North Construction, Inc.: VDOT bid record
North Construction, Inc. submitted 22 bids on Virginia DOT contracts in the data, from 26 APR 2017 to 28 OCT 2026, and was the low bidder on 7 of them (32%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $2,053,061
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 1 | 100% |
| 2019 | 4 | 1 | 25% |
| 2020 | 3 | 2 | 67% |
| 2021 | 1 | 1 | 100% |
| 2025 | 4 | 0 | 0% |
| 2026 | 9 | 2 | 22% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Fredericksburg | 5 | 2 | 40% |
| Northern Virginia | 5 | 2 | 40% |
| Staunton | 4 | 1 | 25% |
| Culpeper | 4 | 1 | 25% |
| Salem | 1 | 0 | 0% |
| Richmond | 1 | 0 | 0% |
| Lynchburg | 1 | 1 | 100% |
| Hampton Roads | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS mobilization on-call task order greater than $25,000 northern region | 513SX20-0001 | EACH | 12 | 12 (100%) | $1,625.00 | $5,788.09 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 21 | 9 (43%) | $1.00 | $1.00 |
| Electronic arrow board | 512SD20-0026 | HR | 19 | 9 (47%) | $5.00 | $5.00 |
| Inlet protection type B | 303SD20-0031 | EACH | 15 | 6 (40%) | $200.00 | $250.00 |
| Curb, STD. CG-3 | 502SD20-0014 | LF | 11 | 6 (55%) | $40.00 | $35.00 |
| Curb, radial CG-3 | 502SD20-0015 | LF | 11 | 6 (55%) | $40.00 | $32.00 |
| Port.changeable mess. sign | 512SD20-0025 | HR | 16 | 5 (31%) | $13.50 | $8.00 |
| Comb. curb & gutter, STD. CG-7 | 502SD20-0024 | LF | 13 | 5 (38%) | $40.00 | $29.00 |
| Comb. curb & gutter, rad. CG-7 | 502SD20-0025 | LF | 13 | 5 (38%) | $40.00 | $29.00 |
| Hydr. cement conc. sidewalk 4" | 504SD20-0003 | SY | 12 | 5 (42%) | $90.00 | $55.00 |
| NS saw-cut asph conc full depth | 315SX20-0011 | LF | 10 | 5 (50%) | $3.00 | $5.00 |
| Temporary sign | 512SD20-0014 | SF | 7 | 5 (71%) | $20.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & F Concrete, Inc. | 8 | 4 of 8 |
| Sagres Construction Corporation | 5 | 3 of 5 |
| Arthur Construction Co., Inc. | 4 | 2 of 4 |
| Finley Asphalt & Sealing, Inc. | 3 | 1 of 3 |
| Jireh Construction Company, Inc. | 3 | 0 of 3 |
| J. R. Caskey, Inc. | 2 | 2 of 2 |
| Posillico Civil, Inc. | 2 | 1 of 2 |
| BRANSCOME OPERATING, LLC dba BRANSCOME | 2 | 1 of 2 |
| Independence Excavating, Inc. | 2 | 1 of 2 |
| Allegheny Construction Company, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | C0000115201C01B | Richmond | Sidewalk construction | 2 of 4 | $900,848 | +41% |
| 23 SEP 2026 | C0000128748N01 | Northern Virginia | On call ada curb ramp improvements | 3 of 3 | $647,671 | +19% |
| 24 JUN 2026 | C0000128731N01 | Fredericksburg | On-call - ada curb ramp improvements | 1 of 4 | $331,715 | Low, 25% under the second |
| 24 JUN 2026 | C0000128466N01 | Culpeper | On call ada compliance ramps | 1 of 3 | $311,545 | Low, 27% under the second |
| 27 MAY 2026 | C0000119206C01 | Culpeper | Smart scale - int. improvements / lane addition | 5 of 6 | $2,401,708 | +29% |
| 27 MAY 2026 | C000113172C01D | Fredericksburg | Roadway operational improvements | 3 of 4 | $3,824,340 | +21% |
| 25 MAR 2026 | C0000126858N01 | Salem | On-call ada compliance curb ramp improvements | 5 of 6 | $1,147,385 | +64% |
| 25 FEB 2026 | C0000115132M01 | Staunton | Smart scale - pedestrian road improvements | 3 of 5 | $3,126,659 | +33% |
| 04 FEB 2026 | C000118872C501 | Culpeper | Smart scale - park & ride | 3 of 3 | $3,045,303 | +31% |
| 19 NOV 2025 | C0000123879C01 | Fredericksburg | Smart- scale - intersection improvements / lane ext. | 2 of 4 | $708,498 | +3.0% |
| 19 NOV 2025 | C0000115129N01 | Staunton | Smart scale - ramp widenings | 2 of 2 | $1,319,120 | +38% |
| 19 NOV 2025 | C0000119111C01 | Fredericksburg | Smart scale - r-cut road improvement | 5 of 5 | $2,697,915 | +56% |
| 22 OCT 2025 | C0000127217N01 | Staunton | Safety improvements - sign installation | 5 of 6 | $2,277,295 | +27% |
| 15 DEC 2021 | C0000119781N01 | Staunton | Ada compliance - retrofit curb ramps along paving projects | 1 of 2 | $153,585 | Low, 12% under the second |
| 16 DEC 2020 | C0000116581C01 | Northern Virginia | On-call ada concrete repair and replacement | 1 of 2 | $138,729 | Low, 75% under the second |
| 22 JUL 2020 | C0000000116664 | Hampton Roads | On-call ada compliance | 2 of 2 | $630,845 | +6.0% |
| 22 APR 2020 | C0000116568N01 | Fredericksburg | On call ada compliance | 1 of 3 | $254,239 | Low, 23% under the second |
| 21 AUG 2019 | C00000114901N01 | Northern Virginia | On-call ada compliance (loudoun and prince william) | 2 of 2 | $524,172 | +29% |
| 21 AUG 2019 | C00000114902N01 | Northern Virginia | On-call ada compliance (fairfax and arlington) | 2 of 2 | $646,940 | +20% |
| 22 MAY 2019 | C0000114700N01 | Lynchburg | On - call ada compliance curb ramp improvements | 1 of 3 | $281,848 | Low, 27% under the second |
| 23 JAN 2019 | C0000112068N01 | Culpeper | On call ada compliance | 2 of 2 | $540,350 | +1.0% |
| 26 APR 2017 | C00000110413N01 | Northern Virginia | Districtwide on-call ada compliance | 1 of 3 | $581,400 | Low, 8.0% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.