Martins Construction Corp.: VDOT bid record
Martins Construction Corp. submitted 72 bids on Virginia DOT contracts in the data, from 19 NOV 2002 to 22 JUL 2026, and was the low bidder on 42 of them (58%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $3,907,645,794
- Latest bid
- 22 JUL 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 1 | 100% |
| 2003 | 1 | 1 | 100% |
| 2004 | 2 | 1 | 50% |
| 2005 | 4 | 2 | 50% |
| 2006 | 1 | 1 | 100% |
| 2007 | 3 | 3 | 100% |
| 2008 | 5 | 2 | 40% |
| 2009 | 1 | 0 | 0% |
| 2010 | 3 | 0 | 0% |
| 2011 | 5 | 4 | 80% |
| 2012 | 4 | 3 | 75% |
| 2013 | 6 | 1 | 17% |
| 2014 | 6 | 3 | 50% |
| 2015 | 8 | 6 | 75% |
| 2016 | 7 | 5 | 71% |
| 2017 | 1 | 1 | 100% |
| 2019 | 4 | 3 | 75% |
| 2020 | 2 | 1 | 50% |
| 2025 | 2 | 2 | 100% |
| 2026 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 51 | 30 | 59% |
| Culpeper | 11 | 7 | 64% |
| Fredericksburg | 4 | 1 | 25% |
| Staunton | 2 | 1 | 50% |
| Richmond | 2 | 2 | 100% |
| Hampton Roads | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS BR.superstr. wid./repair deck slab closure | 412SX20-0015 | SY | 101 | 53 (52%) | $150.00 | $125.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 53 | 43 (81%) | $4.00 | $8.00 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 46 | 37 (80%) | $0.50 | $1.00 |
| Temporary sign | 512SD20-0014 | SF | 53 | 32 (60%) | $20.20 | $20.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 43 | 32 (74%) | $12.00 | $20.00 |
| NS BR.superstr. wid./repair cleaning and washing - expansion joint drainage trough | 412SX20-0007 | LF | 64 | 30 (47%) | $115.00 | $99.00 |
| Electronic arrow board | 512SD20-0026 | HR | 43 | 30 (70%) | $3.00 | $5.00 |
| NS BR.superstr. wid./repair replace bearing | 412SX20-0009 | EACH | 62 | 25 (40%) | $2,097.00 | $1,500.00 |
| Flagger service | 512SD20-0027 | HR | 33 | 24 (73%) | $20.00 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 22 | 16 (73%) | $2.75 | $3.00 |
| Bridge deck grooving maint. | 404SD20-0020 | SY | 33 | 14 (42%) | $6.40 | $8.00 |
| Concrete substruct. surface repair | 412SD20-0061 | SY | 30 | 12 (40%) | $970.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Fort Myer Construction Corporation | 42 | 11 of 42 |
| Freyssinet, Inc. | 9 | 0 of 9 |
| Lanford Brothers Company, Incorporated | 8 | 0 of 8 |
| Sagres Construction Corporation | 7 | 1 of 7 |
| A & M Concrete Corp. | 7 | 3 of 7 |
| Corman Construction, Inc. | 6 | 2 of 6 |
| M. D. Miller Co., Inc. | 5 | 4 of 5 |
| Rba Engineering International, PLLC | 4 | 2 of 4 |
| Flippo Construction Company, Inc. | 4 | 2 of 4 |
| McClain & Co., Inc. | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | C0000126560B40 | Northern Virginia | Bridge rehabilitation | 1 of 7 | $4,620,121 | Low, 23% under the second |
| 22 JUL 2026 | C0000122360M01 | Fredericksburg | Bridge rehabilitation | 1 of 6 | $8,470,743 | Low, 7.0% under the second |
| 24 JUN 2026 | C0000127213B53 | Culpeper | Bridge deck repair | 2 of 4 | $891,218 | +1.0% |
