A & M Concrete Corp.: VDOT bid record
A & M Concrete Corp. submitted 135 bids on Virginia DOT contracts in the data, from 19 NOV 2002 to 28 OCT 2026, and was the low bidder on 35 of them (26%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $34,879,347
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 0 | 0% |
| 2003 | 4 | 0 | 0% |
| 2004 | 6 | 1 | 17% |
| 2005 | 8 | 4 | 50% |
| 2006 | 9 | 2 | 22% |
| 2007 | 6 | 2 | 33% |
| 2008 | 8 | 3 | 38% |
| 2009 | 2 | 1 | 50% |
| 2010 | 9 | 2 | 22% |
| 2011 | 16 | 5 | 31% |
| 2012 | 23 | 4 | 17% |
| 2013 | 10 | 3 | 30% |
| 2014 | 13 | 2 | 15% |
| 2015 | 6 | 2 | 33% |
| 2016 | 1 | 0 | 0% |
| 2017 | 4 | 0 | 0% |
| 2018 | 2 | 1 | 50% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2021 | 1 | 1 | 100% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 110 | 29 | 26% |
| Staunton | 10 | 3 | 30% |
| Fredericksburg | 9 | 3 | 33% |
| Culpeper | 3 | 0 | 0% |
| Hampton Roads | 1 | 0 | 0% |
| Lynchburg | 1 | 0 | 0% |
| Salem | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Group 2 channelizing devices | 512SD20-0024 | DAY | 102 | 55 (54%) | $1.00 | $1.00 |
| Electronic arrow board | 512SD20-0026 | HR | 79 | 52 (66%) | $3.50 | $5.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 69 | 38 (55%) | $6.00 | $8.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 70 | 37 (53%) | $3.00 | $5.00 |
| Temporary sign | 512SD20-0014 | SF | 89 | 35 (39%) | $22.00 | $20.00 |
| Flagger service | 512SD20-0027 | HR | 77 | 28 (36%) | $23.00 | $20.00 |
| Truck mounted attenuator | 512SD20-0023 | HR | 71 | 28 (39%) | $23.00 | $20.00 |
| Lime | 603SD20-0017 | TON | 55 | 28 (51%) | $375.00 | $200.00 |
| Underdrain UD-4 | 501SD20-0004 | LF | 43 | 26 (60%) | $12.00 | $12.46 |
| Inlet protection type B | 303SD20-0031 | EACH | 54 | 23 (43%) | $187.50 | $250.00 |
| Hydr. cement conc. sidewalk 4" | 504SD20-0003 | SY | 48 | 23 (48%) | $44.00 | $55.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 71 | 21 (30%) | $4.00 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Fort Myer Construction Corporation | 44 | 20 of 44 |
| Arthur Construction Co., Inc. | 42 | 30 of 42 |
| Sagres Construction Corporation | 18 | 4 of 18 |
| Tavares Concrete Co., Inc. | 15 | 7 of 15 |
| Finley Asphalt & Sealing, Inc. | 14 | 7 of 14 |
| D&F Construction, Inc. | 8 | 5 of 8 |
| Martins Construction Corp. | 7 | 4 of 7 |
| General Excavation, Inc. | 7 | 3 of 7 |
| M & F Concrete, Inc. | 7 | 3 of 7 |
| Civil Construction, L.L.C. | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000124007C01 | Staunton | Smart scale - safety improvements | 2 of 3 | $990,680 | +5.0% |
| 22 JUL 2026 | C0000119114C01 | Northern Virginia | Smart scale - intersection improvements | 1 of 2 | $2,912,491 | Low, 14% under the second |
| 27 MAY 2026 | C0000119206C01 | Culpeper | Smart scale - int. improvements / lane addition | 3 of 6 | $2,199,938 | +18% |
| 27 OCT 2021 | C000110913C01B | Fredericksburg | Smart scale - intersection improvements | 1 of 3 | $387,469 | Low, 6.0% under the second |
| 18 NOV 2020 | C0000109814C01 | Northern Virginia | Add left turn lane | 2 of 3 | $2,804,899 | 0.0% |
| 27 MAY 2020 | C0000116756S01 | Northern Virginia | Repair crosswalks on us 50 in middleburg | 1 of 3 | $479,775 | Low, 31% under the second |
| 24 APR 2019 | C0000109272C01 | Northern Virginia | Evergreen mills rd int. improvements at relocated rte 771 | 2 of 3 | $1,563,333 | +1.0% |
| 28 MAR 2018 | C0000110330C01 | Northern Virginia | Road widening - ph i | 3 of 3 | $921,586 | +45% |
| 24 JAN 2018 | C0000105597M01 | Northern Virginia | Rte 234 - dumfries road - pedestrian improvements | 1 of 3 | $293,224 | Low, 2.0% under the second |
| 20 DEC 2017 | C000106942M01 | Northern Virginia | Roundabout @ intersection of poland road & edgewater street | 2 of 3 | $959,467 | +21% |
| 26 APR 2017 | C0000109577N01 | Lynchburg | Rte 60 - construct sidewalk, rte 1001 construct sidewalk | 2 of 3 | $930,403 | +12% |
| 26 APR 2017 | C000108695N01 | Salem | Ada ramp compliance | 2 of 2 | $213,215 | +37% |
| 22 FEB 2017 | C0000104804C01 | Northern Virginia | Rte 234 & stockbridge swm modification | 3 of 3 | $341,114 | +11% |
| 24 FEB 2016 | C0000106581M01 | Northern Virginia | Construct shared use path-braddock rd. pleasant forest trail | 2 of 3 | $384,551 | +21% |
| 16 DEC 2015 | C0000098372M01B | Northern Virginia | 0.11 mi. grade, drain, asph. pave. and signal | 2 of 3 | $1,344,373 | +4.0% |
| 28 OCT 2015 | C000093568M501 | Northern Virginia | 0.554 mi. grade, drain and asph pave. | 1 of 2 | $2,557,371 | Low, 8.0% under the second |
| 22 JUL 2015 | C0000103887M01 | Northern Virginia | Rte. 50 traffic calming-town of middleburg | 3 of 3 | $6,360,583 | +56% |
| 22 JUL 2015 | C00107363N01 | Northern Virginia | Rural rustic road improvements | 3 of 3 | $2,234,840 | +15% |
| 20 MAY 2015 | 000017601C01B | Northern Virginia | Shared use path | 1 of 3 | $1,218,694 | Low, 2.0% under the second |
| 20 MAY 2015 | C00100632M01 | Northern Virginia | Ryan road (route 772) shared use path | 2 of 3 | $409,177 | +17% |
| 22 OCT 2014 | C00098371M01 | Northern Virginia | Hsip-5a01(577)(nfo)0784-076-050, m501 | 2 of 3 | $1,239,718 | +2.0% |
| 24 SEP 2014 | C0000104687N01 | Fredericksburg | Rte. 620 - signal and median modification | 1 of 3 | $221,198 | Low, 6.0% under the second |
| 11 SEP 2014 | C00106405M01 | Northern Virginia | North kings hwy emergency pipe replacement | 3 of 3 | $445,710 | +117% |
| 27 AUG 2014 | C00096752M01 | Northern Virginia | Construct shared use path on ease side of signal view drive | 2 of 3 | $278,290 | +5.0% |
| 27 AUG 2014 | C00106346N01 | Northern Virginia | Incidental conc. replacement | 3 of 3 | $1,334,325 | +40% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.