VDOT contract C000113172C01D bid tabulation
Roadway operational improvements. Let by Virginia DOT on May 27, 2026, Spotsylvania, Fredericksburg. 4 bids received; low bid $3,171,300 by Ardent Company, LLC.
- Owner
- Virginia DOT
- Letting
- 27 MAY 2026
- Pay items
- 141
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ardent Company, LLC | $3,171,300 | Low |
| 2 | Sagres Construction Corporation | $3,637,948 | +15% |
| 3 | North Construction, Inc. | $3,824,340 | +21% |
| 4 | J. L. Kent & Sons, Inc. | $4,583,451 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ardent Company, LLC | 2. Sagres Construction Corporation | 3. North Construction, Inc. | 4. J. L. Kent & Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0002) | ACRE | 0.24 | $45,000 | $40,000 | $100,000 | $174,000 |
| 0001-0020 | 15" storm sewer pipe (302SD20-0027) | LF | 275 | $90.00 | $300.00 | $350.00 | $280.00 |
| 0001-0030 | 24" storm sewer pipe (302SD20-0041) | LF | 11 | $110.00 | $400.00 | $500.00 | $490.00 |
| 0001-0040 | 18" end section ES-1 or 2 (302SD20-0200) | EACH | 1 | $1,471.37 | $1,500.00 | $6,000.00 | $2,260.00 |
| 0001-0050 | Drop inlet DI-2B,L=8' (302SD20-0243) | EACH | 2 | $7,000.00 | $16,500 | $13,500 | $11,000 |
| 0001-0060 | Drop inlet DI-3B,L=8' (302SD20-0313) | EACH | 3 | $6,500.00 | $14,500 | $14,000 | $9,025.00 |
| 0001-0070 | Manhole MH-1 or 2 (302SD20-0662) | LF | 3.50 | $350.00 | $2,250.00 | $3,800.00 | $3,031.00 |
| 0001-0080 | Frame & cover MH-1 (302SD20-0663) | EACH | 2 | $550.00 | $2,200.00 | $2,600.00 | $17,400 |
| 0001-0090 | Regular excavation (303SD20-0001) | CY | 646 | $45.00 | $140.00 | $20.00 | $400.70 |
| 0001-0100 | Borrow excavation (303SD20-0007) | CY | 500 | $35.00 | $130.00 | $20.00 | $95.00 |
| 0001-0110 | Check dam rock TY. I (303SD20-0022) | EACH | 1 | $250.00 | $400.00 | $1,000.00 | $1,170.00 |
| 0001-0120 | Siltation control excavation (303SD20-0029) | CY | 54 | $10.00 | $40.00 | $10.00 | $1.00 |
| 0001-0130 | Inlet protection type A (303SD20-0030) | EACH | 1 | $250.00 | $150.00 | $1,000.00 | $450.00 |
| 0001-0140 | Inlet protection type B (303SD20-0031) | EACH | 13 | $250.00 | $150.00 | $150.00 | $180.00 |
| 0001-0150 | Temp. silt fence type A (303SD20-0034) | LF | 800 | $1.00 | $5.00 | $10.00 | $7.10 |
| 0001-0160 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 678 | $30.00 | $60.00 | $5.00 | $118.00 |
| 0001-0170 | Crusher run aggr. no. 25 or 26 (308SX20-0003) | TON | 10 | $35.00 | $65.00 | $5.00 | $117.50 |
| 0001-0180 | Asphalt concrete TY. SM- 12.5A const (315SD20-0001) | TON | 700 | $130.00 | $250.00 | $260.00 | $248.60 |
| 0001-0190 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 160 | $130.00 | $250.00 | $260.00 | $325.40 |
| 0001-0200 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 212 | $130.00 | $250.00 | $260.00 | $299.50 |
| 0001-0210 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 1,382 | $2.00 | $5.00 | $5.00 | $14.50 |
| 0001-0220 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 41 | $60.00 | $150.00 | $120.00 | $80.00 |
| 0001-0230 | Erosion CTRL. stone CL. I, EC-1 (414SD20-0003) | TON | 17 | $60.00 | $150.00 | $120.00 | $270.00 |
| 0001-0240 | Underdrain UD-4 (501SD20-0004) | LF | 523 | $12.00 | $50.00 | $32.00 | $30.00 |
