | 48 | $108.00 | $77.00 | $120.00 | $165.00 | $120.00 | $125.00 |
| 0001-0250 | Elastomeric expans. dam 0" to 2" SPRSTR maint (421SD20-0006) | LF | 88 | $485.00 | $396.00 | $750.00 | $750.00 | $555.00 | $1,150.00 |
| 0001-0260 | Type A milling 1-3/4" (425SD20-0005) | SY | 773 | $69.00 | $45.00 | $90.00 | $55.00 | $62.00 | $44.00 |
| 0001-0270 | Furn.very erly mod.conc. 2-1/4"- 2-3/4" (425SD20-0013) | CY | 48 | $543.00 | $2,790.00 | $1,900.00 | $2,750.00 | $2,740.00 | $2,950.00 |
| 0001-0280 | Place very early mod.conc.overlay (425SD20-0015) | SY | 773 | $59.00 | $75.00 | $210.00 | $231.00 | $150.00 | $300.00 |
| 0001-0290 | NS type A hydro- demolition 1/2" (425SX20-0006) | SY | 773 | $77.00 | $234.15 | $175.00 | $120.70 | $290.00 | $144.00 |
| 0001-0300 | Partial beam/girder replacement (426SD20-0009) | LB | 680 | $333.00 | $77.00 | $80.00 | $78.00 | $39.00 | $85.00 |
| 0001-0310 | Concrete surface penetrant sealer (428SD20-0001) | SY | 677 | $24.00 | $15.00 | $35.00 | $70.00 | $22.00 | $38.00 |
| 0001-0320 | NS nbis access, under bridge STR. no. 2188 (430SX20-0001) | DAY | 2 | $8,432.00 | $7,500.00 | $750.00 | $2,499.90 | $8,190.00 | $3,500.00 |
| 0001-0330 | Guardrail height transition GR-MGS4 (505SD20-0019) | EACH | 1 | $1,709.00 | $2,070.00 | $2,300.00 | $2,470.00 | $2,950.00 | $3,500.00 |
| 0001-0340 | Guardrail GR-2 (505SD20-0030) | LF | 88 | $48.00 | $57.50 | $60.00 | $36.40 | $82.00 | $48.00 |
| 0001-0350 | Fixed object attach. GR- foa-1 TY. I (505SD20-0045) | EACH | 1 | $6,169.00 | $7,475.00 | $8,000.00 | $3,900.00 | $10,600 | $3,500.00 |
| 0001-0360 | Fixed object attach. GR- foa-5 (505SD20-0055) | EACH | 1 | $5,695.00 | $6,900.00 | $7,500.00 | $6,500.00 | $9,820.00 | $3,500.00 |
| 0001-0370 | Remove existing guardrail (505SD20-0073) | LF | 88 | $11.00 | $11.50 | $12.00 | $25.00 | $16.00 | $65.00 |
| 0001-0380 | High visibility fence, 4 feet (507SD20-0027) | LF | 82 | $5.00 | $20.00 | $16.00 | $13.33 | $180.00 | $50.00 |
| 0001-0390 | Allaying dust (511SD20-0001) | HR | 120 | $82.00 | $1.00 | $30.00 | $5.00 | $130.00 | $3.00 |
| 0001-0400 | Traffic barrier service MB-11A (512SD20-0003) | LF | 550 | $98.00 | $40.00 | $80.00 | $101.40 | $130.00 | $8.00 |
| 0001-0410 | Impact atten.ser. TY. 1 TL- 3, >=40 MPH (512SD20-0007) | EACH | 1 | $7,964.00 | $7,500.00 | $6,500.00 | $3,835.00 | $4,830.00 | $6,500.00 |
| 0001-0420 | Type 3 barricade 4' (512SD20-0012) | EACH | 2 | $313.00 | $400.00 | $465.00 | $357.50 | $450.00 | $325.00 |
| 0001-0430 | Temporary sign (512SD20-0014) | SF | 1,440 | $21.00 | $18.00 | $32.00 | $28.60 | $36.00 | $25.00 |
