M & F Concrete, Inc.: VDOT bid record
M & F Concrete, Inc. submitted 45 bids on Virginia DOT contracts in the data, from 01 FEB 2012 to 28 OCT 2026, and was the low bidder on 18 of them (40%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $9,156,158
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2012 | 3 | 0 | 0% |
| 2013 | 2 | 0 | 0% |
| 2014 | 6 | 2 | 33% |
| 2015 | 1 | 1 | 100% |
| 2016 | 7 | 2 | 29% |
| 2017 | 3 | 1 | 33% |
| 2018 | 6 | 5 | 83% |
| 2019 | 9 | 4 | 44% |
| 2020 | 3 | 1 | 33% |
| 2021 | 2 | 1 | 50% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Northern Virginia | 19 | 8 | 42% |
| Staunton | 15 | 7 | 47% |
| Fredericksburg | 5 | 1 | 20% |
| Richmond | 2 | 1 | 50% |
| Lynchburg | 2 | 0 | 0% |
| Culpeper | 1 | 0 | 0% |
| Hampton Roads | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Group 2 channelizing devices | 512SD20-0024 | DAY | 35 | 26 (74%) | $1.00 | $1.00 |
| Regular seed | 603SD20-0003 | LB | 30 | 23 (77%) | $10.00 | $13.50 |
| Comb. curb & gutter, STD. CG-6 | 502SD20-0022 | LF | 31 | 20 (65%) | $34.00 | $29.10 |
| Inlet protection type B | 303SD20-0031 | EACH | 28 | 19 (68%) | $137.50 | $250.00 |
| Curb, STD. CG-2 | 502SD20-0011 | LF | 26 | 19 (73%) | $29.50 | $30.00 |
| CG-12 detectable warning surface | 13108 | SY | 25 | 19 (76%) | $270.00 | $408.50 |
| Flagger service | 512SD20-0027 | HR | 35 | 18 (51%) | $28.00 | $20.00 |
| Comb. curb & gutter, rad. CG-6 | 502SD20-0023 | LF | 26 | 17 (65%) | $33.89 | $30.00 |
| Curb, radial CG-2 | 502SD20-0012 | LF | 21 | 15 (71%) | $29.00 | $30.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 24 | 14 (58%) | $3.17 | $3.00 |
| Comb. curb & gutter, rad. CG-7 | 502SD20-0025 | LF | 20 | 14 (70%) | $31.50 | $29.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 35 | 13 (37%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Arthur Construction Co., Inc. | 15 | 8 of 15 |
| North Construction, Inc. | 8 | 4 of 8 |
| A & M Concrete Corp. | 7 | 4 of 7 |
| Finley Asphalt & Sealing, Inc. | 5 | 1 of 5 |
| Jireh Construction Company, Inc. | 5 | 0 of 5 |
| Fort Myer Construction Corporation | 3 | 2 of 3 |
| Virginia Infrastructure, Inc. | 3 | 1 of 3 |
| Ces Consulting, LLC | 3 | 0 of 3 |
| Tavares Concrete Co., Inc. | 3 | 3 of 3 |
| Pearson Construction, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000115201C01B | Richmond | Sidewalk construction | 3 of 4 | $911,645 | +43% |
| 23 SEP 2026 | C0000128748N01 | Northern Virginia | On call ada curb ramp improvements | 1 of 3 | $543,428 | Low, 8.0% under the second |
| 24 JUN 2026 | C0000128731N01 | Fredericksburg | On-call - ada curb ramp improvements | 2 of 4 | $414,327 | +25% |
| 15 DEC 2021 | C0000119781N01 | Staunton | Ada compliance - retrofit curb ramps along paving projects | 2 of 2 | $171,417 | +12% |
| 24 FEB 2021 | C0000107036M01 | Richmond | Pedestrian signal installations | 1 of 3 | $621,622 | Low, 58% under the second |
| 22 JUL 2020 | C0000000116664 | Hampton Roads | On-call ada compliance | 1 of 2 | $595,697 | Low, 6.0% under the second |
| 27 MAY 2020 | C0000116756S01 | Northern Virginia | Repair crosswalks on us 50 in middleburg | 2 of 3 | $627,030 | +31% |
| 22 APR 2020 | C0000116568N01 | Fredericksburg | On call ada compliance | 2 of 3 | $312,372 | +23% |
| 13 NOV 2019 | C0000112547N01 | Staunton | Sidewalk and crosswalk improvements | 1 of 2 | $301,300 | Low, 12% under the second |
| 21 AUG 2019 | C00000114901N01 | Northern Virginia | On-call ada compliance (loudoun and prince william) | 1 of 2 | $405,413 | Low, 29% under the second |
| 21 AUG 2019 | C00000114902N01 | Northern Virginia | On-call ada compliance (fairfax and arlington) | 1 of 2 | $540,709 | Low, 20% under the second |
| 24 JUL 2019 | C000111753C01 | Fredericksburg | Smart scale - left turn lane onto potomac creek drive | 3 of 3 | $1,050,954 | +3.0% |
| 22 MAY 2019 | C0000109523C01 | Staunton | Smart scale - brandy station park and ride lot expansion | 2 of 3 | $824,725 | +31% |
| 24 APR 2019 | C0000109528C01 | Lynchburg | Smartscale - right turn lane at rte 664 | 3 of 3 | $561,475 | +22% |
| 24 APR 2019 | C0000109549C01 | Culpeper | Smart scale - warrenton park and ride lot expansion | 2 of 3 | $668,779 | +13% |
| 24 APR 2019 | C0000113572N01 | Northern Virginia | Roadway departure crash mitigation | 2 of 3 | $358,860 | +18% |
| 23 JAN 2019 | C000112282C501 | Northern Virginia | Concrete repair replacement associated ada ramp installation | 1 of 1 | $152,313 | Low |
| 19 DEC 2018 | C0000102997N01 | Staunton | Construct right turn lane on route 608 | 2 of 3 | $212,024 | +9.0% |
| 19 DEC 2018 | C0000111050N01 | Staunton | Smart scale - papermill road turn lane | 1 of 1 | $367,162 | Low |
| 19 DEC 2018 | C0000114191N01 | Staunton | On-call ada compliance | 1 of 3 | $184,020 | Low, 55% under the second |
| 23 MAY 2018 | C000106240M01B | Fredericksburg | Install pedestrain accommodations | 1 of 2 | $1,174,539 | Low, 6.0% under the second |
| 25 APR 2018 | C0000109326N01 | Staunton | Smartscale - intersection improvements | 1 of 2 | $789,175 | Low, 17% under the second |
| 25 APR 2018 | C0000112118N01 | Northern Virginia | On-call ada compliance | 1 of 3 | $695,998 | Low, 10% under the second |
| 21 JUN 2017 | C0000092608N01 | Staunton | Ped and ada access safety improvements rte. 256 | 1 of 2 | $453,882 | Low, 2.0% under the second |
| 21 JUN 2017 | C0000108554N01 | Staunton | Magnolia ave. ped. ada safety improvement | 2 of 3 | $534,989 | 0.0% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.