| 0001-0250 | Curb, STD. CG-3 (502SD20-0014) | LF | 135 | $25.00 | $130.00 | $65.00 | $115.80 |
| 0001-0260 | Curb, radial CG-3 (502SD20-0015) | LF | 23 | $25.00 | $135.00 | $65.00 | $332.00 |
| 0001-0270 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 455 | $35.00 | $140.00 | $65.00 | $88.00 |
| 0001-0280 | Comb. curb & gutter, rad. CG-6 (502SD20-0023) | LF | 487 | $35.00 | $145.00 | $65.00 | $100.30 |
| 0001-0290 | NS saw cut H.C.C. items directional island (502SX20-0010) | LF | 35 | $4.00 | $5.00 | $5.00 | $47.00 |
| 0001-0300 | R/W monument RM-2 (503SD20-0002) | EACH | 23 | $250.00 | $250.00 | $500.00 | $228.00 |
| 0001-0310 | Concrete class A3 misc. (504SD20-0001) | CY | 1 | $500.00 | $3,300.00 | $1,500.00 | $2,320.00 |
| 0001-0320 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 56 | $70.00 | $165.00 | $180.00 | $92.00 |
| 0001-0330 | Hydr. cement conc. sidewalk 7" (504SD20-0004) | SY | 8 | $130.00 | $300.00 | $200.00 | $845.00 |
| 0001-0340 | Demo. of pavement flexible (508SD20-0004) | SY | 532 | $15.00 | $50.00 | $40.00 | $51.00 |
| 0001-0350 | Flowable backfill (509SD20-0001) | CY | 4 | $300.00 | $600.00 | $500.00 | $980.00 |
| 0001-0360 | Adjust exist. valve & box (510SD20-0038) | EACH | 1 | $250.00 | $750.00 | $3,500.00 | $999.00 |
| 0001-0370 | Adjust exist frame & cover (510SD20-0050) | EACH | 1 | $350.00 | $1,000.00 | $1,500.00 | $4,350.00 |
| 0001-0380 | NS remove exist. valve box (510SX20-0040) | EACH | 3 | $150.00 | $800.00 | $1,000.00 | $2,440.00 |
| 0001-0390 | Allaying dust (511SD20-0001) | HR | 110 | $35.00 | $50.00 | $80.00 | $10.00 |
| 0001-0400 | Type 3 barricade 8' (512SD20-0013) | EACH | 1 | $350.00 | $500.00 | $500.00 | $720.00 |
| 0001-0410 | Temporary sign (512SD20-0014) | SF | 580 | $20.00 | $45.00 | $35.00 | $109.00 |
| 0001-0420 | Truck mounted attenuator (512SD20-0023) | HR | 1,840 | $5.00 | $25.00 | $50.00 | $78.00 |
| 0001-0430 | Group 2 channelizing devices (512SD20-0024) | DAY | 33,600 | $0.25 | $1.00 | $2.00 | $1.00 |
| 0001-0440 | Port.changeable mess. sign (512SD20-0025) | HR | 1,176 | $3.00 | $20.00 | $20.00 | $3.90 |
| 0001-0450 | Electronic arrow board (512SD20-0026) | HR | 1,840 | $1.50 | $10.00 | $15.00 | $6.00 |
| 0001-0460 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 3,325 | $0.88 | $2.00 | $7.00 | $5.50 |
| 0001-0470 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 824 | $6.00 | $15.00 | $8.00 | $12.00 |
| 0001-0480 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 2,112 | $0.77 | $2.00 | $0.80 | $8.00 |
| 0001-0490 | Temp. PVMT MRKG TY. A, 8" (512SD20-0048) | LF | 324 | $1.77 | $5.00 | $1.00 | $4.00 |
| 0001-0500 | Temp. PVMT MRKG TY. A, 24" (512SD20-0050) | LF | 159 | $4.00 | $10.00 | $5.00 | $15.00 |
| 0001-0510 | Temp. PVMT MRKG TY. E, 6" (512SD20-0054) | LF | 100 | $4.00 | $10.00 | $12.00 | $13.00 |
| 0001-0520 | Temp. PVMT MRKG TY. D, CL. III, 4" (512SD20-0061) | LF | 2,112 | $2.50 | $6.00 | $5.00 | $11.40 |
| 0001-0530 | Temp. PVMT MRKG TY. D, CL. III, 6" (512SD20-0062) | LF | 324 | $3.50 | $8.00 | $10.00 | $6.40 |
| 0001-0540 | Temp. PVMT MRKG TY. D, CL. III, 24" (512SD20-0065) | LF | 159 | $15.00 | $35.00 | $30.00 | $27.00 |