| 24 JUN 2026 | C0000126561B48 | Northern Virginia | Bridge rehabilitation | 3 of 6 | $1,986,541 | +7.0% |
| 27 MAY 2026 | C0000121826C01 | Northern Virginia | Box culvert replacement | 3 of 4 | $1,985,792 | +24% |
| 22 APR 2026 | C0000124564B64 | Culpeper | Deck replacement | 2 of 6 | $1,393,465 | +6.0% |
| 22 OCT 2025 | C0000118393X01 | Northern Virginia | Retaining wall repair | 1 of 2 | $6,541,131 | Low, 58% under the second |
| 22 OCT 2025 | C0000118396B57 | Northern Virginia | Bridge rehabilitation | 1 of 4 | $7,655,464 | Low, 16% under the second |
| 21 OCT 2020 | C0000111688B69 | Northern Virginia | Sgr bridge rehabilitation | 2 of 3 | $1,103,166 | +9.0% |
| 24 JUN 2020 | C0000112505N01 | Northern Virginia | On-call bridge repair and maintenance | 1 of 2 | $4,180,380 | Low, 18% under the second |
| 05 SEP 2019 | 0000116195C01 | Northern Virginia | Kirby road - emergency operations | 1 of 1 | $2,081,120 | Low |
| 22 MAY 2019 | C0000109130B16 | Culpeper | Nhpp-br07(303)0064-002-926, b616, b617, b618 | 2 of 3 | $2,562,967 | +2.0% |
| 27 FEB 2019 | C0000113505B27B | Culpeper | Nhpp-pm07(315)0066-030-837 b627, b628 | 1 of 2 | $679,500 | Low, 2.0% under the second |
| 23 JAN 2019 | C0000111320B47 | Northern Virginia | Sgr-superstructure replacement over arlington blvd | 1 of 3 | $1,849,448 | Low, 47% under the second |
| 22 FEB 2017 | C000108168B88 | Northern Virginia | I-395 over four mile run bridge repairs and deck overlay | 1 of 2 | $5,489,795 | Low, 4.0% under the second |
| 21 DEC 2016 | C0000106949B30 | Northern Virginia | Rte. 650 (gallows rd.) over rte. 50 bridge rehabilitation | 1 of 3 | $3,223,120 | Low, 18% under the second |
| 26 OCT 2016 | C0000108382B14 | Culpeper | I-64 east and westbound latex overlay over route 781 | 1 of 3 | $735,727 | Low, 9.0% under the second |
| 27 JUL 2016 | C0000108326B07 | Fredericksburg | Bridge repairs at various locations on i-95 | 2 of 3 | $5,336,374 | +5.0% |
| 25 MAY 2016 | C00108260N01 | Culpeper | Polymer overlay, deck & joint repair | 1 of 3 | $1,560,642 | Low, 5.0% under the second |
| 27 APR 2016 | CM000106771N01B | Hampton Roads | Mmmbt north approach waterproofing | 2 of 3 | $5,746,931 | +6.0% |
| 23 MAR 2016 | C0000107669B01 | Northern Virginia | Stp-pm09(332,334,335);br09(333(nfo)0602-029-252,b639,b640 | 1 of 3 | $3,825,876,000 | Low, -8.0% under the second |
| 24 FEB 2016 | C0000105297B01 | Northern Virginia | Bridge maintenance & repair at glebe rd interchange on i-395 | 1 of 3 | $3,498,757 | Low, 5.0% under the second |
| 18 NOV 2015 | CM0000107633C01 | Fredericksburg | On-call bridge maintenance - fredericksburg district | 2 of 2 | $3,399,462 | +22% |
| 26 AUG 2015 | C00106951B69 | Northern Virginia | Proposed bridge repairs on nb & sb rte. 28 over rte. 267 | 1 of 3 | $2,345,790 | Low, 5.0% under the second |
| 20 MAY 2015 | C00082327C01B | Culpeper | Proposed bridge on route 688 (leeds manor road) | 1 of 3 | $1,958,197 | Low, 5.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.