| 0001-0440 | Truck mounted attenuator (512SD20-0023) | HR | 960 | $28.00 | $35.00 | $12.00 | $40.63 | $36.00 | $150.00 |
| 0001-0450 | Group 2 channelizing devices (512SD20-0024) | DAY | 375 | $15.00 | $58.00 | $1.00 | $0.52 | $8.00 | $1.00 |
| 0001-0460 | Port.changeable mess. sign (512SD20-0025) | HR | 1,440 | $14.00 | $20.00 | $4.50 | $9.57 | $25.00 | $15.00 |
| 0001-0470 | Electronic arrow board (512SD20-0026) | HR | 960 | $7.00 | $8.00 | $3.00 | $5.72 | $6.50 | $7.00 |
| 0001-0480 | Traffic barrier ser. conc. MB-7D PC (512SD20-0031) | LF | 400 | $41.00 | $165.00 | $68.00 | $63.70 | $80.00 | $115.00 |
| 0001-0490 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 4,400 | $4.00 | $3.70 | $4.50 | $9.17 | $12.00 | $9.00 |
| 0001-0500 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 3,400 | $4.00 | $3.31 | $4.25 | $8.54 | $11.00 | $9.00 |
| 0001-0510 | Temp. PVMT MRKG TY. D, CL. III, 8" (512SD20-0063) | LF | 1,000 | $4.00 | $4.46 | $4.70 | $10.61 | $13.00 | $11.00 |
| 0001-0520 | Mobilization (513SD20-0001) | LS | 1 | $153,385 | $100,000 | $125,000 | $336,500 | $105,000 | $300,000 |
| 0001-0530 | Construction surveying constr. (517SD20-0001) | LS | 1 | $13,856 | $60,000 | $30,000 | $15,000 | $16,400 | $15,000 |
| 0001-0540 | Topsoil class A 2" (602SD20-0001) | ACRE | 0.81 | $11,729 | $22,527 | $8,750.00 | $50.00 | $11,600 | $35,000 |
| 0001-0550 | Permanent seed (603SD20-0001) | LB | 219 | $11.00 | $25.00 | $4.50 | $4.80 | $7.50 | $7.00 |
| 0001-0560 | Temporary seed (603SD20-0002) | LB | 81 | $10.00 | $77.21 | $6.50 | $4.80 | $7.50 | $7.00 |
| 0001-0570 | Regular seed (603SD20-0003) | LB | 219 | $11.00 | $20.14 | $6.50 | $4.80 | $7.50 | $7.00 |
| 0001-0580 | Overseeding (603SD20-0004) | LB | 175 | $11.00 | $47.00 | $6.50 | $4.80 | $7.50 | $7.00 |
| 0001-0590 | Fertilizer nitrogen - N (603SD20-0014) | LB | 81 | $9.00 | $40.28 | $7.00 | $6.00 | $5.50 | $7.00 |
| 0001-0600 | Fertilizer phosphorous - P (603SD20-0015) | LB | 57 | $9.00 | $17.90 | $7.00 | $6.00 | $5.50 | $7.00 |
| 0001-0610 | Fertilizer potassium - K (603SD20-0016) | LB | 57 | $9.00 | $20.14 | $7.00 | $6.00 | $5.50 | $7.00 |
| 0001-0620 | Lime (603SD20-0017) | TON | 4.50 | $780.00 | $2,461.73 | $500.00 | $120.00 | $4,340.00 | $5,000.00 |
| 0001-0630 | Type B class VI contrast PVMT line MRKG 6" (704SD20-0031) | LF | 1,300 | $8.00 | $9.45 | $10.25 | $28.09 | $35.00 | $26.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of June 24, 2026. Compiled by Mirage Metrics.