| 0001-0550 | NS modify signal (bragg RD) (512SX20-0020) | LS | 1 | $2,500.00 | $29,000 | $35,000 | $121,000 |
| 0001-0560 | NS modify signal (central park BLVD) (512SX20-0020) | LS | 1 | $2,500.00 | $29,000 | $35,000 | $241,745 |
| 0001-0570 | NS modify signal (heatherstone DR) (512SX20-0020) | LS | 1 | $2,500.00 | $29,000 | $35,000 | $98,000 |
| 0001-0580 | NS modify signal (salem church RD) (512SX20-0020) | LS | 1 | $2,500.00 | $26,250 | $35,000 | $201,500 |
| 0001-0590 | NS modify signal (taskforce DR) (512SX20-0020) | LS | 1 | $2,500.00 | $26,000 | $35,000 | $98,000 |
| 0001-0600 | Mobilization (513SD20-0001) | LS | 1 | $1,495,000 | $200,000 | $183,000 | $356,500 |
| 0001-0610 | Field office TY.III (514SD20-0003) | MO | 12 | $3,000.00 | $5,000.00 | $18,000 | $6,000.00 |
| 0001-0620 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 5,382 | $4.00 | $25.00 | $7.00 | $8.50 |
| 0001-0630 | NS demo. of BLDG. commercial sign (D-1) (516SX20-0008) | LS | 1 | $5,000.00 | $6,000.00 | $5,000.00 | $12,000 |
| 0001-0640 | Construction surveying constr. (517SD20-0001) | LS | 1 | $83,800 | $95,000 | $80,000 | $115,800 |
| 0001-0650 | 6" gate valve & box (520SD20-0089) | EACH | 1 | $3,500.00 | $6,500.00 | $6,000.00 | $3,600.00 |
| 0001-0660 | NS utilities fire hydrant (520SX20-0013) | EACH | 1 | $8,000.00 | $12,000 | $25,000 | $7,600.00 |
| 0001-0670 | NS water main 6" ductile iron (520SX20-0040) | LF | 14 | $250.00 | $550.00 | $800.00 | $600.00 |
| 0001-0680 | NS water main 8" ductile iron (520SX20-0040) | LF | 143 | $300.00 | $450.00 | $1,000.00 | $700.00 |
| 0001-0690 | Topsoil class B 2" (602SD20-0003) | ACRE | 0.25 | $12,000 | $25,000 | $30,000 | $120,000 |
| 0001-0700 | Regular seed (603SD20-0003) | LB | 47 | $3.00 | $10.00 | $30.00 | $180.00 |
| 0001-0710 | Overseeding (603SD20-0004) | LB | 38 | $3.00 | $10.00 | $30.00 | $15.00 |
| 0001-0720 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 1,513 | $1.00 | $1.50 | $3.00 | $1.44 |
| 0001-0730 | Fertilizer nitrogen - N (603SD20-0014) | LB | 20 | $2.00 | $10.00 | $30.00 | $4.60 |
| 0001-0740 | Fertilizer phosphorous - P (603SD20-0015) | LB | 13 | $2.00 | $10.00 | $30.00 | $4.60 |
| 0001-0750 | Fertilizer potassium - K (603SD20-0016) | LB | 13 | $2.00 | $10.00 | $30.00 | $4.60 |
| 0001-0760 | Lime (603SD20-0017) | TON | 0.88 | $250.00 | $500.00 | $1,000.00 | $518.00 |
| 0001-0770 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 10 | $100.00 | $625.00 | $500.00 | $106.00 |
| 0001-0780 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 5 | $200.00 | $405.00 | $200.00 | $649.50 |
| 0001-0790 | Relocate EX. 3 post GRND mount SGN panel (700SD20-0014) | EACH | 2 | $500.00 | $2,500.00 | $1,500.00 | $1,457.10 |
| 0001-0800 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 17.50 | $5.50 | $16.00 | $35.00 | $45.50 |
| 0001-0810 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 24 | $11.50 | $23.00 | $40.00 | $70.48 |
| 0001-0820 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 44.75 | $13.00 | $50.00 | $40.00 | $61.75 |
| 0001-0830 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 36.75 | $9.00 | $15.00 | $36.00 | $52.40 |
| 0001-0840 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 8 | $100.00 | $130.00 | $450.00 | $839.00 |
| 0001-0850 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 4 | $300.00 | $130.00 | $650.00 | $2,178.00 |
| 0001-0860 | Electrical service SE-5 (700SD20-0060) | EACH | 4 | $1,500.00 | $10,000 | $10,000 | $9,026.00 |
| 0001-0870 | Conc. found. PF-8 (700SD20-0068) | CY | 30 | $500.00 | $2,350.00 | $2,000.00 | $4,063.00 |
| 0001-0880 | Signal mast arm pole MP- 3, TY. A (700SD20-0090) | EACH | 1 | $30,000 | $27,000 | $35,000 | $24,400 |
| 0001-0890 | Signal mast arm pole MP- 3, TY. B1 (700SD20-0091) | EACH | 3 | $40,000 | $34,000 | $32,000 | $29,350 |
| 0001-0900 | Mast arm 49' (700SD20-0100) | EACH | 1 | $15,000 | $15,500 | $25,000 | $15,015 |
| 0001-0910 | Mast arm 60' (700SD20-0101) | EACH | 1 | $22,000 | $21,600 | $28,000 | $18,010 |
| 0001-0920 | Mast arm 75', case 1 loading (700SD20-0104) | EACH | 2 | $34,000 | $34,000 | $32,000 | $29,425 |
| 0001-0930 | 14/7 conductor cable (700SD20-0114) | LF | 9,440 | $2.00 | $6.50 | $5.00 | $3.74 |
| 0001-0940 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 5,530 | $1.00 | $5.00 | $4.00 | $1.44 |
| 0001-0950 | 14/2 conductor cable shielded (700SD20-0120) | LF | 21,645 | $1.00 | $5.00 | $4.00 | $3.27 |
| 0001-0960 | 6 conductor cable (700SD20-0143) | LF | 2,220 | $2.00 | $4.50 | $7.00 | $3.20 |
| 0001-0970 | Electrical service work pad (700SD20-0174) | EACH | 4 | $2,500.00 | $1,000.00 | $3,000.00 | $1,430.00 |
| 0001-0980 | Junction box JB-S2 (700SD20-0178) | EACH | 7 | $1,500.00 | $1,700.00 | $2,800.00 | $2,510.00 |
| 0001-0990 | Junction box JB-S3 (700SD20-0179) | EACH | 5 | $2,000.00 | $3,300.00 | $3,500.00 | $2,620.00 |
| 0001-1000 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 21 | $250.00 | $260.00 | $3,500.00 | $451.00 |
| 0001-1010 | Conduit PVC 1" (700SD20-0182) | LF | 90 | $10.00 | $15.00 | $35.00 | $28.80 |
| 0001-1020 | Conduit metal 1-1/4" (700SD20-0185) | LF | 75 | $12.00 | $75.00 | $45.00 | $40.20 |
| 0001-1030 | Bored conduit 4" (700SD20-0193) | LF | 955 | $25.00 | $105.00 | $100.00 | $121.50 |
| 0001-1040 | Conduit PVC 2" (700SD20-0194) | LF | 540 | $13.00 | $15.00 | $42.00 | $29.00 |
| 0001-1050 | Conduit PVC 3" (700SD20-0195) | LF | 70 | $14.00 | $32.00 | $45.00 | $30.00 |
| 0001-1060 | Conduit PVC 4" (700SD20-0196) | LF | 385 | $15.00 | $32.00 | $50.00 | $31.00 |
| 0001-1070 | Trench excavation eci-1 (700SD20-0197) | LF | 700 | $15.00 | $36.00 | $40.00 | $30.50 |
| 0001-1080 | Test bore (700SD20-0199) | EACH | 4 | $5,000.00 | $8,750.00 | $12,000 | $12,700 |
| 0001-1090 | NS traffic signalization (relocate existing cellular/PCS modem) (700SX20-0010) | EACH | 4 | $2,500.00 | $320.00 | $2,500.00 | $1,438.00 |
| 0001-1100 | NS traffic signalization atc cabinet 5-door configuration (32 outputs) (700SX20-0010) | EACH | 4 | $65,000 | $75,000 | $70,000 | $61,750 |
| 0001-1110 | NS traffic signalization install controller (700SX20-0010) | EACH | 4 | $3,500.00 | $21,000 | $8,000.00 | $1,150.00 |
| 0001-1120 | NS conc foundation CF-5 (700SX20-0022) | EACH | 4 | $2,500.00 | $1,700.00 | $3,000.00 | $9,143.00 |
| 0001-1130 | Sign panel (701SD20-0001) | SF | 237.06 | $50.00 | $50.00 | $100.00 | $85.40 |
| 0001-1140 | Local controller TY. A (703SD20-0003) | EACH | 4 | $8,000.00 | $10,500 | $50,000 | $9,775.00 |
| 0001-1150 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 91 | $350.00 | $1,600.00 | $650.00 | $661.00 |
| 0001-1160 | Video detection camera (703SD20-0014) | EACH | 2 | $6,000.00 | $12,500 | $6,000.00 | $9,090.00 |
| 0001-1170 | Video detection cable (703SD20-0015) | LF | 450 | $2.00 | $3.00 | $12.00 | $5.75 |
| 0001-1180 | Video detection system (703SD20-0016) | EACH | 1 | $21,500 | $7,250.00 | $17,000 | $28,750 |
| 0001-1190 | Loop detector amplifier (703SD20-0026) | EACH | 28 | $750.00 | $1,100.00 | $1,500.00 | $603.00 |
| 0001-1200 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 29 | $550.00 | $1,300.00 | $800.00 | $747.00 |
| 0001-1210 | Hanger assembly SMB-3, one way (703SD20-0039) | EACH | 1 | $300.00 | $550.00 | $800.00 | $690.00 |
| 0001-1220 | Loop saw cut 3/8" (703SD20-0042) | LF | 1,680 | $15.00 | $36.00 | $30.00 | $28.50 |
| 0001-1230 | Loop saw cut 5/8" (703SD20-0043) | LF | 485 | $20.00 | $36.00 | $35.00 | $62.90 |
| 0001-1240 | Remove existing pole (703SD20-0044) | EACH | 3 | $1,000.00 | $1,500.00 | $7,000.00 | $3,110.00 |
| 0001-1250 | Remove existing foundation (703SD20-0045) | EACH | 14 | $500.00 | $2,000.00 | $2,500.00 | $2,835.00 |
| 0001-1260 | Remove existing signal head (703SD20-0046) | EACH | 12 | $50.00 | $350.00 | $400.00 | $1,000.00 |
| 0001-1270 | Remove existing controller (703SD20-0047) | EACH | 4 | $500.00 | $86.00 | $5,000.00 | $822.00 |
| 0001-1280 | Remove existing manhole/junction box (703SD20-0048) | EACH | 16 | $250.00 | $900.00 | $1,200.00 | $1,800.00 |
| 0001-1290 | Uninterrupt. PWR supply type 2 (703SD20-0053) | EACH | 4 | $7,500.00 | $10,500 | $8,000.00 | $9,150.00 |
| 0001-1300 | Uninterrupt. PWR supply battery pac (703SD20-0054) | EACH | 4 | $4,500.00 | $8,250.00 | $8,000.00 | $4,800.00 |
| 0001-1310 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 4,223 | $0.92 | $2.50 | $3.00 | $2.46 |
| 0001-1320 | Type B class I PVMT line MRKG 8" (704SD20-0008) | LF | 648 | $2.00 | $5.00 | $10.00 | $4.20 |
| 0001-1330 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 318 | $18.00 | $25.00 | $35.00 | $26.30 |
| 0001-1340 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 34 | $90.00 | $200.00 | $250.00 | $288.00 |
| 0001-1350 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 17 | $255.00 | $700.00 | $750.00 | $500.00 |
| 0001-1360 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 16 | $355.00 | $850.00 | $850.00 | $826.00 |
| 0001-1370 | PVMT symb MRKG TRPL turn arr TY B CL II (704SD20-0054) | EACH | 1 | $700.00 | $1,600.00 | $1,500.00 | $896.00 |
| 0001-1380 | PVMT MSG. mark. “only” TY B, CL II, 8’ (704SD20-0108) | EACH | 2 | $500.00 | $1,200.00 | $750.00 | $948.00 |
| 0001-1390 | Removal of SRPM (704SP20-0001) | EACH | 16 | $100.00 | $120.00 | $150.00 | $276.00 |
| 0001-1400 | 5.8 GHZ wireless broadband radio (807SD20-0003) | EACH | 1 | $5,500.00 | $8,700.00 | $10,000 | $5,750.00 |
| 0001-1410 | MANAGED FIELD ETHERNET SWITCH Gbps (809SD20-0002) | EACH | 4 | $6,500.00 | $6,000.00 | $6,000.00 | $3,740.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of May 27, 2026. Compiled by Mirage Metrics.